FIRE-Final Inspection | 4/23/2019 | 4/24/2019 | 4/24/2019 | A | CANC |
Troy Cobbley
|
|
|
No life safety sign off required.
|
BLD-Footing | 1/25/2019 | 1/25/2019 | 1/25/2019 | P | CANC |
Jim Sly
|
|
|
Coco Phone #: ###-####
|
BLD-Final | 1/25/2019 | 1/25/2019 | 1/25/2019 | P | PASS |
Jim Sly
|
|
|
Blower Door.........4.07
|
DOC - Permit Finaled | 1/25/2019 | 1/25/2019 | 1/25/2019 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 1/9/2019 | 1/9/2019 | 1/9/2019 | P | NR |
Tony Young
|
|
|
Coco Phone #: ###-####,, needs to resolve egress issues on sill height,, (max 44") also needs guard rail minimum 36",, and blower door test results
|
BLD-Energy code compliance | 10/9/2018 | 10/10/2018 | 10/10/2018 | A | PASS |
Jim Sly
|
|
|
Coco Phone #: ###-####,, verify sill height
|
BLD-Energy code compliance | 10/8/2018 | 10/9/2018 | 10/9/2018 | P | NR |
Tony Young
|
|
|
Coco Phone #: ###-####,, sill height ?s
|
BLD-Conference | 10/8/2018 | 10/8/2018 | 10/8/2018 | P | PART |
Tony Young
|
|
|
Coco Phone #: ###-####,, sill height ?s,, will change out to taller windows
|
BLD-Wall cover | 10/4/2018 | 10/8/2018 | 10/8/2018 | A | FAIL |
Tony Young
|
|
|
Coco Phone #: ###-####,, needs egress in bedrooms up stairs,, max sill 44" (48" now)
|
BLD-Framing/Rough-in | 10/4/2018 | 10/4/2018 | 10/4/2018 | P | PASS |
Jim Sly
|
|
|
Coco Phone #: ###-####
|
Plan Modification Accepted | | | 10/4/2018 | | DONE |
|
|
|
New manual j report
|
Routing - MECHANICAL | 10/4/2018 | | 10/4/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Framing/Rough-in | 10/3/2018 | 10/3/2018 | 10/3/2018 | P | NR |
Jim Sly
|
|
|
Coco Phone #: ###-#### Need Mechanical approval. no inspection performed.
|
BLD-Wall Bracing | 9/12/2018 | 9/13/2018 | 9/13/2018 | P | PASS |
Jim Sly
|
|
|
Coco Phone #: ###-####
|
BLD-Footing | 8/27/2018 | 8/28/2018 | 8/28/2018 | A | PASS |
Jim Sly
|
|
|
Eric Phone #: ###-####
|
Issue PAID IN FULL permit | | | 8/13/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 8/6/2018 | | |
|
|
|
|
Plan assigned to (RDP) | 7/24/2018 | 7/24/2018 | 8/6/2018 | | DONE |
Rob Patrick
|
|
|
08/06 sfd L1 Paper...7/27 Failed: needs updated PFH details and corrected wall bracing
|
Inspection Record Card- Bld | | | 8/6/2018 | | DONE |
|
|
|
|
Telephone call | | | 8/6/2018 | | DONE |
|
|
|
Spoke with CoCo to inform them the permit is ready and what fees are due.
|
Routing - PLAN CHECK | 8/6/2018 | | 8/6/2018 | | PASS |
Rob Patrick
|
|
|
|
Case Summary (BLD) | | | 8/6/2018 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/6/2018 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 8/6/2018 | | DONE |
|
|
|
|
Plan resubmittals received | | | 8/3/2018 | | DONE |
|
|
|
Two copies of sheets 1,4 & 8. taken to Rob
|
1st review completed | | | 7/27/2018 | | FAIL |
Rob Patrick
|
|
|
Needs updated PFH details and wall bracing corrections
|
Routing - PLAN CHECK | 7/26/2018 | | 7/27/2018 | | FAIL |
Rob Patrick
|
|
|
Needs updated PFH details and wall bracing corrections
|
Routing - MECHANICAL | 7/24/2018 | | 7/26/2018 | | PASS |
Chad Schwendiman
|
|
|
|
Route to Impact Fee Review | 7/24/2018 | 7/27/2018 | 7/25/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Plans ACCEPTED BY PLAN TECH | | | 7/24/2018 | | DONE |
|
|
|
|
Intake Approval | | | 7/24/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/24/2018 | | DONE |
|
|
|
|
Routing - PLANNING | 7/24/2018 | | 7/24/2018 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 7/24/2018 | | 7/24/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 7/24/2018 | | 7/24/2018 | | PASS |
Morgan Webb
|
|
|
|
Application received | | | 7/9/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 9 2018 11:20AM
|