BLD-Aging Inspection | 12/2/2019 | 12/2/2019 | 12/2/2019 | | DONE |
Jim Storey
|
|
|
exp. no work
|
DOC - Permit Expired | 12/2/2019 | 12/2/2019 | 12/2/2019 | P | PASS |
Jim Storey
|
|
|
no work performed
|
Telephone call | | | 1/17/2019 | | DONE |
|
|
|
Left a message with Jason for Dale to give me a call about this permit expiring in 5 days
|
Telephone call | | | 1/17/2019 | | DONE |
|
|
|
spoke with Josh about what is needed to have this permit issued. informed once permit is issued they have a year to call in first inspection and stated everytime a bld inspection is passed it will extened the date out by 180 days. Josh stated he will send over the 302 and 306
|
Issue PAID IN FULL permit | | | 1/17/2019 | | |
|
|
|
|
Inspection Record Card- Bld | | | 1/17/2019 | | DONE |
|
|
|
|
Expiration Notice | 12/27/2018 | 1/18/2019 | 12/27/2018 | | DONE |
Brittany Hill
|
|
|
|
Plan assigned to (M_H) | 11/9/2018 | | 11/28/2018 | | DONE |
Michael Hanson
|
|
|
11/26 #516 L2 ePlan. Preifert Steel Racking (L-2)
|
Routing - PLAN CHECK | 11/9/2018 | | 11/28/2018 | | PASS |
Michael Hanson
|
|
|
|
1st review completed | | | 11/28/2018 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/28/2018 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 11/28/2018 | | DONE |
|
|
|
MET
NEED
GC
Rev cert of val-met
|
Routing - FIRE | 11/9/2018 | 11/9/2018 | 11/23/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Intake Approval | | | 11/7/2018 | | PASS |
|
|
|
|
Intake Approval | | | 9/27/2018 | | FAIL |
Brian McGowan
|
|
|
Please provide or correct the following items:
1. Vicinity Map. A vicinity or location map showing the site of the proposed activity. The site must be clearly marked and
shown in relation to the nearest major roads, cities, and waterways in the area. The map needs to have enough
information to allow someone to look at the map and be able to get to the site without requesting more
information.
2. A Key Plan and Site Plan can be combined provided it provides all the requested information (dimensions, fire hydrant locations, Fire Department Accesses). Please add the items from the Checklist.
3. Resubmitted plan sheets or documents must be renamed exactly as the original it is replacing. This allows the documents to be "versioned" over the previous submittal. (I renamed the last resubmittal so it will version as required.) I will delete the other after the next resubmittal.
4. The structural provided did not include required calculations listed in the report provided for the racking, please provide the entire report. Calculations for the attachment to the concrete floor are required as well. Please provide these items.
5. As per Tim Frost-FIRE, perform and provide a Fire Sprinkler Analyst.
|
Intake Approval | | | 8/2/2018 | | FAIL |
Brian McGowan
|
|
|
|
Application received | | | 7/25/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 25 2018 1:00PM
|