BLD-Final | 6/4/2019 | 6/4/2019 | 6/4/2019 | P | PASS |
Dave Hannah
|
|
|
tim Phone #: ###-####
|
DOC - Permit Finaled | 6/4/2019 | 6/4/2019 | 6/4/2019 | P | PASS |
Dave Hannah
|
|
|
|
Permanent Occupancy | | | 6/4/2019 | | DONE |
|
|
|
|
BLD-Final | 6/3/2019 | 6/3/2019 | 6/3/2019 | P | PEND |
Dave Hannah
|
|
|
Tim- please call for access Phone #: ###-#### needs site plan and blower door test
|
CHANGE STATUS TO (ISS) | | | 5/22/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 5/15/2019 | | |
|
|
|
|
Permit Ready to Issue | | | 5/15/2019 | | DONE |
|
|
|
PLAN MOD DO NOT REISSUE
|
Routing - FIRE | 5/7/2019 | 5/7/2019 | 5/14/2019 | | PASS |
Lee G Meredith
|
|
|
Applicant added a note to the site plan indicating an NFPA 13D sprinkler system will be provided.
|
Plan assigned to (J_N) | 4/22/2019 | 4/22/2019 | 5/14/2019 | | DONE |
|
|
|
Plan mod - 2nd review, failed fire. changing unheated storage to finished space. Need to show correct wall section, specify mini split
|
BLD-Conference | 4/18/2019 | 5/9/2019 | 5/9/2019 | P | CANC |
Jim Sly
|
|
|
Check back........ Under review.....
|
Routing - PLAN CHECK | 5/7/2019 | | 5/7/2019 | | PASS |
Jenny Nelson
|
|
|
one hour plan mod fee
|
Routing - FIRE | 4/22/2019 | 4/22/2019 | 4/24/2019 | | FAIL |
Lee G Meredith
|
|
|
05/06 Fell Residence 402
SUEZ fire flow availability report requried. Emailed review comments and explanation to applicant.
5/7/19 received fire flow report. 1500 gmp is inadequate. Access distance not addressed. Sprinklers required. Emailed new review comments and explanation to applicant.
|
1st review completed | | | 4/24/2019 | | FAIL |
Jenny Nelson
|
|
|
|
Routing - PLAN CHECK | 4/22/2019 | | 4/24/2019 | | FAIL |
Jenny Nelson
|
|
|
Provide correct wall section for conditioned space, specify mini split if using.
|
Meeting | | | 4/22/2019 | | DONE |
|
|
|
there was a parcel hold on parcel hold said:Plan Modification requred to be submitted for conditioning "Unheated Storage" area on main floor plan. Inspections allowed on all other areas. When plans are submitted NEED to route to Planning to verify ADU requirements. 4/11/19 leg-4-22-19 plan mod was started to removed parcel hold CAN
|
Routing - PLANNING | 4/22/2019 | | 4/22/2019 | | PASS |
Sue Cummings
|
|
|
to check the requirements for ADU. Nope, no ADU. House is set so far off the stree, please route to Fire.
|
Plan Modification Accepted | | | 4/22/2019 | | DONE |
|
|
|
starting plan mod for Brian-changing unheated storage to heated storage-A0.0, A0.1 & A-3 and res check
|
BLD-Conference | 4/12/2019 | 4/18/2019 | 4/18/2019 | P | DONE |
Jim Sly
|
|
|
Check on progress.... Same......no humans....no activity. C/N Conditioning of "unheated" storage space on main floor, not per approved plan. Contact Boise City for plan modification. 2nd notice.
|
BLD-Conference | 4/11/2019 | 4/12/2019 | 4/12/2019 | A | DONE |
Jim Sly
|
|
|
Issue CN to provide a plan modification to plan review for modifications made to structure. C/N posted on window.
|
BLD-Energy code compliance | 12/19/2018 | 12/19/2018 | 12/19/2018 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Lewis
|
BLD-Framing/Rough-in | 12/17/2018 | 12/18/2018 | 12/18/2018 | A | PART |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Lewis C/N posted.....fireblock HVAC chase.
|
Plan Modification Accepted | | | 12/14/2018 | | DONE |
|
|
|
New manual j report
|
Routing - MECHANICAL | 12/14/2018 | | 12/14/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 10/31/2018 | 11/1/2018 | 11/1/2018 | A | PASS |
Jim Sly
|
|
|
Louis Phone #: ###-####
|
BLD-Wall Bracing | 10/30/2018 | 10/31/2018 | 10/31/2018 | A | NR |
Jim Sly
|
|
|
shear // Leuis Phone #: ###-####
|
BLD-Foundation | 9/19/2018 | 9/19/2018 | 9/19/2018 | P | PASS |
Jim Sly
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 9/18/2018 | 9/18/2018 | 9/18/2018 | P | PASS |
Jim Sly
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
Inspection Record Card- Bld | | | 9/14/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/20/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 8/9/2018 | | |
|
|
|
|
Plan assigned to (M_H) | 8/6/2018 | | 8/9/2018 | | DONE |
Michael Hanson
|
|
|
07/20 sfd L1 ePlan. 2nd review complete - update energy code. 1st review complete - structural deficiencies, wall bracing, energy code
|
Routing - PLANNING | 8/9/2018 | | 8/9/2018 | | PASS |
Sue Cummings
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/9/2018 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 8/9/2018 | | DONE |
|
|
|
met
|
Plan assigned to (J_N) | 7/20/2018 | 7/20/2018 | 8/3/2018 | | |
Jenny Nelson
|
|
|
07/20 sfd L1 ePlan. 2nd review complete - update energy code. 1st review complete - structural deficiencies, wall bracing, energy code
|
Routing - PLAN CHECK | 8/3/2018 | | 8/3/2018 | | PASS |
Michael Hanson
|
|
|
Per review with JJN. MDH
|
Routing - PLAN CHECK | 7/31/2018 | | 7/31/2018 | | FAIL |
Michael Hanson
|
|
|
Energy deficencies, RESCheck and plan insulation and u values must match. MDH
|
1st review completed | | | 7/24/2018 | | FAIL |
|
|
|
Structural Deficiencies, wall bracing measurements and wind speed, update energy code ResCheck, provide design criteria.
|
Routing - PLAN CHECK | 7/9/2018 | | 7/24/2018 | | FAIL |
|
|
|
|
Plan assigned to (M_H) | 7/9/2018 | | 7/20/2018 | | DEFR |
Michael Hanson
|
|
|
07/20 sfd L1 ePlan. 1st review complete - structural deficiencies, wall bracing, energy code, design criteria.
|
Routing - MECHANICAL | 7/16/2018 | | 7/16/2018 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 7/9/2018 | 7/12/2018 | 7/10/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 7/9/2018 | | 7/10/2018 | | FAIL |
Troy James
|
|
|
Emailed corrections to integrity.
|
Routing - Addressing | 7/9/2018 | | 7/9/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 7/9/2018 | | 7/9/2018 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/9/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/9/2018 | | DONE |
|
|
|
|
Intake Approval | | | 7/9/2018 | | PASS |
Candy A. Nichols
|
|
|
|
Application received | | | 7/6/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 6 2018 12:35PM
|
First Notice | | 6/14/2019 | | | |
|
|
|
|
Routing - PLANNING | 7/9/2018 | | | | FAIL |
|
|
|
Please show concrete on the site plan.
|
Routing - PLANNING | 7/31/2018 | | | | FAIL |
|
|
|
Need to show concrete driveway
|
Routing - PLANNING | 8/3/2018 | | | | FAIL |
|
|
|
Needs a driveway (concrete asphalt or wheel strips) into the site
|