PubWorks Occupancy Approval | 9/12/2019 | 9/12/2019 | 9/12/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s design professional indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Energy code compliance | 11/13/2018 | 11/14/2018 | 11/14/2018 | A | PASS |
Dave Hannah
|
|
|
Lynn Phone #: ###-####
|
BLD-Framing/Rough-in | 11/5/2018 | 11/6/2018 | 11/6/2018 | A | PASS |
Tony Young
|
|
|
John Phone #: ###-####
|
BLD-Framing/Rough-in | 10/31/2018 | 11/1/2018 | 11/1/2018 | A | PEND |
Brandon Shaw
|
|
|
Framing good to go... Foam/air seal to be done before spray foam installation, call air seal...
|
Plan Modification Accepted | | | 10/31/2018 | | DONE |
|
|
|
New manual j report
|
Routing - MECHANICAL | 10/31/2018 | | 10/31/2018 | | PASS |
Troy James
|
|
|
Resubmitted manual j report. Owner decided to use the existing equipment.
|
BLD-Wall Bracing | 10/16/2018 | 10/17/2018 | 10/17/2018 | A | PASS |
Tony Young
|
|
|
Ren Phone #: ###-####
|
BLD-Foundation | 8/27/2018 | 8/27/2018 | 8/27/2018 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Jon King,, work in progress
|
BLD-Footing | 8/20/2018 | 8/20/2018 | 8/20/2018 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Jon King,, work in progress,, ok
|
PubWorks Subgrade Approval | 8/20/2018 | 8/20/2018 | 8/20/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
OVERRIDE | | | 8/7/2018 | | |
|
|
|
|
Routing Walk-In (BLD) | 8/7/2018 | 8/7/2018 | 8/7/2018 | P | DONE |
Josh Bogle
|
|
|
|
Routing - FIRE | 7/31/2018 | 7/31/2018 | 8/7/2018 | | PASS |
Tim Frost
|
|
|
Resubmittal SFH ePlan
|
Plan assigned to (JAB) Josh | 7/18/2018 | 7/18/2018 | 8/7/2018 | | PASS |
Josh Bogle
|
|
|
07/24 remodel ePlan - 2nd review, sent to Hillside & Fire
|
Routing - PLAN CHECK | 7/31/2018 | | 8/7/2018 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/7/2018 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Permit Ready to Issue | | | 8/7/2018 | | DONE |
|
|
|
NEED
RP
|
Issue PAID IN FULL permit | | | 8/7/2018 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 7/31/2018 | | 8/3/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing - PLANNING | 7/18/2018 | | 7/30/2018 | | PASS |
Susan Riggs
|
|
|
CFH18-00062 Susan Riggs
|
Routing - PLAN CHECK | 7/18/2018 | | 7/25/2018 | | FAIL |
Josh Bogle
|
|
|
|
Plan Reviewer's activity | | | 7/25/2018 | | DONE |
|
|
|
Received fire flow information of 1500 Gpm. A fire flow of 1750 Gpm is required.
Told the builder via email fire sprinklers will be required in order to reduce the amount of fire flow required.
|
1st review completed | | | 7/25/2018 | | FAIL |
Josh Bogle
|
|
|
|
Plan Reviewer's activity | | | 7/24/2018 | | DONE |
|
|
|
Jon King, sent an updated drawing which I uploaded for him into projectdox. I still cannot approve the project due to missing fire flow information. The rest of the review items have been satisfied.
|
Routing PW Grading-Hillside | 7/18/2018 | | 7/23/2018 | | FAIL |
Melissa Jannusch
|
|
|
Hi Jon,
Listed below are the revisions I am requesting prior to approval for hillside grading of your project on 123 W Crestline drive. Please coordinate with your designer to complete the revisions and give me a call if you have any questions about them.
1. Label and show the foundation drains and where the foundation drains will daylight.
2. Please add the following notes or similar to the grading and drainage plan
The grading plan shall include the following notes:
1. Subgrade shall be inspected by the project engineer responsible for the
geotechnical aspects of the project prior to installation of footings or
slabs.
2. Final grading shall be inspected by the site design engineer. Prior to
occupancy, the site design engineer shall evaluate all grading activities
for compliance with approved plans. A summary of this grading
evaluation and compliance determination shall be sent to the PDSD.
Any revisions to the approved grading plan must be approved by both
the site design engineer and the PDSD. If the grading differs from what
was originally approved, a revised grading plan shall be submitted and
approved before any modified grading is undertaken.
Best,
Melissa
|
Routing - FIRE | 7/18/2018 | 7/18/2018 | 7/19/2018 | | FAIL |
Tim Frost
|
|
|
|
Routing - PUBLIC WORKS | 7/18/2018 | | 7/18/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 7/18/2018 | | 7/18/2018 | | PASS |
Michael Zawacki
|
|
|
Foothills home. RP needed. Site prep inspection required before any ground disturbing activity. OK to begin work inside home without site prep inspection.
|
Routing - MECHANICAL | 7/18/2018 | | 7/18/2018 | | PASS |
Troy James
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/18/2018 | | DONE |
|
|
|
|
Intake Approval | | | 7/18/2018 | | PASS |
|
|
|
|
Application received | | | 7/16/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 16 2018 6:30PM
|