BLD-Final | 2/28/2019 | 3/1/2019 | 3/1/2019 | A | PASS |
Tony Young
|
|
|
Matt Phone #: ###-####,, adu is grandfathered
|
DOC - Permit Finaled | 3/1/2019 | 3/1/2019 | 3/1/2019 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 2/27/2019 | 2/28/2019 | 2/28/2019 | P | NR |
Tony Young
|
|
|
Matt Phone #: ###-####,, needs plans on site
|
Zoning Approval | 2/25/2019 | 2/25/2019 | 2/26/2019 | | PASS |
KayCee Babb
|
|
|
Historic inspection complete. Inspection was associated with DRH18-00530 and DRH17-00498 (garage ONLY).
|
BLD-Final | 12/19/2018 | 12/21/2018 | 12/21/2018 | A | NR |
Tony Young
|
|
|
Matt Phone #: ###-####
|
BLD-Energy code compliance | 12/11/2018 | 12/12/2018 | 12/12/2018 | P | PASS |
Dave Hannah
|
|
|
Matt Phone #: ###-####
|
BLD-Framing/Rough-in | 12/6/2018 | 12/7/2018 | 12/7/2018 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by David Webster
|
BLD-Framing/Rough-in | 12/3/2018 | 12/4/2018 | 12/4/2018 | P | NR |
Jim Storey
|
|
|
Matt Phone #: ###-#### 11/29/2018 12/4/2018 12/4/2018 A FAIL
DetailsBen Livingston Phone #: ###-#### Inspection requested via web by Aaron Alandt corrections not made
|
BLD-Framing/Rough-in | 11/27/2018 | 11/28/2018 | 11/29/2018 | P | NR |
Tony Young
|
|
|
Matt Phone #: ###-####
|
BLD-Wall Bracing | 10/31/2018 | 10/31/2018 | 10/31/2018 | P | PASS |
Tony Young
|
|
|
shear // Matt Phone #: ###-####
|
BLD-Footing | 9/25/2018 | 9/26/2018 | 9/26/2018 | A | PASS |
Dave Hannah
|
|
|
Paul Phone #: ###-####
|
OVERRIDE | | | 8/30/2018 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 8/28/2018 | 8/28/2018 | 8/30/2018 | | PASS |
Josh Bogle
|
|
|
modification, ePlan - waiting for applicant to upload new docs
|
Routing - PLAN CHECK | 8/28/2018 | | 8/30/2018 | | PASS |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 8/30/2018 | | DONE |
|
|
|
Plan Mod Approved- fees due, changed back to issued status
|
Issue PAID IN FULL permit | | | 8/30/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/30/2018 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 8/28/2018 | | DONE |
|
|
|
changing the size of the footings for foundation
|
OVERRIDE | | | 7/31/2018 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 7/9/2018 | 7/9/2018 | 7/31/2018 | | PASS |
Josh Bogle
|
|
|
1st done, E-plan - garage
|
Issue PAID IN FULL permit | | | 7/31/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/31/2018 | | 7/31/2018 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/31/2018 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Permit Ready to Issue | | | 7/31/2018 | | DONE |
|
|
|
All requirements met
|
CHANGE ISSUED DATE | | | 7/31/2018 | | DONE |
Rita DeYoung
|
|
|
reset issued date back to 7/31
|
Routing - PLAN CHECK | 7/26/2018 | | 7/26/2018 | | FAIL |
Josh Bogle
|
|
|
need landings, braced walls
|
1st review completed | | | 7/11/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 7/9/2018 | | 7/11/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLANNING | 7/9/2018 | | 7/10/2018 | | PASS |
Ted Vanegas
|
|
|
|
Application received | | | 7/9/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 9 2018 11:55AM
|
Intake Approval | | | 7/9/2018 | | FAIL |
|
|
|
need to upload drawings individually and make sure docs are in docs and drawings are in drawings
|
Plans ACCEPTED BY PLAN TECH | | | 7/9/2018 | | DONE |
|
|
|
|
Intake Approval | | | 7/9/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/9/2018 | | DONE |
|
|
|
|