BLD-Conference | 4/23/2019 | 4/24/2019 | 4/24/2019 | A | PASS |
Tony Young
|
|
|
Wes Phone #: ###-####,, final ok
|
DOC - Permit Finaled | 4/24/2019 | 4/24/2019 | 4/24/2019 | P | PASS |
Tony Young
|
|
|
|
BLD-Blower Door Test Results | 4/24/2019 | 4/24/2019 | 4/24/2019 | P | DONE |
Tony Young
|
|
|
Wes Phone #: ###-####/// 4.02
|
BLD-Final | 4/12/2019 | 4/15/2019 | 4/15/2019 | A | FAIL |
Tony Young
|
|
|
Wes Phone #: ###-####,, fire caulking not complete
|
BLD-Final | 4/8/2019 | 4/9/2019 | 4/9/2019 | A | FAIL |
Tony Young
|
|
|
Wes Flacker ###-#### wflacker@hotmail.com Phone #: ###-#### Inspection requested via web by Wesley Flacker c/n posted
|
BLD-Final | 4/5/2019 | 4/8/2019 | 4/8/2019 | P | NH |
Tony Young
|
|
|
This house is across the street from 5807 Portsmouth inspection already scheduled for Monday. Andrina no longer works for Magellan Companies Please direct all communications to Wes Flacker ###-#### wflacker@hotmail.com Phone #: ###-#### Inspection requested via web by Wesley Flacker// // house locked,, no code,, no answer
|
BLD-Energy code compliance | 12/20/2018 | 12/20/2018 | 12/20/2018 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Andrina Davis
|
BLD-Framing/Rough-in | 12/20/2018 | 12/20/2018 | 12/20/2018 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Andrina Davis
|
BLD-Framing/Rough-in | 12/19/2018 | 12/20/2018 | 12/20/2018 | A | FAIL |
Brandon Shaw
|
|
|
Hold downs need bolts drilled and epoxied... Do Not Cover...
|
BLD-Energy code compliance | 12/19/2018 | 12/20/2018 | 12/20/2018 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Andrina Davis
|
BLD-Energy code compliance | 12/19/2018 | 12/19/2018 | 12/19/2018 | P | CANC |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Andrina Davis
|
BLD-Framing/Rough-in | 12/19/2018 | 12/19/2018 | 12/19/2018 | P | FAIL |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Andrina Davis c/n items not done
|
BLD-Framing/Rough-in | 12/12/2018 | 12/12/2018 | 12/12/2018 | P | FAIL |
Brandon Shaw
|
|
|
Per plans- B6 header to be (2) 2x10 DF #2... Hold downs to be drilled and epoxied with nuts/washers... No air/foam seal...
|
BLD-Wall Bracing | 11/14/2018 | 11/15/2018 | 11/15/2018 | A | PASS |
Tony Young
|
|
|
call Dennis, framer Phone #: ###-#### Inspection requested via web by Andrina Davis
|
BLD-Footing | 9/11/2018 | 9/12/2018 | 9/12/2018 | A | PART |
Jim Sly
|
|
|
Paul Phone #: ###-#### Forms up, no one on site. No string lines pulled......un- able to determine Exact setbacks. Pour at own risk.
|
Issue PAID IN FULL permit | | | 8/30/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/30/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/30/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 8/29/2018 | | |
|
|
|
|
Plan assigned to (J_N) | 8/13/2018 | 8/13/2018 | 8/29/2018 | | DONE |
|
|
|
08/17 sfd L1 ePlan. 2nd Review, Braced wall and design criteria. 1st review complete, braced wall deficiencies, roof beam calculations, design criteria, show girder trusses
|
Routing - PLAN CHECK | 8/29/2018 | | 8/29/2018 | | PASS |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/29/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/29/2018 | | DONE |
|
|
|
met
|
Routing - PLAN CHECK | 8/22/2018 | | 8/22/2018 | | FAIL |
Michael Hanson
|
|
|
Wall bracing and design criteria deficiences. See ePlan mark ups from Jenny Nelson. MDH
|
1st review completed | | | 8/17/2018 | | FAIL |
|
|
|
Braced wall deficiencies, roof beam calculations, show girder truss locations, provide design criteria
|
Routing - PLAN CHECK | 8/6/2018 | | 8/17/2018 | | FAIL |
Michael Hanson
|
|
|
|
Routing - MECHANICAL | 8/8/2018 | | 8/8/2018 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 8/6/2018 | 8/9/2018 | 8/7/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 8/6/2018 | | 8/7/2018 | | FAIL |
Troy James
|
|
|
Emailed correction to creek enterprise
|
Routing - PLANNING | 8/6/2018 | | 8/6/2018 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 8/6/2018 | | 8/6/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/6/2018 | | 8/6/2018 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 8/6/2018 | | FAIL |
|
|
|
Please provide a REScheck or prescriptive method shown on plans.
|
Plans ACCEPTED BY PLAN TECH | | | 8/6/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/6/2018 | | DONE |
|
|
|
|
Intake Approval | | | 8/6/2018 | | PASS |
|
|
|
|
Plan assigned to (M_H) | 8/6/2018 | | 8/6/2018 | | DEFR |
Michael Hanson
|
|
|
08/17 sfd L1 ePlan
|
Intake Approval | | | 7/27/2018 | | FAIL |
|
|
|
Update to 2015 IRC
provide manual J
|
Application received | | | 7/17/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 17 2018 4:38PM
|