BLD-Final | 5/15/2019 | 5/15/2019 | 5/15/2019 | P | PASS |
Brandon Shaw
|
|
|
Paul Phone #: ###-####
|
DOC - Permit Finaled | 5/15/2019 | 5/15/2019 | 5/15/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Framing/Rough-in | 10/4/2018 | 10/4/2018 | 10/4/2018 | P | PASS |
Jim Sly
|
|
|
Paul Phone #: ###-#### Frame and Energy OK.
|
BLD-Framing/Rough-in | 7/20/2018 | 7/20/2018 | 7/20/2018 | P | PART |
Jim Sly
|
|
|
beam inreplace of bearing wall // Paul or Karen or ###-#### (cell) Phone #: ###-#### Beam above ceiling......OK.
|
Routing Walk-In (BLD) | 7/9/2018 | 7/9/2018 | 7/9/2018 | A | FAIL |
Josh Bogle
|
|
|
|
Routing Walk-In (BLD) | 7/9/2018 | 7/9/2018 | 7/9/2018 | P | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 7/9/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 7/9/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/9/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 7/9/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/9/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/9/2018 | | 7/9/2018 | | FAIL |
Josh Bogle
|
|
|
needed structural info
|
1st review completed | | | 7/9/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 7/9/2018 | | 7/9/2018 | | PASS |
Josh Bogle
|
|
|
|
Application received | | 7/9/2018 | | | |
|
|
|
|