BLD-Final | 3/21/2019 | 3/22/2019 | 3/22/2019 | A | PASS |
Tony Young
|
|
|
john Phone #: ###-####,, c of o issued
|
DOC - Permit Finaled | 3/22/2019 | 3/22/2019 | 3/22/2019 | P | PASS |
Tony Young
|
|
|
|
PubWorks Occupancy Approval | 3/21/2019 | 3/21/2019 | 3/21/2019 | | DONE |
Melissa Jannusch
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####. A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Final | 3/15/2019 | 3/15/2019 | 3/15/2019 | P | PEND |
Tony Young
|
|
|
Phil Phone #: ###-####
|
BLD-Final | 3/14/2019 | 3/15/2019 | 3/15/2019 | A | PART |
Tony Young
|
|
|
Phil Phone #: ###-####,, needs hillside pass,, firecaulking
|
BLD-Blower Door Test Results | 3/15/2019 | 3/15/2019 | 3/15/2019 | P | DONE |
Tony Young
|
|
|
Phil Phone #: ###-####/// 3.98
|
BLD-Energy code compliance | 11/15/2018 | 11/16/2018 | 11/16/2018 | P | PASS |
Tony Young
|
|
|
Phil Phone #: ###-####
|
BLD-Framing/Rough-in | 11/8/2018 | 11/9/2018 | 11/9/2018 | A | PASS |
Mike Jordan
|
|
|
Phil Phone #: ###-####
|
BLD-Other | 11/2/2018 | 11/2/2018 | 11/2/2018 | P | PART |
Tony Young
|
|
|
sofit // Phil Phone #: ###-####,, work in progress,, ok
|
BLD-Wall Bracing | 10/18/2018 | 10/19/2018 | 10/19/2018 | A | PASS |
Tony Young
|
|
|
Phil Phone #: ###-####,, exterior ok
|
BLD-Wall Bracing | 10/17/2018 | 10/18/2018 | 10/18/2018 | A | NR |
Tony Young
|
|
|
Phil Phone #: ###-####,, need to re-do some areas
|
BLD-Foundation | 9/17/2018 | 9/17/2018 | 9/17/2018 | P | PASS |
Tony Young
|
|
|
Bill Phone #: ###-####
|
BLD-Footing | 9/11/2018 | 9/12/2018 | 9/12/2018 | P | PASS |
Brandon Shaw
|
|
|
John Phone #: ###-####
|
PubWorks Subgrade Approval | 9/12/2018 | 9/12/2018 | 9/12/2018 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
OVERRIDE | | | 8/27/2018 | | |
|
|
|
|
Telephone call | | | 8/27/2018 | | DONE |
|
|
|
Left a message for John informing him that this permit is ready and the fee amount due for issuance
|
Issue PAID IN FULL permit | | | 8/27/2018 | | DONE |
|
|
|
|
(F) Reprint permit | | | 8/27/2018 | | DONE |
|
|
|
|
Inspector's copy Bld permit | | | 8/27/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/27/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/27/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/27/2018 | | DONE |
|
|
|
met
|
Plan assigned to (BJM) | 7/27/2018 | 7/27/2018 | 8/26/2018 | | DONE |
Brian McGowan
|
|
|
08/15 sfd L2 paper - Corrections required, Hillside Failed as well.
|
Routing - PLAN CHECK | 8/26/2018 | | 8/26/2018 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 8/26/2018 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/26/2018 | | DONE |
Brian McGowan
|
|
|
|
Routing - FIRE | 8/24/2018 | 8/24/2018 | 8/24/2018 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Plan Reviewer's activity | | | 8/23/2018 | | DONE |
Brian McGowan
|
|
|
John came in to review the Site Plan, add a dimension, review the Defensible Space and sign/date it.
|
Routing - PLANNING | 8/22/2018 | | 8/22/2018 | | PASS |
Nicolette Womack
|
|
|
|
Routing - PUBLIC WORKS | 8/21/2018 | | 8/21/2018 | | PASS |
Morgan Webb
|
|
|
|
Plan Reviewer's activity | | | 8/21/2018 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
Email sent to John.
Good Afternoon John,
I just received your plans form public works. I have reviewed the house you submitted for BLD18-02693. I have calculated the fire area per direction obtained from ICC. Your fire area square footage is 4,613. You can provide adequate fire flow for this square footage with 1,750 GPM. You indicated below that the fire flow was 1,750 however when I reviewed the file we do not have any documentation for this lot indicating this. If you can provide the letter indicating you have the 1,750 sq ft I can approve the fire flow.
The other item in the fire plan review report was to resubmit a site plan showing the 30’ defensible space required for WUI Zone A.
Please submit 2 copies of the documents below and I will get your permit taken care of.
If you have any questions please let me know.
Adele Schaffeld-Griffin
Assistant Building Official
Planning and Development Services
Office: ###-####
aschaffeldgriffin@cityofboise.org
Making Boise the most livable city in the country.
|
Routing PW Grading-Hillside | 8/14/2018 | | 8/21/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Plan resubmittals received | | | 8/15/2018 | | DONE |
|
|
|
Resubmittals recieved 2 sets of calcs and took Brian McGowan
|
Plan Reviewer's activity | | | 8/15/2018 | | |
Brian McGowan
|
|
|
Took Retaining wall calcs and plans to PW.
|
1st review completed | | | 8/14/2018 | | FAIL |
Brian McGowan
|
|
|
|
Plan resubmittals received | | | 8/14/2018 | | DONE |
|
|
|
Resubmittals received 2 of each-letter from P&Z & materials testing & inspections report-gave to Brian McGowan to give to PW
|
Plan Reviewer's activity | | | 8/14/2018 | | |
Brian McGowan
|
|
|
Took resubmittals tp PW to give to Melissa.
|
Routing - PLAN CHECK | | | 8/14/2018 | | FAIL |
Brian McGowan
|
|
|
|
Routing - FIRE | 8/6/2018 | 7/27/2018 | 8/10/2018 | | FAIL |
Tim Frost
|
|
|
8/15 New SFH paper
2000 Gpm needed for fire flow. 1500 Gpm is available. Modified to 1750 per Ron. 5406 ft² fire area.
Emailed contractor failed review.
|
Routing - MECHANICAL | | | 8/6/2018 | | PASS |
Troy James
|
|
|
|
Routing - Erosion and Sediment | 8/6/2018 | | 8/6/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Certified ESC team designated. Site preparation inspection is REQUIRED at start of project.
|
Routing - PLANNING | 8/3/2018 | | 8/3/2018 | | FAIL |
Nicolette Womack
|
|
|
Appeal period ends 8-6-18.
|
Routing - PUBLIC WORKS | 8/3/2018 | | 8/3/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Grading-Hillside | | | 8/3/2018 | | FAIL |
|
|
|
Hello John,
Before I can approve the building permit hillside review for BLD18-02693 4026 N Sandpoint Way I will need:
1) Planning and Zoning’s letter of approval (2 paper copies)
2) MTI’s site suitability letter (2 paper copies)
3) The retaining wall calculation packet (2 paper copies)
Please submit these to the PDS front counter when you get a chance.
Feel free to call me with questions.
Best,
Melissa
|
Routing - Addressing | 7/27/2018 | | 7/30/2018 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/27/2018 | | DONE |
|
|
|
|
Intake Approval | | | 7/27/2018 | | PASS |
|
|
|
as per Rita, Nicollette and Cody R ok to take in but can not be issued until the appeal period is up
|
Recd Pcfee & Taken To Pln CK | | | 7/27/2018 | | DONE |
|
|
|
|
Application received | | 7/27/2018 | | | |
|
|
|
|