Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD18-02667
StatusIssued
Name SBP LLLP
Site Address 1099 W FRONT ST
Project NameSimplot Office North
Customer Number 
ePlanReviewYes
Description
(SIMPOLOT WORLD HEADQUARTERS) //Plan modification to remove the enclosed conference room and create three offices, insulate floor within this tenant space over unconditioned area of basement and revise electrical/mechanical plans. 9-27-2018 JG// The fire sprinkler system is used because this is a high rise building. Permit to build out a 2,288 sq. ft. individual area on the west end main floor area within a 306,345 sq. ft. building (Shell under BLD14-03688). Approval is contingent upon adhering to the approved plans on file and plan review report. Work to include: constriction of furred walls over existing exterior insulated walls, construction of interior non-bearing walls to make a conference room and an open office/meeting area, select new door, new access floor system, select new interior storefront window, new acoustic suspended ceiling and new gypsum soffit ceiling, millwork, light fixtures, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. (Note: the floor area of this buildout space is stated to be above the basement mechanical rooms, field verify this space below the buildout is conditioned space which would allow for uninsulated floor slab of the buildout). This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/10/20191/11/20191/11/2019PPASS
DetailsDave Hannah
Cecil Phone #: ###-####
FIRE-Final Inspection1/10/20191/10/20191/10/2019APASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguisher will be placed in discussed location. Final life fire safety inspection for area of work complete.

BLD-Framing/Rough-in11/1/201811/2/201811/2/2018APASS
DetailsDave Hannah
Cecil Phone #: ###-####
CHANGE STATUS TO (ISS)  10/10/2018 DONE
Print Occupancy Form  10/10/2018 DONE
Plan assigned to (JG)9/26/20189/26/201810/9/2018 PASS
DetailsJavier Guzman
Plan Mod Simplot ePlan
Routing - PLAN CHECK9/27/2018 10/9/2018 PASS
DetailsJavier Guzman
Permit Ready to Issue  10/9/2018 DONE
Plan mod please do not re issue-no valuation changed
Routing - MECHANICAL9/27/2018 10/4/2018 PASS
DetailsTroy James
Plan Modification Accepted  9/26/2018 DONE
Revised small meeting room to 3 offices on the east side of the tenant space. add closed cell spray foam insulation under access floor over unconditioned hallway in basement. revised mechanical and electrical to reflect the new design layout
Issue PAID IN FULL permit  9/17/2018 DONE
Print Occupancy Form  9/17/2018 DONE
Plan assigned to (JG)8/14/20188/14/20189/4/2018 PASS
DetailsJavier Guzman
1st rev comp, 8/24 L2 Simplot Office Bldg North TI ePlan
Routing - PLAN CHECK9/4/2018 9/4/2018 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  9/4/2018 DONE
Permit Ready to Issue  9/4/2018 DONE
STEVE@INSIGHTARCHITECTS.COM
MET
NEED
GC FORM
REVISED VALUE
Route to Impact Fee Review8/24/20188/27/20188/27/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - FIRE8/24/20188/24/20188/24/2018 PASS
DetailsAdele J Schaffeld-Griffin
No Fire Plan Review report provided, see red line notes on plans. Fire spirnkler and Fire alarm shall be submitted and permitted separatly
1st review completed  8/24/2018 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK8/14/2018 8/24/2018 FAIL
DetailsJavier Guzman
Routing - Addressing8/14/2018 8/15/2018 PASS
DetailsDoug Chausow
No suite or extra address needed, as property is owned by company, facilities manager.
Routing - PUBLIC WORKS8/14/2018 8/14/2018 PASS
DetailsMorgan Webb
Routing - MECHANICAL8/14/2018 8/14/2018 PASS
DetailsTroy James
Routing - Design Review8/14/2018 8/14/2018 PASS
DetailsKatelyn Menuge
Intake Approval  8/13/2018 PASS
DetailsJavier Guzman
Intake Approval  7/31/2018 FAIL
DetailsMichael Hanson
This permit has failed prescreen due to the following:
1. Exterior modification - Please provide Design Review approval letter.
Application received  7/26/2018 DONE
Application submitted via PDS Online on Jul 26 2018 11:42AM