BLD-Footing | 8/29/2018 | 8/30/2018 | 8/30/2018 | A | PASS |
Tony Young
|
|
|
Gunite spa Phone #: ###-#### Inspection requested via web by Steve Chandler,, clean debris and roots out prior to shotcrete
|
PubWorks Subgrade Approval | 8/29/2018 | 8/29/2018 | 8/29/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the spa subgrade is acceptable has been received by Public Works. Inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Telephone call | | | 8/7/2018 | | DONE |
|
|
|
left voicemail for William to inform him the permit is ready and what fees are due.
|
Issue PAID IN FULL permit | | | 8/7/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 8/6/2018 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 7/27/2018 | 7/27/2018 | 8/6/2018 | | PASS |
Josh Bogle
|
|
|
08/02 pool Paper Hillside
|
Routing - PLAN CHECK | | | 8/6/2018 | | PASS |
Josh Bogle
|
|
|
|
Routing - PUBLIC WORKS | | | 8/6/2018 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 8/6/2018 | | 8/6/2018 | | PASS |
Michael Zawacki
|
|
|
Foothills pool, no site prep inspection required.
|
Routing PW Grading-Hillside | 8/3/2018 | | 8/6/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable must be approved by Public Works prior to scheduling inspections. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
1st review completed | | | 8/6/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 8/6/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 8/6/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/6/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 8/6/2018 | | DONE |
|
|
|
Need
RP
|
Routing Walk-In (Zoning) | 7/27/2018 | 7/27/2018 | 7/27/2018 | A | PASS |
Jeff Lowe
|
|
|
pursuant to approval by PW for hillside
|
Plans ACCEPTED BY PLAN TECH | | | 7/27/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/27/2018 | | DONE |
|
|
|
Hillside, take in to route
|
Routing - Addressing | 7/27/2018 | | 7/27/2018 | | PASS |
Doug Chausow
|
|
|
|
Application received | | 7/27/2018 | | | |
|
|
|
|