BLD-Final | 5/16/2019 | 5/16/2019 | 5/17/2019 | P | PASS |
Brandon Shaw
|
|
|
Call ahead // Brad Phone #: ###-####
|
DOC - Permit Finaled | 5/17/2019 | 5/17/2019 | 5/17/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Aging Inspection | 4/18/2019 | 4/18/2019 | 4/22/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 4/17/2019 | 4/17/2019 | 4/22/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Energy code compliance | 12/3/2018 | 12/4/2018 | 12/4/2018 | A | PASS |
Dave Hannah
|
|
|
Brad Phone #: ###-####
|
BLD-Energy code compliance | 11/28/2018 | 11/29/2018 | 11/29/2018 | A | PART |
Dave Hannah
|
|
|
Devin Phone #: ###-#### air seal pass
|
BLD-Framing/Rough-in | 11/20/2018 | 11/21/2018 | 11/21/2018 | A | PEND |
Brandon Shaw
|
|
|
Need to foam/air seal... OK to insulate
|
BLD-Conference | 9/10/2018 | 9/11/2018 | 9/11/2018 | A | DONE |
Dave Hannah
|
|
|
Devon Phone #: ###-####
|
BLD-Footing | 8/31/2018 | 9/4/2018 | 9/4/2018 | A | PASS |
Tony Young
|
|
|
devin Phone #: ###-####,, 3 interior footings ok,, over the top of existing concrete
|
Permit Ready to Issue | | | 8/28/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/28/2018 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 8/7/2018 | 8/7/2018 | 8/15/2018 | | PASS |
Josh Bogle
|
|
|
08/13 remodel, paper - 1st done
|
Routing - MECHANICAL | 8/14/2018 | | 8/15/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 8/14/2018 | | 8/15/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 8/15/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 8/15/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 8/15/2018 | | DONE |
|
|
|
|
Telephone call | | | 8/15/2018 | | DONE |
|
|
|
called Brad to let know permit is ready and how much is owed
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/15/2018 | | DONE |
Josh Bogle
|
|
|
|
Routing Walk-In (BLD) | 8/14/2018 | 8/14/2018 | 8/14/2018 | P | PASS |
Josh Bogle
|
|
|
routed to Mechanical
|
Routing - PLAN CHECK | 8/7/2018 | | 8/10/2018 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 8/10/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing Walk-In (BLD) | 8/7/2018 | 8/7/2018 | 8/7/2018 | A | PASS |
Josh Bogle
|
|
|
took in as a level 2 pending engineering calcs
|
Routing - PLAN CHECK | 7/26/2018 | | 7/26/2018 | | FAIL |
Brian McGowan
|
|
|
plans need engineering. moving existing bearing walls from under a handstacked roof. Existing floor structure did not pass when the existing bearing walls in the basement were proposed to be removed.
|
Routing Walk-In (BLD) | 7/18/2018 | 7/18/2018 | 7/18/2018 | P | FAIL |
Brian McGowan
|
|
|
Wanted to only do the interior of a proposed remodel. Plans were for new Garage with Living Space, Complete remodel of existing home with exterior decks and exterior work. I asked him to modifiy the plans to only what he is proposing.
|
1st review completed | | | 7/18/2018 | | FAIL |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 7/18/2018 | | 7/18/2018 | | FAIL |
Brian McGowan
|
|
|
|
Application received | | 7/18/2018 | | | |
|
|
|
|