Permit Information
Permit NumberBLD18-02524
StatusFinaled
Name LEVCO BUILDERS LLC
Site Address 1906 N 10TH ST
Project NameAranjo addition
Customer Number 
ePlanReviewNo
Description
Permit for a 1,575sq' addition. The 784sq' of new downstairs will be a Family Room. The 791sq' of main level addition will include a Master Suite and additional Full Bath. Adding space to the existing main level bedrooms by removing a Full Bath is part of this project. All work per plans, notes, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/20/20192/22/20192/22/2019APASS
DetailsTony Young
josiah Phone #: ###-#### please call when on way,, exterior deck is not in so doors are blocked off on lower 4',, egress is still functional
DOC - Permit Finaled2/22/20192/22/20192/22/2019PPASS
DetailsTony Young
Zoning Approval2/21/20192/21/20192/21/2019 DONE
DetailsTed Vanegas
BLD-Energy code compliance11/29/201811/30/201811/30/2018PPASS
DetailsTony Young
Jesiah-would like after 3 PM if possible Phone #: ###-####
BLD-Framing/Rough-in11/27/201811/30/201811/30/2018PPASS
DetailsTony Young
Josiah Phone #: ###-####-would like after 3 pm
BLD-Framing/Rough-in11/26/201811/29/201811/29/2018APART
DetailsDave Hannah
Jesiah Phone #: ###-#### ok to insulate check fire blockingin basement at energy inspection
BLD-Energy code compliance11/26/201811/29/201811/29/2018APART
DetailsDave Hannah
Jesiah Phone #: ###-#### air seal ok
Routing - MECHANICAL11/20/2018 11/20/2018 PASS
DetailsTroy James
Manual j report
BLD-Wall Bracing10/18/201810/19/201810/19/2018APASS
DetailsTony Young
shear // Jeff Phone #: ###-####
BLD-Foundation9/10/20189/10/20189/10/2018APASS
DetailsBrandon Shaw
Work in progress
BLD-Wall cover9/7/20189/10/20189/10/2018ACANC
DetailsBrandon Shaw
edgar Phone #: ###-####
BLD-Footing8/30/20188/31/20188/31/2018APASS
DetailsTony Young
Edgar Phone #: ###-####,, basement footing ok
BLD-Footing8/30/20188/30/20188/30/2018PPART
DetailsTony Young
Edgar ###-####,, work in progress,, ok
OVERRIDE  8/8/2018  
Routing Walk-In (Zoning)8/8/20188/8/20188/8/2018APASS
DetailsJeff Lowe
Routing Walk-In (BLD)8/8/20188/8/20188/8/2018ADONE
DetailsBrian McGowan
Plan assigned to (JAB) Josh8/2/20188/2/20188/8/2018 PASS
DetailsJosh Bogle
08/10 addition, paper - Historic 10 day waiting period done 08/06 - needs ACCA report
Routing - PLANNING8/2/2018 8/8/2018 PASS
DetailsTed Vanegas
Issue PAID IN FULL permit  8/8/2018 DONE
1st review completed  8/8/2018 DONE
DetailsBrian McGowan
Finished processing the permit for Josh.
Case Summary (BLD)  8/8/2018 DONE
DetailsBrian McGowan
Inspection Record Card- Bld  8/8/2018 DONE
DetailsBrian McGowan
Case Summary (BLD)  8/8/2018 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  8/8/2018 DONE
DetailsBrian McGowan
Permit Ready to Issue  8/8/2018 DONE
Routing Walk-In (BLD)8/2/20188/2/20188/2/2018PFAIL
DetailsJosh Bogle
applicant asking for Plan Review before 10 day waiting period - took in as a level 2
Routing - PLAN CHECK8/2/2018 8/2/2018 PASS
DetailsJosh Bogle
Plan Reviewed as a walk-in
Routing Walk-In (Zoning)8/1/20188/1/20188/1/2018PFAIL
DetailsJosh Bogle
no contact with applicant on this
Routing Walk-In (Zoning)7/16/20187/16/20187/16/2018PFAIL
DetailsKatelyn Menuge
Need C of A
Application received 7/16/2018