Third Notice | | 4/13/2019 | 5/6/2019 | | DONE |
|
|
|
mailed 5-10-19
|
Second Notice | | 3/21/2019 | 4/8/2019 | | DONE |
|
|
|
mailed 4-11-19
|
First Notice | | 2/21/2019 | 3/11/2019 | | DONE |
|
|
|
mailed 3-12
|
Permanent Occupancy | | | 2/11/2019 | | DONE |
|
|
|
|
BLD-Final | 1/28/2019 | 1/29/2019 | 1/29/2019 | A | PASS |
Dave Hannah
|
|
|
Call half hour before // Joe Phone #: ###-####
|
BLD-Final | 1/2/2019 | 1/2/2019 | 1/2/2019 | P | PART |
Dave Hannah
|
|
|
Joe Phone #: ###-#### ok for temp occ need to change door hardwear on three doors and ada shower room
|
FIRE-Final Inspection | 1/2/2019 | 1/2/2019 | 1/2/2019 | P | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.
Joe Phone #: ###-####
|
BLD-Grading Inspection | 12/10/2018 | 12/10/2018 | 12/10/2018 | P | PART |
Brandon Shaw
|
|
|
Ceiling grid, south end of office... OK to cover...
|
BLD-Ceiling Grid Inspection | 11/29/2018 | 11/30/2018 | 11/30/2018 | A | PASS |
Dave Hannah
|
|
|
Chris Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 11/29/2018 | 11/29/2018 | 11/29/2018 | P | PART |
Dave Hannah
|
|
|
Chris Phone #: ###-#### north side ok to flood after elec passes
|
CHANGE STATUS TO (ISS) | | | 10/24/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/24/2018 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 10/22/2018 | 10/23/2018 | 10/23/2018 | P | PASS |
Mike Jordan
|
|
|
Chris Phone #: ###-####. Interior steel stud framed walls only ok.
|
Plan assigned to (JG) | 10/16/2018 | 10/16/2018 | 10/23/2018 | | PASS |
Javier Guzman
|
|
|
Plan Mod - Angstman Johnson - ste #200 ePlan
|
Routing - PLAN CHECK | 10/18/2018 | | 10/23/2018 | | PASS |
Javier Guzman
|
|
|
|
Permit Ready to Issue | | | 10/23/2018 | | DONE |
|
|
|
plan mod so please do not re issue
|
Plan Modification Accepted | | | 10/16/2018 | | DONE |
|
|
|
Plan Mod - Revise doors and hardware at doors 201 (Entry to suite) off of elevator lobby. Doors and hardware to have smoke & draft control 'S' label, no longer fire rated at 1 hour. Hardware to meet IBC 710.5.2.2, 710.5.2.3 and 716.5.9. All sprinkler heads on floor verified to be or changed to be quick response heads.
|
Issue PAID IN FULL permit | | | 10/3/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/3/2018 | | DONE |
|
|
|
|
Plan assigned to (JG) | 8/8/2018 | 8/8/2018 | 9/7/2018 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 8/09 L2 Angstman Johnson Office T.I. ePlan
|
Routing - MECHANICAL | 9/4/2018 | | 9/7/2018 | | PASS |
Troy James
|
|
|
Air balance contractor to provide outside air to space per the 2012 IMC chapter 4.
|
Routing - PLAN CHECK | 9/7/2018 | | 9/7/2018 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 9/7/2018 | | 9/7/2018 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/7/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/7/2018 | | DONE |
|
|
|
all met-NEED
GC FORM-met
REVISED VALUE0met
(close out int demo permit BLD18-02837 when issued) 10-2-18 not ready to final out early start/demo permit
|
Routing - PLAN CHECK | 9/4/2018 | | 9/6/2018 | | FAIL |
Javier Guzman
|
|
|
|
Route to Impact Fee Review | 8/15/2018 | 8/18/2018 | 8/16/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 8/15/2018 | | DONE |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 8/3/2018 | | 8/15/2018 | | FAIL |
Javier Guzman
|
|
|
|
Routing - MECHANICAL | 8/8/2018 | | 8/9/2018 | | FAIL |
Troy James
|
|
|
Left message to applicant.
|
Plan assigned to (JG) | 8/3/2018 | 8/3/2018 | 8/7/2018 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 8/09 L2 Angstman Johnson ePlan, pend mech
|
Routing - PUBLIC WORKS | 8/3/2018 | | 8/6/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Addressing | 8/3/2018 | | 8/3/2018 | | PASS |
Doug Chausow
|
|
|
|
Intake Approval | | | 8/3/2018 | | PASS |
Javier Guzman
|
|
|
|
Application received | | | 7/17/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 17 2018 4:25PM
|