Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD18-02690
StatusFinaled
Name BRUNO BUILT INC
Site Address 3523 E VIA ESTANCIA LN
Project NamePrivada L2 Retaining Wall
Customer Number 
ePlanReviewYes
Description
Permit for a CMU block decorative retaining wall, 2 to 3 ft tall, approx 100 ft long, with 30"x10" footings. All work per plans, engineering, & local code. **JAB**
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/3/201812/4/201812/4/2018PPASS
DetailsBrandon Shaw
Final Inspection on CMU retaining wall. Phone #: ###-#### Inspection requested via web by Admin Assistant
DOC - Permit Finaled12/4/201812/4/201812/4/2018PPASS
DetailsBrandon Shaw
BLD-Foundation11/2/201811/2/201811/2/2018PPASS
DetailsBrandon Shaw
Finish top cord and cap stones...
Need PW approval before final...
PubWorks Subgrade Approval10/30/201810/30/201810/30/2018 DONE
DetailsMelissa Jannusch
RETAINING WALL A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

BLD-Other10/25/201810/26/201810/29/2018PDEFR
DetailsBrandon Shaw
Need Geo subgrade submitted and approved by PW...
BLD-Footing10/2/201810/4/201810/4/2018APASS
DetailsBrandon Shaw
Work in progress
Issue PAID IN FULL permit  9/12/2018 DONE
Inspection Record Card- Bld  9/12/2018 DONE
Plan assigned to (JAB) Josh8/16/20188/16/20188/20/2018 PASS
DetailsJosh Bogle
08/22 retaining wall, ePlan
Routing - PLAN CHECK8/16/2018 8/20/2018 PASS
DetailsJosh Bogle
Routing PW Grading-Hillside8/16/2018 8/20/2018 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

1st review completed  8/20/2018 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  8/20/2018 DONE
DetailsJosh Bogle
Permit Ready to Issue  8/20/2018 DONE
Per Michael Z ESC18-00558 can be used for this permit
Routing - PLANNING8/16/2018 8/17/2018 PASS
DetailsSue Cummings
Routing - PUBLIC WORKS8/16/2018 8/17/2018 PASS
DetailsRachael Beierle
Routing - Erosion and Sediment8/16/2018 8/16/2018 PASS
DetailsMichael Zawacki
No new plan needed. Please refer to existing ESC18-00558 for home and lot.
Routing - Addressing8/16/2018 8/16/2018 PASS
DetailsDoug Chausow
Plans ACCEPTED BY PLAN TECH  8/16/2018 DONE
Intake Approval  8/16/2018 PASS
Recd Pcfee & Taken To Pln CK  8/16/2018 DONE
no fees taken at intake
Application received  7/27/2018 DONE
Application submitted via PDS Online on Jul 27 2018 2:10PM