BLD-Final | 1/3/2019 | 1/4/2019 | 1/4/2019 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Gus Brandon
|
DOC - Permit Finaled | 1/4/2019 | 1/4/2019 | 1/4/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 1/3/2019 | 1/4/2019 | 1/4/2019 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 3.1
|
BLD-Other | 11/1/2018 | 11/1/2018 | 11/1/2018 | P | PASS |
Brandon Shaw
|
|
|
Soffit Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Energy code compliance | 10/31/2018 | 10/31/2018 | 10/31/2018 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Framing/Rough-in | 10/31/2018 | 10/31/2018 | 10/31/2018 | A | PASS |
Brandon Shaw
|
|
|
Correction SAT...
|
BLD-Framing/Rough-in | 10/29/2018 | 10/30/2018 | 10/30/2018 | A | PEND |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Framing/Rough-in | 10/26/2018 | 10/29/2018 | 10/29/2018 | A | NR |
Brandon Shaw
|
|
|
Need ELE rough-in to pass... Plan notes # 8 & 9 to be as noted... BG3 box truss to bear down to foundation...
|
BLD-Framing/Rough-in | 10/24/2018 | 10/25/2018 | 10/25/2018 | A | PASS |
Brandon Shaw
|
|
|
Shear corrections SAT...
No framing inspection, wall bracing only...
|
BLD-Wall Bracing | 10/23/2018 | 10/23/2018 | 10/23/2018 | P | FAIL |
Brandon Shaw
|
|
|
Corrections not done... Hold downs are to be as per plans and installed per Man. Rec... Anchor bolts to be no more than 12" from ends of sill plates
|
BLD-Wall Bracing | 10/18/2018 | 10/18/2018 | 10/18/2018 | P | FAIL |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick,, no plans,, remove house wrap as needed to verify nailing
|
BLD-Foundation | 8/31/2018 | 8/31/2018 | 8/31/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 8/30/2018 | 8/30/2018 | 8/30/2018 | A | PASS |
Brandon Shaw
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
BLD-Footing | 8/28/2018 | 8/28/2018 | 8/28/2018 | P | NR |
Brandon Shaw
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
Issue PAID IN FULL permit | | | 8/23/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/23/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 8/14/2018 | | |
|
|
|
|
Routing - PLAN CHECK | 8/14/2018 | | 8/14/2018 | | PASS |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/14/2018 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 8/14/2018 | | DONE |
|
|
|
all requirements met
|
Plan assigned to (M_H) | 7/13/2018 | | 8/14/2018 | | DONE |
Michael Hanson
|
|
|
07/26 sfd L1 ePlan. 1st review completed. Structural calculations do not match plans. MDH
|
Routing - PLAN CHECK | | | 7/26/2018 | | FAIL |
Michael Hanson
|
|
|
Structural calculations do not match plans. MDH
|
1st review completed | | | 7/26/2018 | | FAIL |
Michael Hanson
|
|
|
Structural calculations do not match plans. MDH
|
Route to Impact Fee Review | 7/13/2018 | 7/16/2018 | 7/16/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 7/13/2018 | | 7/16/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 7/13/2018 | | 7/16/2018 | | PASS |
Beverly Mountain
|
|
|
|
Routing - MECHANICAL | | | 7/16/2018 | | PASS |
Troy James
|
|
|
|
Application received | | | 7/13/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 13 2018 11:03AM
|
Plans ACCEPTED BY PLAN TECH | | | 7/13/2018 | | DONE |
|
|
|
|
Intake Approval | | | 7/13/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/13/2018 | | DONE |
|
|
|
|
Routing - PLANNING | | | 7/13/2018 | | PASS |
|
|
|
|