First Notice | 4/25/2019 | 4/25/2019 | 5/6/2019 | | DONE |
Mike Jordan
|
|
|
mailed 5-10-19
|
BLD-Final | 4/24/2019 | 4/25/2019 | 4/25/2019 | A | PASS |
Mike Jordan
|
|
|
Attila Phone #: ###-####
|
DOC - Permit Finaled | 4/25/2019 | 4/25/2019 | 4/25/2019 | P | PASS |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 4/24/2019 | 4/24/2019 | 4/24/2019 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
Attila Phone #: ###-####
|
Plan Reviewer's activity | | | 4/24/2019 | | DONE |
Javier Guzman
|
|
|
Per Chad Schwendiman no mechanical inspection required.
|
BLD-Conference | 3/13/2019 | 3/13/2019 | 3/13/2019 | P | DONE |
Mike Jordan
|
|
|
Attila Phone #: ###-####
|
Override - Parcel Holds | 3/13/2019 | 1/1/1900 | 3/13/2019 | | |
|
|
|
Let customer know about plan mod, see notes in stop work order
|
Place hold on job | 12/28/2018 | | 1/3/2019 | | DONE |
Tiffany Carson-Herker
|
|
|
waiting for signed permit to be sent back
|
Print Occupancy Form | | | 12/28/2018 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 12/28/2018 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/28/2018 | | DONE |
|
|
|
|
Meeting | | | 12/28/2018 | | DONE |
|
|
|
emailed permit to facilities@envirotechind.com to be signed and emailed back.
|
OVERRIDE | | | 12/27/2018 | | |
|
|
|
|
OVERRIDE | | | 12/27/2018 | | |
|
|
|
|
Plan assigned to (JG) | 12/20/2018 | 12/20/2018 | 12/27/2018 | | PASS |
Javier Guzman
|
|
|
12/24 L1 Enviro-Tech Clean Room ePlan, pend PW envior
|
1st review completed | | | 12/27/2018 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/27/2018 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 12/27/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 12/27/2018 | | DONE |
|
|
|
MET (FACILITES@ENVIROTECHIND.COM attila w/ enviro)
Need
Revised Cert of Value
(per parcel tag, Per Mike J double fee on all permits for enviro-tech clean room. Ref MIS18-00170.)
MET
GC Form
Will need the parcel owner letter (PARCEL OWNER IS ACTING AS GC)
|
Meeting | | | 12/27/2018 | | DONE |
|
|
|
sent email to Joe (joet@brsarchitects.com) informed permit is going to expire in 10 days and is welcome to send in a request for a 180 day extensin. see documents for email
|
Routing PW Environmental | 12/20/2018 | | 12/26/2018 | | PASS |
Rick Christenson
|
|
|
|
Routing - Addressing | 12/20/2018 | | 12/24/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PLAN CHECK | 12/20/2018 | | 12/24/2018 | | PASS |
Javier Guzman
|
|
|
|
Routing - MECHANICAL | 12/20/2018 | | 12/21/2018 | | PASS |
Troy James
|
|
|
Mechanical work is to be field verified for compliance by mechanical inspector.
|
Routing - PUBLIC WORKS | 12/20/2018 | | 12/20/2018 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 12/19/2018 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 7/18/2018 | | FAIL |
Javier Guzman
|
|
|
Please provide and upload the following:
• Provide a filled Form #304 found at our website at https://pds.cityofboise.org/home/documents/apps/300/
• Provide door information on clean room door such as height, width, type, glazing, etc.…
• Provide door hardware type on clean room door
• Provide clean room wall details to include top and bottom bracing method
• Provide manufactures specs for the new clean room.
• Revise floorplan A1.1 to show keynote #2 as all the keynotes shown are only a #1
|
Application received | | | 7/9/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 9 2018 2:21PM
|