BLD-Conference | 9/28/2018 | 10/1/2018 | 10/1/2018 | A | PASS |
Dave Hannah
|
|
|
Mike Phone #: ###-####
|
DOC - Permit Finaled | 10/1/2018 | 10/1/2018 | 10/1/2018 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 8/22/2018 | 8/22/2018 | 8/22/2018 | P | PASS |
Jim Sly
|
|
|
Mike-wants ok to cover the roof Phone #: ###-#### OK to cover all.....including deck.
|
BLD-Foundation | 8/9/2018 | 8/9/2018 | 8/9/2018 | P | PASS |
Jim Storey
|
|
|
Michael Phone #: ###-####
|
OVERRIDE | | | 8/8/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 7/30/2018 | 7/30/2018 | 8/8/2018 | | DONE |
Brian McGowan
|
|
|
07/31 - Corrections required
|
CHANGE STATUS TO (ISS) | | | 8/8/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/8/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/7/2018 | | 8/8/2018 | | PASS |
Brian McGowan
|
|
|
Please add (1) hour of plan review for the Plan Modification.
|
Permit Ready to Issue | | | 8/8/2018 | | DONE |
|
|
|
Plan Mod Approved
DO NOT REISSUE
(change back to issue status after plan mod fees are paid)
|
Routing - PLAN CHECK | | | 7/31/2018 | | FAIL |
Brian McGowan
|
|
|
|
Routing - PLANNING | 7/30/2018 | | 7/30/2018 | | PASS |
Sue Cummings
|
|
|
|
Plan resubmittals received | | | 7/30/2018 | | DONE |
|
|
|
changing patio from concrete to peirs
|
OVERRIDE | | | 7/25/2018 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 7/25/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/25/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/25/2018 | | DONE |
|
|
|
Need
RP
|
Plan assigned to (BJM) | 7/23/2018 | 7/23/2018 | 7/23/2018 | | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 7/23/2018 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/23/2018 | | |
Brian McGowan
|
|
|
ESC - YES ENERGY - NO
|
Routing - PLAN CHECK | 7/18/2018 | | 7/23/2018 | | PASS |
Brian McGowan
|
|
|
|
Plan assigned to (JAB) Josh | 7/18/2018 | 7/18/2018 | 7/18/2018 | | DEFR |
Josh Bogle
|
|
|
|
Routing - PLANNING | 7/18/2018 | | 7/18/2018 | | PASS |
Sue Cummings
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/18/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/18/2018 | | DONE |
|
|
|
no fee taken at intake, 406
|
Intake Approval | | | 7/18/2018 | | PASS |
|
|
|
|
Application received | | | 7/17/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 17 2018 12:00PM
|
Intake Approval | | | 7/17/2018 | | FAIL |
|
|
|
need to upload drawings into the drawings folder and they must face correctly (landscape)
|
Intake Approval | | | 7/17/2018 | | FAIL |
|
|
|
plans still facing wrong way
|