BLD-Final | 12/26/2018 | 12/27/2018 | 12/27/2018 | P | PASS |
Jim Storey
|
|
|
Garage code: 1305 Phone #: ###-#### Inspection requested via web by Elena Stephens
|
DOC - Permit Finaled | 12/27/2018 | 12/27/2018 | 12/27/2018 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 12/20/2018 | 12/21/2018 | 12/21/2018 | P | FAIL |
Jim Storey
|
|
|
Garage code: 1305 Phone #: ###-#### Inspection requested via web by Elena Stephens plm not finaled
|
BLD-Blower Door Test Results | 12/21/2018 | 12/21/2018 | 12/21/2018 | P | DONE |
Jim Storey
|
|
|
Garage code: 1305 Phone #: ###-#### Inspection requested via web by Elena Stephens 3.55
|
BLD-Energy code compliance | 10/4/2018 | 10/5/2018 | 10/5/2018 | P | PASS |
Jim Storey
|
|
|
Inspection requested via web by Marc Foote
|
BLD-Framing/Rough-in | 10/2/2018 | 10/3/2018 | 10/3/2018 | A | PASS |
Jim Storey
|
|
|
Inspection requested via web by Marc Foote
|
BLD-Wall Bracing | 9/11/2018 | 9/12/2018 | 9/12/2018 | P | PASS |
Jim Storey
|
|
|
Inspection requested via web by Marc Foote
|
BLD-Footing | 8/20/2018 | 8/21/2018 | 8/21/2018 | A | PASS |
Jim Storey
|
|
|
Jared Phone #: ###-####
|
OVERRIDE | | | 8/15/2018 | | |
|
|
|
|
Plan assigned to (J_N) | 8/2/2018 | 8/2/2018 | 8/15/2018 | | DONE |
|
|
|
08/14 sfd L1 ePlan. 1st Review complete, update braced wall plan
|
Inspection Record Card- Bld | | | 8/15/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/15/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/15/2018 | | 8/15/2018 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/15/2018 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 8/15/2018 | | DONE |
|
|
|
met
|
1st review completed | | | 8/14/2018 | | FAIL |
|
|
|
Additional braced wall lines, braced wall lines with gypsum board must show double sided
|
Routing - PLAN CHECK | 8/1/2018 | | 8/14/2018 | | FAIL |
Rob Patrick
|
|
|
Corrections Required
|
Route to Impact Fee Review | 8/1/2018 | 8/4/2018 | 8/2/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Plan assigned to (RDP) | 8/1/2018 | 8/1/2018 | 8/2/2018 | | DEFR |
Rob Patrick
|
|
|
08/14 sfd L1 ePlan
|
Routing - MECHANICAL | 8/1/2018 | | 8/2/2018 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - PLANNING | 8/1/2018 | | 8/1/2018 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 8/1/2018 | | 8/1/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/1/2018 | | 8/1/2018 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/1/2018 | | DONE |
|
|
|
|
Intake Approval | | | 8/1/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/1/2018 | | DONE |
|
|
|
|
Intake Approval | | | 7/31/2018 | | FAIL |
|
|
|
Need Manual J's, plans are drawn to the 2012 Codes, we are now in the 2015 Codes for IRC, Energy as well as the 2017 Electric and Plumbing codes-the drawings need to reflect the current codes-please make sure the attic and crawl spaces are marked clearly
|
Intake Approval | | | 7/31/2018 | | FAIL |
|
|
|
still missing all items from first prescreen
|
Application received | | | 7/30/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 30 2018 11:51AM
|