BLD-Final | 1/25/2019 | 1/25/2019 | 1/25/2019 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
DOC - Permit Finaled | 1/25/2019 | 1/25/2019 | 1/25/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 1/25/2019 | 1/25/2019 | 1/25/2019 | P | DONE |
Brandon Shaw
|
|
|
ACh50- 4.13
|
BLD-Final | 1/24/2019 | 1/24/2019 | 1/24/2019 | A | NR |
Brandon Shaw
|
|
|
Need PLM final
|
PubWorks Occupancy Approval | 1/15/2019 | 1/15/2019 | 1/15/2019 | | DONE |
Melissa Jannusch
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Other | 11/19/2018 | 11/19/2018 | 11/19/2018 | P | PASS |
Jim Sly
|
|
|
Soffits.......OK
|
BLD-Other | 11/19/2018 | 11/19/2018 | 11/19/2018 | P | CANC |
Jim Sly
|
|
|
Soffit Inspection Phone #: ###-#### Inspection requested via web by Kyle Seick Soffit....OK.
|
BLD-Energy code compliance | 11/15/2018 | 11/16/2018 | 11/16/2018 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Framing/Rough-in | 11/13/2018 | 11/13/2018 | 11/13/2018 | P | PART |
Brandon Shaw
|
|
|
As per plans, (2) 9 1/2 LVL required at interior bearing wall- Master bath/closet... Provide straps at break in double plates at interior bearing walls... See red paint OK to insulate
|
BLD-Wall Bracing | 10/26/2018 | 10/26/2018 | 10/26/2018 | P | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
|
BLD-Wall Bracing | 10/23/2018 | 10/24/2018 | 10/24/2018 | A | FAIL |
Brandon Shaw
|
|
|
Hold downs to be as per plans- H7 w/ 2"x2" washer not installed at kitchen/dining area... House wrap installed prior to inspection- remove to verify nailing at hold downs and garage ... Edge nailing and blocking to be as per plans... See red paint
|
BLD-Foundation | 9/25/2018 | 9/25/2018 | 9/25/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Foundation | 9/24/2018 | 9/24/2018 | 9/24/2018 | P | NR |
Brandon Shaw
|
|
|
No one on site at time of inspection
|
BLD-Footing | 9/20/2018 | 9/20/2018 | 9/24/2018 | P | CANC |
Adele J Schaffeld-Griffin
|
|
|
Inspection cancelled via mobile web on Monday, September 24, 2018.
|
BLD-Footing | 9/20/2018 | 9/20/2018 | 9/20/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 9/20/2018 | 9/20/2018 | 9/20/2018 | A | NR |
Brandon Shaw
|
|
|
Need subgrade submitted and approved by PW...
|
BLD-Conference | 9/20/2018 | 9/20/2018 | 9/20/2018 | P | CANC |
Brandon Shaw
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell Inspection cancelled via mobile web on Thursday, September 20, 2018.
|
PubWorks Subgrade Approval | 9/20/2018 | 9/20/2018 | 9/20/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
OVERRIDE | | | 9/10/2018 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 8/29/2018 | 8/29/2018 | 9/10/2018 | | PASS |
Josh Bogle
|
|
|
09/04 sfd L2 ePlan - 1st done, passed Plan Review, failed Fire
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/10/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 9/10/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/10/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/10/2018 | | DONE |
|
|
|
|
Routing - FIRE | 9/4/2018 | 9/4/2018 | 9/7/2018 | | PASS |
Tim Frost
|
|
|
Resubmittal New SFH
|
Plan Reviewer's activity | | | 9/4/2018 | | DONE |
Josh Bogle
|
|
|
accepted resumittal - routed to Fire
|
1st review completed | | | 8/30/2018 | | FAIL |
Josh Bogle
|
|
|
fire
|
Routing - PLAN CHECK | 8/16/2018 | | 8/30/2018 | | PASS |
Josh Bogle
|
|
|
|
Plan assigned to (M_H) | 8/16/2018 | | 8/29/2018 | | DEFR |
Michael Hanson
|
|
|
09/04 sfd L2 ePlan
|
Routing PW Grading-Hillside | 8/16/2018 | | 8/20/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Route to Impact Fee Review | 8/16/2018 | 8/19/2018 | 8/17/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 8/16/2018 | | 8/17/2018 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 8/16/2018 | 8/16/2018 | 8/16/2018 | | FAIL |
Tim Frost
|
|
|
New SFH
See attached review
|
Routing - PLANNING | 8/16/2018 | | 8/16/2018 | | PASS |
Jeff Lowe
|
|
|
|
Routing - Addressing | 8/16/2018 | | 8/16/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/16/2018 | | 8/16/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 8/16/2018 | | 8/16/2018 | | PASS |
Michael Zawacki
|
|
|
Foothills home. Site prep inspection required.
|
Plans ACCEPTED BY PLAN TECH | | | 8/16/2018 | | DONE |
|
|
|
|
Intake Approval | | | 8/16/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/16/2018 | | DONE |
|
|
|
|
Application received | | | 7/24/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 24 2018 3:15PM
|