Permit Information
Permit NumberBLD18-02422
StatusFinaled
Name GRANITE CONTRACTING LLC
Site Address 3001 N LANCASTER PL
Project NamePunt residence
Customer Number(CFH18-00066)
ePlanReviewNo
Description
***Prescriptive component energy approach*** WUI zone A requirements*** Permit for the construction of a new 3836 sq. ft., three level (basement level 1216 sq. ft., main level 1216 sq. ft., upper level 1404 sq. ft.) single family dwelling with 3 bedrooms, 3.5 bathrooms, approximately 50 sq. ft. of covered patio/porch and a 870 sq. ft. attached garage per the approved plans and any notations. R-1B zoning and setbacks per planning. MDH


A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.


Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/14/20195/14/20195/14/2019PPASS
DetailsTony Young
Mitch Phone #: ###-####
DOC - Permit Finaled5/14/20195/14/20195/14/2019PPASS
DetailsTony Young
PubWorks Occupancy Approval5/14/20195/14/20195/14/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.

BLD-Final5/2/20195/8/20195/8/2019ANR
DetailsTony Young
Mitch Phone #: ###-####
BLD-Final5/2/20195/2/20195/3/2019PNR
DetailsTony Young
Mitch Phone #: ###-####
BLD-Energy code compliance12/28/201812/31/20181/2/2019PPASS
DetailsTony Young
Drywall cover insp. Phone #: ###-#### Inspection requested via web by Mitch Cornell
BLD-Wall cover12/28/201812/28/201812/28/2018PPART
DetailsTony Young
Drywall cover insp. Phone #: ###-#### Inspection requested via web by Mitch Cornell,, see paint,, header, fire blocking
BLD-Framing/Rough-in12/19/201812/19/201812/19/2018PPART
DetailsJim Storey
Middle P.M if possible Phone #: ###-#### Inspection requested via web by Mitch Cornell need header at stair supporting 2nd floor roof truss/ need hvac aproval // ok to insulate.
BLD-Energy code compliance12/18/201812/18/201812/18/2018PPART
DetailsBrandon Shaw
Foam/air seal ok...
BLD-Wall Bracing11/5/201811/6/201811/6/2018APASS
DetailsTony Young
shear // Johnny Phone #: ###-####,, exterior ok
BLD-Conference11/5/201811/5/201811/5/2018APASS
DetailsTony Young
Verify ridge height,, 23'6" on the front,, about 32' 7" on the rear
BLD-Footing10/18/201810/19/201810/19/2018APASS
DetailsTony Young
Andy Phone #: ###-####
BLD-Footing10/17/201810/18/201810/18/2018APEND
DetailsTony Young
Andy Phone #: ###-####
PubWorks Subgrade Approval10/18/201810/18/201810/18/2018 DONE
DetailsMelissa Jannusch
FOR RESIDENTIAL GARAGE FOOTINGS. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

BLD-Footing10/16/201810/17/201810/17/2018APEND
DetailsTony Young
Andy Phone #: ###-####,, ok pending soils approval,, garage footings
BLD-Foundation9/24/20189/25/20189/25/2018APASS
DetailsBrandon Shaw
Work in progress
BLD-Foundation9/17/20189/18/20189/18/2018APART
DetailsTony Young
Andy Phone #: ###-####,, basement footings ok,, need to verify 10 foot rule at the final for bottom of footing on daylight side
PubWorks Subgrade Approval9/18/20189/18/20189/18/2018 DONE
DetailsJason C. Taylor

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
BLD-Footing9/14/20189/17/20189/17/2018PNR
DetailsTony Young
Andy Phone #: ###-####,, basement footings,, needs soils approval 1st
OVERRIDE  7/25/2018  
Inspection Record Card- Bld  7/25/2018 DONE
Telephone call  7/25/2018 DONE
Left message for Mitch informing this permit is ready and the fee amount due for issuance
Issue PAID IN FULL permit  7/25/2018 DONE
Plan assigned to (M_H)7/9/2018 7/25/2018 DONE
DetailsMichael Hanson
07/26 sfd L2 Paper. 1st review completed - Structural deficiences. MDH
Routing - PLAN CHECK7/25/2018 7/25/2018 PASS
DetailsMichael Hanson
Case Summary (BLD)  7/25/2018 DONE
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  7/25/2018 DONE
DetailsMichael Hanson
Permit Ready to Issue  7/25/2018 DONE
All requirements met
Routing - FIRE7/19/2018 7/23/2018 PASS
DetailsTim Frost
7/26 New SFH paper
Routing - PLAN CHECK  7/23/2018 FAIL
DetailsMichael Hanson
Structural deficiences. MDH
1st review completed  7/23/2018 FAIL
DetailsMichael Hanson
Structural deficiences. MDH
Routing - Erosion and Sediment7/18/2018 7/19/2018 PASS
DetailsAndy J. Long
ESC plan with narrative and BMP site map approved. Certified PD and RP for project. Site preparation inspeciton is required.
Routing - MECHANICAL  7/18/2018 PASS
Routing - PLANNING7/17/2018 7/18/2018 PASS
DetailsNicolette Womack
CFH18-00066 Nicolette
Routing PW Grading-Hillside7/10/2018 7/17/2018 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
Routing - PUBLIC WORKS7/17/2018 7/17/2018 PASS
DetailsMorgan Webb
Route to Impact Fee Review7/10/20187/13/20187/11/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing PW Sewer Rating7/10/2018 7/10/2018 PASS
DetailsMorgan Webb
Routing - Addressing7/10/2018 7/10/2018 PASS
DetailsDoug Chausow
Intake Approval  7/9/2018 PASS
Plans ACCEPTED BY PLAN TECH  7/9/2018 DONE
Recd Pcfee & Taken To Pln CK  7/9/2018 DONE
Application received 7/9/2018