First Notice | | 12/17/2018 | 1/7/2019 | | DONE |
|
|
|
mailed 1-11-19
|
BLD-Final | 12/6/2018 | 12/7/2018 | 12/7/2018 | P | PASS |
Jim Sly
|
|
|
as early as you can- Candy Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 12/6/2018 | 12/7/2018 | 12/7/2018 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Candy removed the walls and will resubmit when they are installed again.
Candy Phone #: ###-####
|
Permanent Occupancy | | | 12/7/2018 | | DONE |
|
|
|
|
BLD-Final | 12/4/2018 | 12/5/2018 | 12/5/2018 | A | NR |
Jim Sly
|
|
|
for temp // candy Phone #: ###-#### Need Fire approval.
|
FIRE-Final Inspection | 12/4/2018 | 12/4/2018 | 12/4/2018 | P | FAIL |
Troy Cobbley
|
|
|
No small documents on site, need a fire alarm permit for the interconnection of the hood suppression system and the existing fire alarm system as per the approved plans ( E sheet), need hood suppression system tested and permit finaled, need occupant load sign, need panic hardware as per plans on both of the east side exit doors, need plan modifications showing the accordian walls that are being installed for exiting to be approved including exit signs/emergency lights/hardware/modified occupant loads...ect., need sprinkler modifications now due to the new accordian walls. If there are items on the approval notes that are additional to these comments they will need addressed as well. It looks like the exit signs/emergency ligths and fire extinguishers are ok.
as late as possible // candy Phone #: ###-####
|
BLD-Framing/Rough-in | 10/25/2018 | 10/25/2018 | 10/25/2018 | P | PASS |
Jim Sly
|
|
|
Candy Phone #: ###-####
|
Issue PAID IN FULL permit | | | 9/26/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/26/2018 | | DONE |
|
|
|
|
Plan assigned to (JAR) | 8/9/2018 | 8/9/2018 | 9/24/2018 | | DONE |
Julie Romig
|
|
|
09/27 - 2nd Rev - 1st Rev Comp - L3 Idaho Pizza
|
Routing - MECHANICAL | 8/9/2018 | | 9/24/2018 | | PASS |
Troy James
|
|
|
type 1 hood over oven and type 2 over dishwasher
|
Routing Off Site - C.D.H | 9/21/2018 | | 9/24/2018 | | PASS |
Julie Romig
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/24/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/24/2018 | | DONE |
|
|
|
NEED
GC FORM
REVISED VALUE
MET
ACHD
|
Route to Impact Fee Review | 9/20/2018 | 9/23/2018 | 9/21/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 9/21/2018 | | 9/21/2018 | | PASS |
Julie Romig
|
|
|
|
Routing - PLAN CHECK | 8/9/2018 | | 9/20/2018 | | PASS |
Julie Romig
|
|
|
|
1st review completed | | | 9/20/2018 | | FAIL |
Julie Romig
|
|
|
|
Routing - FIRE | 8/9/2018 | 8/9/2018 | 9/6/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing Off Site - C.D.H | 8/9/2018 | | 8/27/2018 | | FAIL |
Julie Romig
|
|
|
Corrections required per ePlanReview
|
Routing PW Environmental | 8/9/2018 | | 8/14/2018 | | PASS |
Rick Christenson
|
|
|
|
Routing - PLANNING | 8/9/2018 | | 8/13/2018 | | PASS |
David Moser
|
|
|
|
Routing - PLUMBING | 8/9/2018 | | 8/10/2018 | | PASS |
Bill VanDegrift
|
|
|
Per plan and ISPC.
|
Routing - Design Review | 8/9/2018 | | 8/9/2018 | | PASS |
KayCee Babb
|
|
|
Per CZC18-00181
|
Routing - PUBLIC WORKS | 8/9/2018 | | 8/9/2018 | | PASS |
Morgan Webb
|
|
|
WEST BOISE SEWER DISTRICT
|
Intake Approval | | | 8/6/2018 | | PASS |
|
|
|
|
Application received | | | 7/10/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 10 2018 4:09PM
|
Routing - Addressing | 8/9/2018 | | | | PASS |
Doug Chausow
|
|
|
Suite 102
|