Permit Information
Permit NumberBLD18-02557
StatusFinaled
Name PEAK CONSTRUCTION SERVICES LLC
Site Address 199 N CAPITOL BLVD Unit: STE 200
Project NameAngstman Johnson - ste #200
Customer NumberBLD18-02837-INTERIOR DEMO
ePlanReviewYes
Description
(ANGSTMAN JOHNSON – SUITE 200) //Plan modification to revise door and door hardware at door 201 entry to suite off of elevator lobby. doors and hardware to have smoke & draft control 'S' label, no longer fire rated at 1 hour, self-closing and latching. Door to meet IBC 710.5.2.2, 710.5.2.3 and 716.5.9. All sprinkler heads on floor verified to be or changed to be quick response head. 10-17-2018 JG// The fire sprinkler system is used for high-rise. Permit is to remodel an existing 10,807 sq. ft. tenant space within the 2nd floor of the existing building. Approval is contingent upon adhering to the approved plans on file and plan review report. Work to include: removal of select interior nonbearing walls, removal of select door/door frames, removal of select plumbing fixtures, removal of select millwork, removal of select suspended acoustic ceiling, removal of select ceiling soffit, removal of select light fixtures, construction of select new walls to make offices, a storage closet, an accessible shower room, a locker room, (3) open lounge areas, open office areas, a copy room, halls, a break room, a kitchenette, (4) conference rooms, a reception/waiting area, a war room and (2) accessible restrooms, new door/door frames, millwork, select new interior windows, new Hi/Lo drinking fountain, add 18” vertical grab bars in existing accessible restrooms, select ne suspended acoustic and gypsum ceilings, select ne light fixtures, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the building’s Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 and NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 4/13/20195/6/2019 DONE
mailed 5-10-19
Second Notice 3/21/20194/8/2019 DONE
mailed 4-11-19
First Notice 2/21/20193/11/2019 DONE
mailed 3-12
Permanent Occupancy  2/11/2019 DONE
BLD-Final1/28/20191/29/20191/29/2019APASS
DetailsDave Hannah
Call half hour before // Joe Phone #: ###-####
BLD-Final1/2/20191/2/20191/2/2019PPART
DetailsDave Hannah
Joe Phone #: ###-#### ok for temp occ need to change door hardwear on three doors and ada shower room
FIRE-Final Inspection1/2/20191/2/20191/2/2019PPASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.

Joe Phone #: ###-####
BLD-Grading Inspection12/10/201812/10/201812/10/2018PPART
DetailsBrandon Shaw
Ceiling grid, south end of office...
OK to cover...
BLD-Ceiling Grid Inspection11/29/201811/30/201811/30/2018APASS
DetailsDave Hannah
Chris Phone #: ###-####
BLD-Ceiling Grid Inspection11/29/201811/29/201811/29/2018PPART
DetailsDave Hannah
Chris Phone #: ###-#### north side ok to flood after elec passes
CHANGE STATUS TO (ISS)  10/24/2018 DONE
Print Occupancy Form  10/24/2018 DONE
BLD-Framing/Rough-in10/22/201810/23/201810/23/2018PPASS
DetailsMike Jordan
Chris Phone #: ###-####. Interior steel stud framed walls only ok.
Plan assigned to (JG)10/16/201810/16/201810/23/2018 PASS
DetailsJavier Guzman
Plan Mod - Angstman Johnson - ste #200 ePlan
Routing - PLAN CHECK10/18/2018 10/23/2018 PASS
DetailsJavier Guzman
Permit Ready to Issue  10/23/2018 DONE
plan mod so please do not re issue
Plan Modification Accepted  10/16/2018 DONE
Plan Mod - Revise doors and hardware at doors 201 (Entry to suite) off of elevator lobby. Doors and hardware to have smoke & draft control 'S' label, no longer fire rated at 1 hour. Hardware to meet IBC 710.5.2.2, 710.5.2.3 and 716.5.9. All sprinkler heads on floor verified to be or changed to be quick response heads.
Issue PAID IN FULL permit  10/3/2018 DONE
Print Occupancy Form  10/3/2018 DONE
Plan assigned to (JG)8/8/20188/8/20189/7/2018 PASS
DetailsJavier Guzman
1st rev comp, 8/09 L2 Angstman Johnson Office T.I. ePlan
Routing - MECHANICAL9/4/2018 9/7/2018 PASS
DetailsTroy James
Air balance contractor to provide outside air to space per the 2012 IMC chapter 4.
Routing - PLAN CHECK9/7/2018 9/7/2018 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK9/7/2018 9/7/2018 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  9/7/2018 DONE
Permit Ready to Issue  9/7/2018 DONE
all met-NEED
GC FORM-met
REVISED VALUE0met
(close out int demo permit BLD18-02837 when issued) 10-2-18 not ready to final out early start/demo permit
Routing - PLAN CHECK9/4/2018 9/6/2018 FAIL
DetailsJavier Guzman
Route to Impact Fee Review8/15/20188/18/20188/16/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  8/15/2018 DONE
DetailsJavier Guzman
Routing - PLAN CHECK8/3/2018 8/15/2018 FAIL
DetailsJavier Guzman
Routing - MECHANICAL8/8/2018 8/9/2018 FAIL
DetailsTroy James
Left message to applicant.
Plan assigned to (JG)8/3/20188/3/20188/7/2018 PASS
DetailsJavier Guzman
1st rev comp, 8/09 L2 Angstman Johnson ePlan, pend mech
Routing - PUBLIC WORKS8/3/2018 8/6/2018 PASS
DetailsRachael Beierle
Routing - Addressing8/3/2018 8/3/2018 PASS
DetailsDoug Chausow
Intake Approval  8/3/2018 PASS
DetailsJavier Guzman
Application received  7/17/2018 DONE
Application submitted via PDS Online on Jul 17 2018 4:25PM