BLD-Final | 2/20/2019 | 2/22/2019 | 2/22/2019 | A | PASS |
Tony Young
|
|
|
josiah Phone #: ###-#### please call when on way,, exterior deck is not in so doors are blocked off on lower 4',, egress is still functional
|
DOC - Permit Finaled | 2/22/2019 | 2/22/2019 | 2/22/2019 | P | PASS |
Tony Young
|
|
|
|
Zoning Approval | 2/21/2019 | 2/21/2019 | 2/21/2019 | | DONE |
Ted Vanegas
|
|
|
|
BLD-Energy code compliance | 11/29/2018 | 11/30/2018 | 11/30/2018 | P | PASS |
Tony Young
|
|
|
Jesiah-would like after 3 PM if possible Phone #: ###-####
|
BLD-Framing/Rough-in | 11/27/2018 | 11/30/2018 | 11/30/2018 | P | PASS |
Tony Young
|
|
|
Josiah Phone #: ###-####-would like after 3 pm
|
BLD-Framing/Rough-in | 11/26/2018 | 11/29/2018 | 11/29/2018 | A | PART |
Dave Hannah
|
|
|
Jesiah Phone #: ###-#### ok to insulate check fire blockingin basement at energy inspection
|
BLD-Energy code compliance | 11/26/2018 | 11/29/2018 | 11/29/2018 | A | PART |
Dave Hannah
|
|
|
Jesiah Phone #: ###-#### air seal ok
|
Routing - MECHANICAL | 11/20/2018 | | 11/20/2018 | | PASS |
Troy James
|
|
|
Manual j report
|
BLD-Wall Bracing | 10/18/2018 | 10/19/2018 | 10/19/2018 | A | PASS |
Tony Young
|
|
|
shear // Jeff Phone #: ###-####
|
BLD-Foundation | 9/10/2018 | 9/10/2018 | 9/10/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Wall cover | 9/7/2018 | 9/10/2018 | 9/10/2018 | A | CANC |
Brandon Shaw
|
|
|
edgar Phone #: ###-####
|
BLD-Footing | 8/30/2018 | 8/31/2018 | 8/31/2018 | A | PASS |
Tony Young
|
|
|
Edgar Phone #: ###-####,, basement footing ok
|
BLD-Footing | 8/30/2018 | 8/30/2018 | 8/30/2018 | P | PART |
Tony Young
|
|
|
Edgar ###-####,, work in progress,, ok
|
OVERRIDE | | | 8/8/2018 | | |
|
|
|
|
Routing Walk-In (Zoning) | 8/8/2018 | 8/8/2018 | 8/8/2018 | A | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 8/8/2018 | 8/8/2018 | 8/8/2018 | A | DONE |
Brian McGowan
|
|
|
|
Plan assigned to (JAB) Josh | 8/2/2018 | 8/2/2018 | 8/8/2018 | | PASS |
Josh Bogle
|
|
|
08/10 addition, paper - Historic 10 day waiting period done 08/06 - needs ACCA report
|
Routing - PLANNING | 8/2/2018 | | 8/8/2018 | | PASS |
Ted Vanegas
|
|
|
|
Issue PAID IN FULL permit | | | 8/8/2018 | | DONE |
|
|
|
|
1st review completed | | | 8/8/2018 | | DONE |
Brian McGowan
|
|
|
Finished processing the permit for Josh.
|
Case Summary (BLD) | | | 8/8/2018 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 8/8/2018 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 8/8/2018 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/8/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 8/8/2018 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 8/2/2018 | 8/2/2018 | 8/2/2018 | P | FAIL |
Josh Bogle
|
|
|
applicant asking for Plan Review before 10 day waiting period - took in as a level 2
|
Routing - PLAN CHECK | 8/2/2018 | | 8/2/2018 | | PASS |
Josh Bogle
|
|
|
Plan Reviewed as a walk-in
|
Routing Walk-In (Zoning) | 8/1/2018 | 8/1/2018 | 8/1/2018 | P | FAIL |
Josh Bogle
|
|
|
no contact with applicant on this
|
Routing Walk-In (Zoning) | 7/16/2018 | 7/16/2018 | 7/16/2018 | P | FAIL |
Katelyn Menuge
|
|
|
Need C of A
|
Application received | | 7/16/2018 | | | |
|
|
|
|