First Notice | 7/27/2020 | 7/27/2020 | 8/11/2020 | | DONE |
Mike Jordan
|
|
|
MAILED 8-14-2020
|
BLD-Final | 7/24/2020 | 7/27/2020 | 7/27/2020 | A | PASS |
Mike Jordan
|
|
|
SCREENED // Kimbra Phone #: ###-####
|
DOC - Permit Finaled | 7/27/2020 | 7/27/2020 | 7/27/2020 | P | PASS |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 7/23/2020 | 7/23/2020 | 7/23/2020 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
call for access- Kimbra *screened* Phone #: ###-####
|
Zoning Approval | 7/23/2020 | 7/23/2020 | 7/23/2020 | | DONE |
Celine Acord
|
|
|
|
FIRE-Conference | 7/21/2020 | 7/21/2020 | 7/21/2020 | P | DONE |
Troy Cobbley
|
|
|
We went over life safety requirements.
Kimbra ###-####
|
BLD-Final | 7/17/2020 | 7/17/2020 | 7/17/2020 | P | CANC |
Mike Jordan
|
|
|
Screened-Cliff Phone #: ###-####.
|
PubWorks Occupancy Approval | 7/17/2020 | 7/17/2020 | 7/17/2020 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Conference | 12/2/2019 | 12/2/2019 | 12/2/2019 | P | PASS |
Mike Jordan
|
|
|
aDAM Phone #: ###-####
|
BLD-Wall Bracing | 11/27/2019 | 11/27/2019 | 11/27/2019 | P | PASS |
Mike Jordan
|
|
|
FIRE WALL // Adam Phone #: ###-####
|
BLD-Conference | 11/22/2019 | 11/22/2019 | 11/22/2019 | P | DONE |
Mike Jordan
|
|
|
Adam Phone #: ###-####
|
BLD-Framing/Rough-in | 10/14/2019 | 10/15/2019 | 10/15/2019 | P | PASS |
Mike Jordan
|
|
|
Kimbra Phone #: ###-####. Observed install of 3 1/2 inch all thread rods epoxied into concrete footing. All holes were blown clean and brushed. All work was done per the engineers RFI and manufactures instructions.
|
BLD-Conference | 9/18/2019 | 9/19/2019 | 9/19/2019 | A | CANC |
Mike Jordan
|
|
|
|
BLD-Conference | 9/17/2019 | 9/18/2019 | 9/18/2019 | P | DONE |
Mike Jordan
|
|
|
Call ahead 20 minutes - foundation poured in wrong spot - need advice // Kimbra Phone #: ###-####
|
BLD-Concrete | 8/20/2019 | 8/22/2019 | 8/22/2019 | P | PASS |
Mike Jordan
|
|
|
after 2pm // Doug Phone #: ###-####. Welded wire mesh for slab on grade ok.
|
BLD-Concrete | 8/5/2019 | 8/6/2019 | 8/6/2019 | P | PASS |
Mike Jordan
|
|
|
rebar- after 2:30pm please- Doug Phone #: ###-####. Ties replaced. ok.
|
BLD-Foundation | 8/6/2019 | 8/6/2019 | 8/6/2019 | P | PASS |
Mike Jordan
|
|
|
rebar- after 2:30pm please- Doug Phone #: ###-####
|
BLD-Footing | 7/19/2019 | 7/23/2019 | 7/23/2019 | P | CANC |
Mike Jordan
|
|
|
rebar - after 2 pm // Doug Phone #: ###-####
|
BLD-Foundation | 7/23/2019 | 7/23/2019 | 7/23/2019 | P | FAIL |
Mike Jordan
|
|
|
rebar - after 2 pm // Doug Phone #: ###-####. Hairpins not installed around anchor bolts. #3 ties do not conform to ACI standards. Ties are not continous and missing hooks. Contractor noted that this rebar was donated. Noted to contractor that the ties still need to meet ACI.
|
BLD-Foundation | 7/10/2019 | 7/10/2019 | 7/10/2019 | P | PASS |
Mike Jordan
|
|
|
Doug - after 2pm Phone #: ###-####. Footings ok. City approved plans on site. Noted that building pad appears to be built up 3/4 inch road mix. Footings appear to be on undisturb native soils. Called and have left message with owner, Micheal Moore, to call me back to discuss pad and if compaction testing was completed.
|
BLD-Concrete | 7/1/2019 | 7/3/2019 | 7/3/2019 | P | NR |
Mike Jordan
|
|
|
late afternoon - rebar // Doug Phone #: ###-####. Needs to provide the city set of approved plans. Also noted to concrete contractor that special inspection is required.
