BLD-Final | 7/29/2019 | 7/30/2019 | 7/30/2019 | P | PASS |
Tell Riley
|
|
|
I will likely be unavailable by phone in the AM. alternate phone would be my wife''s ###-####. Later afternoon would be ideal, however there should be someone at home throughout the afternoon as your schedule allows. Phone #: ###-#### Inspection requested via web by Tyler Stewart//final complete per plans//all trades finals complete//smoke and carbon monoxide detectors installed per plans//
|
DOC - Permit Finaled | 7/30/2019 | 7/30/2019 | 7/30/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD - Request for Extension | 6/13/2019 | 6/13/2019 | 6/13/2019 | P | PASS |
Tell Riley
|
|
|
Project nearing completion. I just need a few more weeks to wrap up the fireplace and get insulation in to be ready for final inspection. Requesting one month extension. Phone #: ###-#### Inspection requested via web by Tyler Stewart//Talked with Tyler and granted extension.//
|
BLD - Resubmittal Approved | 6/12/2019 | 6/13/2019 | 6/13/2019 | A | CANC |
Tell Riley
|
|
|
Project nearing completion. I just need a few more weeks to wrap up the fireplace and get insulation in to be ready for final inspection. Requesting one month extension. Phone #: ###-#### Inspection requested via web by Tyler Stewart
|
BLD-Framing/Rough-in | 12/17/2018 | 12/17/2018 | 12/17/2018 | P | PASS |
Jim Sly
|
|
|
Please call to confirm necessity of inspection as I am to insulate tomorrow, but am unsure whether framing needs to be inspected before insulation, or just before drywall. Phone #: ###-#### Inspection requested via web by Tyler Stewart
|
BLD-Wall cover | 10/16/2018 | 10/17/2018 | 10/17/2018 | P | PASS |
Jim Sly
|
|
|
Wall bracing inspection. Interior can be accessed through window opening on the back of the house. Phone #: ###-#### Inspection requested via web by Tyler Stewart
|
BLD-Foundation | 8/6/2018 | 8/6/2018 | 8/6/2018 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Tyler Stewart
|
BLD-Footing | 7/24/2018 | 7/24/2018 | 7/24/2018 | P | PASS |
Jim Sly
|
|
|
Prefer later afternoon if possible, but I should be able to be on site either way if given ~30-45 minutes advance notice. Phone #: ###-#### Inspection requested via web by Tyler Stewart
|
Routing Walk-In (BLD) | 7/17/2018 | 7/17/2018 | 7/17/2018 | P | PASS |
Michael Hanson
|
|
|
|
Routing - PLAN CHECK | 7/17/2018 | | 7/17/2018 | | PASS |
Michael Hanson
|
|
|
|
Inspection Record Card- Bld | | | 7/17/2018 | | DONE |
Michael Hanson
|
|
|
|
Case Summary (BLD) | | | 7/17/2018 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/17/2018 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 7/17/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/17/2018 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 7/9/2018 | 7/9/2018 | 7/9/2018 | A | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 7/9/2018 | 7/9/2018 | 7/9/2018 | A | FAIL |
Michael Hanson
|
|
|
Applicant to return with floor joist, footing, and existing wall construction information. Asked for foundation plan showing plan for existing floor joist and new floor joist. MDH
|
1st review completed | | | 7/9/2018 | | FAIL |
Michael Hanson
|
|
|
Applicant to return with floor joist, footing, and existing wall construction information. Asked for foundation plan showing plan for existing floor joist and new floor joist. MDH
|
Routing - PLAN CHECK | 7/9/2018 | | 7/9/2018 | | FAIL |
Michael Hanson
|
|
|
Applicant to return with floor joist, footing, and existing wall construction information. Asked for foundation plan showing plan for existing floor joist and new floor joist. MDH
|
Application received | | 7/9/2018 | | | |
|
|
|
|