Permit Information
Permit NumberBLD18-02692
StatusIssued
Name CULPAN & COMPANY
Site Address 599 N SAN FELIPE DR
Project NameHansen Guest House
Customer NumberBLD18-02370 & BLD18-02692
ePlanReview 
Description
(2 PERMITS FILED UNDER BLD18-02370 IN EPLANREVIEW) (Ref. Demolition Bld17-02215 & Bld17-02217) Permit for the construction of a new 1563 sq. ft., two story (first story 955 sq. ft., second story 609 sq. ft.) single family dwelling with 3 bedrooms, 2 bathrooms, 45 sq. ft. of covered patio/porch and a 300 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1B zoning and setbacks per planning. MDH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection8/14/20198/14/20198/19/2019 PEND
DetailsDave Hannah
BLD-Aging Inspection8/13/20198/13/20198/19/2019 PEND
DetailsDave Hannah
BLD-Footing3/29/20194/1/20194/1/2019APASS
DetailsDave Hannah
Chris Phone #: ###-#### first wall ftg ok
Inspection Record Card- Bld  2/11/2019 DONE
Issue PAID IN FULL permit  2/11/2019 DONE
Routing - PLAN CHECK2/7/2019 2/7/2019 PASS
DetailsMichael Hanson
Routing Off Site - STRUCTURAL2/7/2019 2/7/2019 PASS
DetailsMichael Hanson
Per Jan W. @ Stapley engineering. See documents in ePlan.
PLANS/APPL TAKEN TO FRONT DESK  2/7/2019 DONE
DetailsMichael Hanson
Routing PW Grading-Hillside2/7/2019 2/7/2019 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call ###-#### to schedule an inspection.



All disturbed slopes included in the construction of this project must be stabilized and approved by Public Works before a Final Occupancy Permit is granted. If weather conditions prohibit revegetation and stabilization activities, the contractor shall provide a bond/surety agreement or an irrevocable letter of credit in the amount of 110% of the cost estimated by the project engineer to enable stabilization of the site. Call ###-#### for an inspection.
Permit Ready to Issue  2/7/2019 DONE
met
Plan assigned to (M_H)7/5/2018 2/7/2019 DONE
DetailsMichael Hanson
07/24 main permit is BLD18-02370 approval of this permit is dependant on the main permit approval. MDH
Routing Off Site - STRUCTURAL1/18/2019 1/18/2019 FAIL
DetailsMichael Hanson
Per Jan @ Stapley engineering. See ePlan for corrections required. MDH
Routing - PLAN CHECK1/16/2019 1/16/2019 FAIL
DetailsMichael Hanson
#310 form requirements not satisfied. See changemarks in ePlan.
Routing PW Grading-Hillside7/5/2018 12/4/2018 FAIL
DetailsMelissa Jannusch


Hillside Review #1 BLD18-02370 603 N SAN FELIPE DR 83712

Geotechnical report
1. Upload original geotechnical engineering report

2. Provide a conclusion from the geotechnical engineer on the suitability of the site to be constructed as proposed based on the most recent grading and drainage plan.

3. The geotechnical engineer will need to comment on the location of the seepage bed and provide any recommendations to protect the downslope home.

4. Perform infiltration testing to obtain a design infiltration rate for seepage beds


Hillside report
5. Update points under soils evaluation 2. Construction recommendations f) and note under Grading and Drainage design note 5. to match the plan and 6. Proposed Drainage Construction a)

6. Move foundation drain below footing

7. A modified proctor ASTM 1557 is recommended by the geotechnical engineer. Please update in hillside report.

Structural Engineering

8. Letter from the structural engineer on the condition of the existing rock walls and their ability to bear the new proposed structures and any recommendations to prevent sliding, overturning, or failure.

9. Seepage bed structures must be 10' from structure foundations a structural engineering may approve seepage bed setbacks from structures that are less than 10'. Please provide a statement from the structural engineer on allowing the reduced setback to the foundations or move the seepage beds.


Grading and drainage plan

10. Is the existing north retaining wall to remain? Please note on the grading and drainage plan and provide wall heights and bottom of wall elevations

11. Provide a cross section of the existing rock walls and the new walls

12. Label roof drains and show downspout locations

13. Show trench drain on grading and drainage plan

14. Label perforated pipe in seepage beds

15. Show monitoring well locations

16. Provide IDWR shallow injection well form for seepage beds

17. Provide sizing calculations and drainage time calculations for seepage beds

18. Perform infiltration testing to obtain a design infiltration rate for seepage beds

Foundation plan S 1.1
19. Provide full sheet. Submitted sheet is cropped on the south edge of the plan
Routing PW Grading-Hillside12/3/2018 12/3/2018 FAIL
DetailsMelissa Jannusch
No new information or plans uploaded to ePlan review. Correction still required.
Routing - PLAN CHECK11/30/2018 12/3/2018 FAIL
DetailsMichael Hanson
No new documents were uploaded. MDH
Routing Off Site - STRUCTURAL10/10/2018 10/10/2018 FAIL
DetailsCarl D Madsen
Routing PW Grading-Hillside9/24/2018 10/5/2018 FAIL
DetailsMichael Hanson
Per ePlan
Routing Off Site - STRUCTURAL8/6/2018 10/1/2018 FAIL
DetailsMichael Hanson
Per Jan W. @ Stapley engineering see attached documents. MDH
Routing - PLANNING9/28/2018 9/28/2018 PASS
DetailsNicolette Womack
Routing - MECHANICAL9/26/2018 9/26/2018 PASS
DetailsChad Schwendiman
Routing - PLAN CHECK9/24/2018 9/24/2018 FAIL
DetailsMichael Hanson
10 of 14 changemarks resolved. Please resolve the remaining 4 changemarks. MDH
Telephone call  9/4/2018 DONE
DetailsMichael Hanson
Contact Doug Cobb and the structural engineering is expected back soon. Hoping to get this permit resubmitted this week. MDH
Telephone call  9/4/2018 DONE
DetailsMichael Hanson
Contacted Doug Cobb, the structural engineering is to be completed soon and he is hoping to have a resubmittal in this week. MDH
Routing - FIRE7/5/20187/5/20188/10/2018 PASS
DetailsTim Frost
8/15 New SFH
Routing Off Site - STRUCTURAL8/6/2018 8/6/2018 FAIL
DetailsMichael Hanson
Per Jan W. @ Stapley engineering see attached documents. MDH
1st review completed  8/6/2018 FAIL
DetailsMichael Hanson
Routing - PLAN CHECK7/5/2018 8/6/2018 FAIL
DetailsMichael Hanson
See ePlan changemarks. MDH
Route to Impact Fee Review7/27/20187/30/20187/30/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - PLANNING7/5/2018 7/27/2018 FAIL
DetailsNicolette Womack
The retaining walls used to support the stairs in the north-west and south-west corner of the property will need to be separated by 5 feet; All parts of the wall including footing and excavation work will need to remain entirely on the subject property.
Routing - Erosion and Sediment7/5/2018 7/6/2018 PASS
DetailsAndy J. Long
ESC site map and narrative approved. Certified RP desingated. Site preparation inspection is REQUIRED.
Routing - Addressing7/5/2018 7/5/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS7/5/2018 7/5/2018 PASS
DetailsMorgan Webb
Routing - MECHANICAL7/5/2018 7/5/2018 FAIL
DetailsChad Schwendiman
emailed Legands mechanical.
Plans ACCEPTED BY PLAN TECH  7/5/2018 DONE
Intake Approval  7/5/2018 PASS
Recd Pcfee & Taken To Pln CK  7/5/2018 DONE
Application received 7/27/2018