Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD18-02500
StatusIssued
Name Kailey Locksmith
Site Address 3729 W ST ANDREWS DR
Project NameKailey Locksmith Addition
Customer Number 
ePlanReviewYes
Description
Permit for a main level remodel and addition of a 928sq' 2nd level that includes a Master Suite and Bonus Room. An 80sq' 2nd level deck is part of this project. All work per plans, notations, engineering, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  2/12/2019 DONE
Telephone call  2/12/2019 DONE
as of 2-12-19-permit is now in parcel owners name-see letter from GC
BLD-Energy code compliance2/7/20192/8/20192/8/2019APASS
DetailsJim Storey
Call if you need access key Phone #: ###-#### Inspection requested via web by Andrew Clark
BLD-Framing/Rough-in2/6/20192/6/20192/6/2019PPASS
DetailsJim Storey
All trades have inspections signed off. need okay to insulate. Phone #: ###-#### Inspection requested via web by Andrew Clark
BLD-Framing/Rough-in1/29/20191/30/20191/30/2019PNR
DetailsJim Storey
Please use rear door for access if you have issues getting in please call sometimes subs lock up the doors. Phone #: ###-#### Inspection requested via web by Andrew Clark mech insp.failled
BLD-Framing/Rough-in1/28/20191/29/20191/29/2019PNR
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Andrew Clark no access and no sign off for mech
BLD-Framing/Rough-in1/21/20191/22/20191/22/2019APART
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Andrew Clark pending trade instaltion.
BLD-Footing1/9/20191/10/20191/10/2019APASS
DetailsJim Storey
Andrew Phone #: ###-####
Issue PAID IN FULL permit  12/27/2018 DONE
Expiration Notice12/11/20181/3/201912/11/2018 DONE
DetailsBrittany Hill
Plan assigned to (JAB) Josh7/19/20187/19/20189/28/2018 PASS
DetailsJosh Bogle
07/25 addition ePlan - 1st done
Routing - PLAN CHECK9/28/2018 9/28/2018 PASS
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  9/28/2018 DONE
DetailsJosh Bogle
Additional Review fees (see agency comments folder in ePlan) - ESC no - Energy yes
Permit Ready to Issue  9/28/2018 DONE
Routing - PLAN CHECK9/25/2018 9/25/2018 FAIL
DetailsJosh Bogle
inadequate headers, footings not matching engineering
Routing - PLAN CHECK9/19/2018 9/19/2018 FAIL
DetailsJosh Bogle
point load, header, footing, & head height issues
Telephone call  8/27/2018 DONE
Spoke with Andrew, deleted duplicate files
Routing - PLAN CHECK8/27/2018 8/27/2018 FAIL
DetailsJosh Bogle
Routing - MECHANICAL8/15/2018 8/17/2018 PASS
DetailsTroy James
Bonus room heating design is with existing equipment, new ductwork only.
Routing - PLAN CHECK8/15/2018 8/17/2018 FAIL
DetailsJosh Bogle
Plan Reviewer's activity  8/15/2018 DONE
DetailsJosh Bogle
resubmit received task - cycle two
1st review completed  7/26/2018 FAIL
DetailsJosh Bogle
Routing - PLAN CHECK7/19/2018 7/26/2018 FAIL
DetailsJosh Bogle
Routing - MECHANICAL7/19/2018 7/24/2018 FAIL
DetailsTroy James
Talked to applicant about heating design. He was going to find out and get back to me.
Routing - PLANNING7/19/2018 7/19/2018 PASS
DetailsSue Cummings
Intake Approval  7/19/2018 PASS
Plans taken in for review, missing few details still.
Plans ACCEPTED BY PLAN TECH  7/19/2018 DONE
Recd Pcfee & Taken To Pln CK  7/19/2018 DONE
no fee taken at intake, 406
Intake Approval  7/17/2018 FAIL
DetailsCandy A. Nichols
still have not uploaded the correct info-told them to check the list and uplaod the required items
Intake Approval  7/16/2018 FAIL
NEED
All measurements to property lines
File names label correctly
Footing for deck
Manual J due to "Design build new HVAC for additional upper level space" marked on plans
Application received  7/13/2018 DONE
Application submitted via PDS Online on Jul 13 2018 9:52AM
Intake Approval  7/13/2018 FAIL
need to update to 2015 IRC.
need correct file names.
footings for deck.
floor framing.
treads and risers on the stairs.
Manual J
site plan


Intake Approval  7/13/2018 FAIL
7-13-18 Please see pervious prescreen checklist items listed above (6)
(The plans in the drawing folder have been deleted, to make it easier for uploading with correct drawing file names.)

For questions on the New HVAC report (manual J,D or S) please call Troy James at 208-###-####