First Notice | 9/5/2018 | 9/5/2018 | 9/10/2018 | | DONE |
Jim Storey
|
|
|
mailed 9-11-18
|
BLD-Final | 9/4/2018 | 9/5/2018 | 9/5/2018 | P | PASS |
Jim Storey
|
|
|
call before // Jeff Higgins Phone #: ###-####
|
DOC - Permit Finaled | 9/5/2018 | 9/5/2018 | 9/5/2018 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 9/4/2018 | 9/5/2018 | 9/5/2018 | P | PASS |
Jim Page
|
|
|
Plans have been corrected to show 17 foot racking height, final life fire safety inspection for racking permit complete.
call before // Jeff Higgins Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 9/4/2018 | | |
|
|
|
|
Plan Modification Accepted | | | 8/29/2018 | | DONE |
|
|
|
Plan mod accepted-received 2 sets of permit apps, engineering, sheets 18-1555-A, 18-1555-B, 18-1555C & A-3-changing reack heights-took to M_H
|
Plan assigned to (M_H) | 8/29/2018 | | 8/29/2018 | | DONE |
|
|
|
08/30 plan mod
|
Routing - PLAN CHECK | 8/29/2018 | | 8/29/2018 | | PASS |
Michael Hanson
|
|
|
|
Case Summary (BLD) | | | 8/29/2018 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/29/2018 | | DONE |
Michael Hanson
|
|
|
1 hour plan review fee
|
Permit Ready to Issue | | | 8/29/2018 | | DONE |
|
|
|
Plan Mod Approved- fees due, change back to issued status
|
Inspection Record Card- Bld | | | 8/29/2018 | | DONE |
|
|
|
|
Telephone call | | | 8/29/2018 | | DONE |
|
|
|
Called the office to inform them the plan mod is approved and ready and what fees are due.
|
FIRE-Final Inspection | 8/16/2018 | 8/16/2018 | 8/16/2018 | P | PART |
Jim Page
|
|
|
Racking that is 17 foot tall will require a resubmittal, racks can be used up to the 12 foot mark per city approved drawings. After plan modification is made a re-inspection will be required to verify installation matches city approved drawings.
pallet racking Phone #: ###-#### Inspection requested via web by Jeff Higgins
|
BLD-Other | 8/16/2018 | 8/16/2018 | 8/16/2018 | P | CANC |
Jim Storey
|
|
|
pallet racking Phone #: ###-#### Inspection requested via web by Jeff Higgins
|
FIRE-Final Inspection | 8/13/2018 | 8/14/2018 | 8/14/2018 | A | FAIL |
Troy Cobbley
|
|
|
The scope of work and the plans indicate max storage height of 12'.The racks on the south side of the warehouse have a top shelf installed at 12' so the potential for storage exceeding 12' is provided. The racks on the north side of the warehouse are closer to 20' in height. Plans need to be resubmitted for high piled storage. Also the racks at the south wall have been reduced in lenght.
Jeff Phone #: ###-####
|
BLD-Final | 8/13/2018 | 8/14/2018 | 8/14/2018 | A | FAIL |
Jim Storey
|
|
|
Pallet racking anchors Phone #: ###-#### Inspection requested via web by Jeff Higgins resubmit per fire
|
BLD-Other | 8/10/2018 | 8/13/2018 | 8/13/2018 | A | PART |
Jim Storey
|
|
|
Pallet racking anchors Phone #: ###-#### Inspection requested via web by Jeff Higgins pending fire insp. and documation
|
BLD-Other | 8/9/2018 | 8/10/2018 | 8/10/2018 | P | CANC |
Jim Storey
|
|
|
Would like to have it around 1:00 to 1:30 Pallet racking Phone #: ###-#### >> Inspection requested via web by Jeff Higgins Inspection cancelled from web by: Jeff Higgins
|
Plan assigned to (JG) | 7/17/2018 | 7/17/2018 | 7/30/2018 | | DEFR |
Javier Guzman
|
|
|
7/30 L2 Waxie Racking paper plans
|
Routing - PLAN CHECK | | | 7/30/2018 | | PASS |
Michael Hanson
|
|
|
|
Plan assigned to (M_H) | 7/30/2018 | | 7/30/2018 | | DONE |
Michael Hanson
|
|
|
07/30 Racking L2 Paper
|
1st review completed | | | 7/30/2018 | | DONE |
Michael Hanson
|
|
|
|
Case Summary (BLD) | | | 7/30/2018 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/30/2018 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 7/30/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/30/2018 | | DONE |
|
|
|
|
Telephone call | | | 7/30/2018 | | DONE |
|
|
|
Left voicemail for Jeff to inform him the permit is ready and what fees are due.
|
Issue PAID IN FULL permit | | | 7/30/2018 | | DONE |
|
|
|
|
Routing - FIRE | 7/17/2018 | 7/17/2018 | 7/24/2018 | | PASS |
Tim Frost
|
|
|
Racking paper plans
|
Plans ACCEPTED BY PLAN TECH | | | 7/17/2018 | | DONE |
|
|
|
|
Intake Approval | | | 7/17/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/17/2018 | | DONE |
|
|
|
|
Application received | | 7/17/2018 | | | |
|
|
|
|