BLD-Final | 11/15/2018 | 11/16/2018 | 11/16/2018 | P | NR |
Jim Sly
|
|
|
Earl Phone #: ###-####
|
BLD-Final | 11/5/2018 | 11/6/2018 | 11/6/2018 | P | FAIL |
Mike Jordan
|
|
|
Lisa Phone #: ###-####. Provide opening protection in garage wall at water lines and on/off water valve. provide carbon monoxide detector outside of bedroom. Step into living room exceeds the 7.75 inch max riser height. correction notice issued.
|
BLD-Final | 11/2/2018 | 11/5/2018 | 11/5/2018 | P | CANC |
Mike Jordan
|
|
|
late as possible // Lisa Arnold Phone #: ###-####
|
BLD-Final | 10/25/2018 | 10/26/2018 | 10/26/2018 | P | CANC |
Mike Jordan
|
|
|
Earl Phone #: ###-####
|
BLD-Energy code compliance | 9/17/2018 | 9/18/2018 | 9/18/2018 | A | NR |
Mike Jordan
|
|
|
Mid morning inspection between 9:00-10:00 am if possible, please. Thank you! Phone #: ###-#### Inspection requested via web by Tom Noeker
|
BLD-Energy code compliance | 9/17/2018 | 9/17/2018 | 9/17/2018 | P | CANC |
Brandon Shaw
|
|
|
Phone #: 2089605165 >> Inspection requested via mobile web by Dustin Collins Inspection cancelled from web by: Tom Noeker
|
BLD-Framing/Rough-in | 9/13/2018 | 9/14/2018 | 9/14/2018 | P | PASS |
Mike Jordan
|
|
|
Mechanical inspection is scheduled for the morning. Phone #: ###-#### Inspection requested via web by Tom Noeker
|
Routing - MECHANICAL | 9/14/2018 | | 9/14/2018 | | PASS |
Troy James
|
|
|
Manual j report
|
BLD-Framing/Rough-in | 9/7/2018 | 9/11/2018 | 9/11/2018 | A | NR |
Mike Jordan
|
|
|
Kevin is the on-site PM Phone #: ###-#### Inspection requested via web by Tom Noeker. Needs mech. rough in inspection prior to framing inspection.
|
BLD-Wall Bracing | 9/4/2018 | 9/4/2018 | 9/4/2018 | P | PASS |
Mike Jordan
|
|
|
asap please // Aaron Phone #: ###-####
|
BLD-Conference | 8/24/2018 | 8/24/2018 | 8/27/2018 | P | CANC |
Mike Jordan
|
|
|
Phone #: 2089605165 >> Inspection requested via mobile web by Dustin
|
BLD-Footing | 8/13/2018 | 8/14/2018 | 8/14/2018 | P | PART |
Mike Jordan
|
|
|
Footing inspection for new addition Phone #: ###-#### Inspection requested via web by Tom Noeker. Pending reapir on plumbing.
|
Routing Walk-In (BLD) | 8/7/2018 | 8/7/2018 | 8/7/2018 | P | PASS |
Josh Bogle
|
|
|
|
Issue PAID IN FULL permit | | | 7/31/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 7/30/2018 | | |
|
|
|
|
Routing Walk-In (Zoning) | 7/30/2018 | 7/30/2018 | 7/30/2018 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 7/30/2018 | 7/30/2018 | 7/30/2018 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 7/30/2018 | | 7/30/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 7/30/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 7/30/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 7/30/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/30/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 7/30/2018 | | DONE |
|
|
|
Need - Met
RP
|
Routing Walk-In (Zoning) | 7/23/2018 | 7/23/2018 | 7/23/2018 | P | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 7/23/2018 | 7/23/2018 | 7/23/2018 | P | FAIL |
Rob Patrick
|
|
|
Need ledger detail and updated PFH details.
|
Application received | | 7/23/2018 | | | |
|
|
|
|