BLD-Final | 12/3/2018 | 12/4/2018 | 12/4/2018 | P | PASS |
Brandon Shaw
|
|
|
Final Inspection on CMU retaining wall. Phone #: ###-#### Inspection requested via web by Admin Assistant
|
DOC - Permit Finaled | 12/4/2018 | 12/4/2018 | 12/4/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Foundation | 11/2/2018 | 11/2/2018 | 11/2/2018 | P | PASS |
Brandon Shaw
|
|
|
Finish top cord and cap stones... Need PW approval before final...
|
PubWorks Subgrade Approval | 10/30/2018 | 10/30/2018 | 10/30/2018 | | DONE |
Melissa Jannusch
|
|
|
RETAINING WALL A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Other | 10/25/2018 | 10/26/2018 | 10/29/2018 | P | DEFR |
Brandon Shaw
|
|
|
Need Geo subgrade submitted and approved by PW...
|
BLD-Footing | 10/2/2018 | 10/4/2018 | 10/4/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
|
Issue PAID IN FULL permit | | | 9/12/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/12/2018 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 8/16/2018 | 8/16/2018 | 8/20/2018 | | PASS |
Josh Bogle
|
|
|
08/22 retaining wall, ePlan
|
Routing - PLAN CHECK | 8/16/2018 | | 8/20/2018 | | PASS |
Josh Bogle
|
|
|
|
Routing PW Grading-Hillside | 8/16/2018 | | 8/20/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
1st review completed | | | 8/20/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/20/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 8/20/2018 | | DONE |
|
|
|
Per Michael Z ESC18-00558 can be used for this permit
|
Routing - PLANNING | 8/16/2018 | | 8/17/2018 | | PASS |
Sue Cummings
|
|
|
|
Routing - PUBLIC WORKS | 8/16/2018 | | 8/17/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 8/16/2018 | | 8/16/2018 | | PASS |
Michael Zawacki
|
|
|
No new plan needed. Please refer to existing ESC18-00558 for home and lot.
|
Routing - Addressing | 8/16/2018 | | 8/16/2018 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/16/2018 | | DONE |
|
|
|
|
Intake Approval | | | 8/16/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/16/2018 | | DONE |
|
|
|
no fees taken at intake
|
Application received | | | 7/27/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 27 2018 2:10PM
|