Permanent Occupancy | | | 8/14/2018 | | DONE |
|
|
|
|
BLD-Final | 7/31/2018 | 7/31/2018 | 7/31/2018 | P | PASS |
Jim Storey
|
|
|
Joseph Phone #: ###-#### per reviewed occ list.
|
FIRE-Final Inspection | 7/30/2018 | 7/30/2018 | 7/30/2018 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. The building inspector will verify that the tenant provides approved covering of the insullation in the front area.
Please call ahead for access - Joseph Phone #: ###-####
|
BLD-Final | 7/12/2018 | 7/13/2018 | 7/13/2018 | P | NR |
Jim Storey
|
|
|
Joseph Phone #: ###-#### fire failled
|
FIRE-Final Inspection | 7/12/2018 | 7/13/2018 | 7/13/2018 | A | FAIL |
Jim Page
|
|
|
Install signage on interior of main entry ready "Door to remain unlocked while building is occupied". Install exit signs as shown on city approved drawings. Install escutcheons that are missing in office area. Fire extinguisher inspection expire in August 2018.
Joseph Phone #: ###-####
|
Plan assigned to (CDM) | 7/12/2018 | 7/12/2018 | 7/12/2018 | | DONE |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 7/12/2018 | | DONE |
|
|
|
|
Telephone call | | | 7/12/2018 | | DONE |
|
|
|
Called Joseph to advise permit is ready to issue
|
Permit Ready to Issue | | | 7/12/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/12/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/12/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | | | 7/12/2018 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 7/12/2018 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/12/2018 | | DONE |
|
|
|
|
Routing - FIRE | 7/9/2018 | 7/9/2018 | 7/9/2018 | | PASS |
Erika Akin
|
|
|
No work is allowed under this permit. No comments attached. Inspector to field verify basic life safety.
|
Intake Approval | | | 7/9/2018 | | PASS |
|
|
|
per JG
|
Recd Pcfee & Taken To Pln CK | | | 7/9/2018 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/9/2018 | | DONE |
|
|
|
|
Routing PW Environmental | 7/9/2018 | | 7/9/2018 | | PASS |
Rick Christenson
|
|
|
|
Routing - Addressing | 7/9/2018 | | 7/9/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | | | 7/9/2018 | | PASS |
|
|
|
|
Application received | | 7/9/2018 | | | |
|
|
|
|