BLD-Final | 5/14/2019 | 5/14/2019 | 5/14/2019 | P | PASS |
Tony Young
|
|
|
Mitch Phone #: ###-####
|
DOC - Permit Finaled | 5/14/2019 | 5/14/2019 | 5/14/2019 | P | PASS |
Tony Young
|
|
|
|
PubWorks Occupancy Approval | 5/14/2019 | 5/14/2019 | 5/14/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Final | 5/2/2019 | 5/8/2019 | 5/8/2019 | A | NR |
Tony Young
|
|
|
Mitch Phone #: ###-####
|
BLD-Final | 5/2/2019 | 5/2/2019 | 5/3/2019 | P | NR |
Tony Young
|
|
|
Mitch Phone #: ###-####
|
BLD-Energy code compliance | 12/28/2018 | 12/31/2018 | 1/2/2019 | P | PASS |
Tony Young
|
|
|
Drywall cover insp. Phone #: ###-#### Inspection requested via web by Mitch Cornell
|
BLD-Wall cover | 12/28/2018 | 12/28/2018 | 12/28/2018 | P | PART |
Tony Young
|
|
|
Drywall cover insp. Phone #: ###-#### Inspection requested via web by Mitch Cornell,, see paint,, header, fire blocking
|
BLD-Framing/Rough-in | 12/19/2018 | 12/19/2018 | 12/19/2018 | P | PART |
Jim Storey
|
|
|
Middle P.M if possible Phone #: ###-#### Inspection requested via web by Mitch Cornell need header at stair supporting 2nd floor roof truss/ need hvac aproval // ok to insulate.
|
BLD-Energy code compliance | 12/18/2018 | 12/18/2018 | 12/18/2018 | P | PART |
Brandon Shaw
|
|
|
Foam/air seal ok...
|
BLD-Wall Bracing | 11/5/2018 | 11/6/2018 | 11/6/2018 | A | PASS |
Tony Young
|
|
|
shear // Johnny Phone #: ###-####,, exterior ok
|
BLD-Conference | 11/5/2018 | 11/5/2018 | 11/5/2018 | A | PASS |
Tony Young
|
|
|
Verify ridge height,, 23'6" on the front,, about 32' 7" on the rear
|
BLD-Footing | 10/18/2018 | 10/19/2018 | 10/19/2018 | A | PASS |
Tony Young
|
|
|
Andy Phone #: ###-####
|
BLD-Footing | 10/17/2018 | 10/18/2018 | 10/18/2018 | A | PEND |
Tony Young
|
|
|
Andy Phone #: ###-####
|
PubWorks Subgrade Approval | 10/18/2018 | 10/18/2018 | 10/18/2018 | | DONE |
Melissa Jannusch
|
|
|
FOR RESIDENTIAL GARAGE FOOTINGS. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 10/16/2018 | 10/17/2018 | 10/17/2018 | A | PEND |
Tony Young
|
|
|
Andy Phone #: ###-####,, ok pending soils approval,, garage footings
|
BLD-Foundation | 9/24/2018 | 9/25/2018 | 9/25/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Foundation | 9/17/2018 | 9/18/2018 | 9/18/2018 | A | PART |
Tony Young
|
|
|
Andy Phone #: ###-####,, basement footings ok,, need to verify 10 foot rule at the final for bottom of footing on daylight side
|
PubWorks Subgrade Approval | 9/18/2018 | 9/18/2018 | 9/18/2018 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 9/14/2018 | 9/17/2018 | 9/17/2018 | P | NR |
Tony Young
|
|
|
Andy Phone #: ###-####,, basement footings,, needs soils approval 1st
|
OVERRIDE | | | 7/25/2018 | | |
|
|
|
|
Inspection Record Card- Bld | | | 7/25/2018 | | DONE |
|
|
|
|
Telephone call | | | 7/25/2018 | | DONE |
|
|
|
Left message for Mitch informing this permit is ready and the fee amount due for issuance
|
Issue PAID IN FULL permit | | | 7/25/2018 | | DONE |
|
|
|
|
Plan assigned to (M_H) | 7/9/2018 | | 7/25/2018 | | DONE |
Michael Hanson
|
|
|
07/26 sfd L2 Paper. 1st review completed - Structural deficiences. MDH
|
Routing - PLAN CHECK | 7/25/2018 | | 7/25/2018 | | PASS |
Michael Hanson
|
|
|
|
Case Summary (BLD) | | | 7/25/2018 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/25/2018 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 7/25/2018 | | DONE |
|
|
|
All requirements met
|
Routing - FIRE | 7/19/2018 | | 7/23/2018 | | PASS |
Tim Frost
|
|
|
7/26 New SFH paper
|
Routing - PLAN CHECK | | | 7/23/2018 | | FAIL |
Michael Hanson
|
|
|
Structural deficiences. MDH
|
1st review completed | | | 7/23/2018 | | FAIL |
Michael Hanson
|
|
|
Structural deficiences. MDH
|
Routing - Erosion and Sediment | 7/18/2018 | | 7/19/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan with narrative and BMP site map approved. Certified PD and RP for project. Site preparation inspeciton is required.
|
Routing - MECHANICAL | | | 7/18/2018 | | PASS |
|
|
|
|
Routing - PLANNING | 7/17/2018 | | 7/18/2018 | | PASS |
Nicolette Womack
|
|
|
CFH18-00066 Nicolette
|
Routing PW Grading-Hillside | 7/10/2018 | | 7/17/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Routing - PUBLIC WORKS | 7/17/2018 | | 7/17/2018 | | PASS |
Morgan Webb
|
|
|
|
Route to Impact Fee Review | 7/10/2018 | 7/13/2018 | 7/11/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing PW Sewer Rating | 7/10/2018 | | 7/10/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - Addressing | 7/10/2018 | | 7/10/2018 | | PASS |
Doug Chausow
|
|
|
|
Intake Approval | | | 7/9/2018 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/9/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/9/2018 | | DONE |
|
|
|
|
Application received | | 7/9/2018 | | | |
|
|
|
|