|
Issue PAID IN FULL permit | | | 3/25/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/25/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/25/2019 | | DONE |
|
|
|
|
Telephone call | | | 3/25/2019 | | DONE |
|
|
|
emailed clcox2211@msn.com permits to be signed
|
Extend Review Timeline | | | 1/3/2019 | | DONE |
|
|
|
1st approved 180 day extension per adele. see documents
|
Meeting | | | 12/28/2018 | | DONE |
|
|
|
sent in extension request 12-28-18
|
Telephone call | | | 12/27/2018 | | DONE |
|
|
|
Spoke with Michael informing him that this permit is going to expire in 6 days. stated he is welcome to send in a request if not ready to pick the permit up.
|
Telephone call | | | 12/24/2018 | | DONE |
|
|
|
Left a message for Michael informing tired to send a letter about expiring permit and just needed to get an updated address from him
|
Expiration Notice | 12/11/2018 | 1/3/2019 | 12/11/2018 | | DONE |
Brittany Hill
|
|
|
|
OVERRIDE | | | 11/14/2018 | | |
|
|
|
|
Plan assigned to (JHB) | 8/23/2018 | 8/23/2018 | 11/14/2018 | | PASS |
Joe Bruce
|
|
|
*(2nd Rev Comp) 10/01 (502) - Love Inc Storage (Struc)
|
Routing Off Site - STRUCTURAL | 11/13/2018 | | 11/14/2018 | | PASS |
Joe Bruce
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/14/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/14/2018 | | DONE |
|
|
|
ALL MET email: clcox2211@msn.com
NEED
GC FORM
REVISED VALUE
MET
ACHD
RP
|
Plan resubmittals received | | | 11/9/2018 | | DONE |
Joe Bruce
|
|
|
Received revised structural calculations with stamp/signature. **JHB**
|
Routing PW Drainage | 10/31/2018 | | 10/31/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLAN CHECK | 10/24/2018 | | 10/29/2018 | | PASS |
Joe Bruce
|
|
|
|
Plan resubmittals requested | | | 10/29/2018 | | FAIL |
Joe Bruce
|
|
|
Emailed applicant regarding information need from structural plan review. **JHB**
|
Routing Off Site - STRUCTURAL | 10/24/2018 | | 10/25/2018 | | FAIL |
Joe Bruce
|
|
|
Chris Holladay - AHJ Engineers
|
Plan resubmittals received | | | 10/24/2018 | | DONE |
Joe Bruce
|
|
|
|
Route to Impact Fee Review | 10/3/2018 | 10/6/2018 | 10/4/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 8/23/2018 | 8/23/2018 | 10/3/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
1st review completed | | | 10/3/2018 | | FAIL |
Joe Bruce
|
|
|
|
Plan resubmittals requested | | | 10/3/2018 | | DONE |
Joe Bruce
|
|
|
Emailed Plan Review Report to applicant on 10/01. **JHB**
|
Routing Off Site - STRUCTURAL | 8/23/2018 | | 10/1/2018 | | FAIL |
Joe Bruce
|
|
|
Chris Holladay - AHJ Engineers (Corrections Required)
|
Routing - PLAN CHECK | 8/23/2018 | | 10/1/2018 | | FAIL |
Joe Bruce
|
|
|
Emailed architect plan review report on 10/01.
|
Routing - Erosion and Sediment | 8/23/2018 | | 8/27/2018 | | PASS |
Michael Zawacki
|
|
|
RP needed. SWPPP narative states prime hasn't been selected at time of writing.
|
Routing - Addressing | 8/23/2018 | | 8/24/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/23/2018 | | 8/24/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Drainage | 8/24/2018 | | 8/24/2018 | | FAIL |
Brian Murphy
|
|
|
NEED DRAINAGE LETTERE REPORT
|
Plans ACCEPTED BY PLAN TECH | | | 8/23/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/23/2018 | | DONE |
|
|
|
|
Routing - PLANNING | 8/23/2018 | | 8/23/2018 | | PASS |
Celine Acord
|
|
|
per CUP18-00007
|
Intake Approval | | | 8/21/2018 | | PASS |
|
|
|
|
Intake Approval | | | 8/10/2018 | | FAIL |
|
|
|
|
Intake Approval | | | 7/26/2018 | | FAIL |
|
|
|
|
Intake Approval | | | 7/19/2018 | | FAIL |
|
|
|
|
Application received | | | 7/6/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 6 2018 10:53AM
|
Second Notice | | 8/21/2020 | | | |
|
|
|
|