Permit Information
Permit NumberBLD18-02648
StatusFinaled
Name PACIFIC HOME & PATIO
Site Address 4444 W QUAIL RIDGE DR
Project NameSmith Patio Cover
Customer Number 
ePlanReviewNo
Description
HILLSIDE - Permit for 176sq' (8’x18’) of pre-engineered metal patio cover. All work per plans, engineering, manufacturer’s specs, & local code. **JAB**
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/28/20189/28/20189/28/2018PPASS
DetailsJim Sly
kelly Phone #: ###-####
DOC - Permit Finaled9/28/20189/28/20189/28/2018PPASS
DetailsJim Sly
BLD-Footing8/28/20188/30/20188/30/2018APASS
DetailsTony Young
Kelly Phone #: ###-####
PubWorks Subgrade Approval8/23/20188/23/20188/23/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

Issue PAID IN FULL permit  8/1/2018 DONE
Plan assigned to (JAB) Josh7/25/20187/25/20187/27/2018 PASS
DetailsJosh Bogle
07/31 Patio Cover paper
Routing - PLAN CHECK7/26/2018 7/27/2018 PASS
DetailsJosh Bogle
1st review completed  7/27/2018 DONE
DetailsJosh Bogle
Inspection Record Card- Bld  7/27/2018 DONE
DetailsJosh Bogle
Case Summary (BLD)  7/27/2018 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  7/27/2018 DONE
DetailsJosh Bogle
Permit Ready to Issue  7/27/2018 DONE
met
Telephone call  7/27/2018 DONE
Spoke with Kelly to inform him the permit is ready
Routing Walk-In (Zoning)7/26/20187/26/20187/26/2018APASS
DetailsNicolette Womack
Routing Walk-In (BLD)7/26/20187/26/20187/26/2018APASS
DetailsJosh Bogle
tokk in as a level 2 - Hillside
Routing - PUBLIC WORKS7/26/2018 7/26/2018 PASS
DetailsMorgan Webb
Routing - PLANNING  7/26/2018 PASS
Routing PW Grading-Hillside7/25/2018 7/26/2018 PASS
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Plans ACCEPTED BY PLAN TECH  7/25/2018 DONE
Intake Approval  7/25/2018 PASS
Recd Pcfee & Taken To Pln CK  7/25/2018 DONE
Application received 7/25/2018