BLD-Final | 1/17/2019 | 1/17/2019 | 1/17/2019 | P | PASS |
Brandon Shaw
|
|
|
|
DOC - Permit Finaled | 1/17/2019 | 1/17/2019 | 1/17/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 1/17/2019 | 1/17/2019 | 1/17/2019 | P | PASS |
Brandon Shaw
|
|
|
Per Doug with Public Works Addressing Department, 3316 Ussery is the address asigned to the ADU...
|
BLD-Final | 1/3/2019 | 1/3/2019 | 1/3/2019 | P | NR |
Tony Young
|
|
|
call 30 mins for access- Noah Phone #: ###-####,, needs address issued resolved,, fire wall/ceiling sealed,, guard rails per code
|
BLD-Energy code compliance | 9/7/2018 | 9/10/2018 | 9/10/2018 | A | CANC |
Brandon Shaw
|
|
|
Air/foam seal all exterior penetrations at upstairs living space, and seal all horizontal penetrations at ceiling line in garage
|
BLD-Framing/Rough-in | 8/31/2018 | 9/4/2018 | 9/4/2018 | A | PEND |
Tony Young
|
|
|
Rimmy Phone #: ###-####,, needs seal pack,, ok to insulate
|
BLD-Framing/Rough-in | 8/31/2018 | 8/31/2018 | 8/31/2018 | P | PART |
Tony Young
|
|
|
Rimmy; Phone #: ###-####,, ok to insulate,, verify seal package at energy
|
Routing Walk-In (Zoning) | 7/20/2018 | 7/20/2018 | 7/20/2018 | A | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 7/20/2018 | 7/20/2018 | 7/20/2018 | A | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 7/20/2018 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 7/20/2018 | | 7/20/2018 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 7/20/2018 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 7/20/2018 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/20/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 7/20/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/20/2018 | | DONE |
|
|
|
|
(F) Reprint permit | | | 7/20/2018 | | DONE |
|
|
|
|
Application received | | 7/20/2018 | | | |
|
|
|
|