Third Notice | | 4/16/2019 | 5/6/2019 | | DONE |
|
|
|
mailed 5-10-19 with third and final follow up letter
|
Third Follow up | | | 5/6/2019 | | DONE |
|
|
|
|
Third Notice | | 3/16/2019 | 4/11/2019 | | DONE |
|
|
|
mailed 4-12-19
|
Third Notice | | 2/12/2019 | 3/11/2019 | | DONE |
|
|
|
mailed 3-12 with second follow up
|
Second Follow up | | | 3/11/2019 | | DONE |
|
|
|
|
Third Notice | | 1/13/2019 | 2/7/2019 | | DONE |
|
|
|
mailed 2-11-19 with first follow up letter
|
First Follow up | | | 2/7/2019 | | DONE |
|
|
|
|
Third Notice | | 12/19/2018 | 1/8/2019 | | DONE |
|
|
|
mailed 1-11-19
|
Third Notice | | 11/12/2018 | 12/14/2018 | | DONE |
|
|
|
mailed 12-17
|
Second Notice | | 10/22/2018 | 11/7/2018 | | DONE |
|
|
|
mailed 11-12
|
First Notice | 9/19/2018 | 9/19/2018 | 10/12/2018 | | DONE |
Jim Sly
|
|
|
mailed 10-15-18
|
BLD-Conference | 9/4/2018 | 9/19/2018 | 9/19/2018 | A | DONE |
Jim Sly
|
|
|
Check back........
|
DOC - Permit Finaled | 9/19/2018 | 9/19/2018 | 9/19/2018 | P | PASS |
Jim Sly
|
|
|
Got Permit
|
BLD-Final | 9/6/2018 | 9/6/2018 | 9/6/2018 | P | PASS |
Jim Sly
|
|
|
call for access info // Matt Christensen Phone #: ###-####
|
FIRE-Final Inspection | 9/5/2018 | 9/5/2018 | 9/5/2018 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Owner to provide single action hardware on the new doors "note 13" prior to a building inspection.
|
FIRE-Final Inspection | 9/4/2018 | 9/5/2018 | 9/5/2018 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Owner to provide single action hardware on the new doors "note 13" prior to a building inspection.
call 15 mins ahead- Noah Phone #: ###-####
|
BLD-Other | 9/4/2018 | 9/4/2018 | 9/4/2018 | P | DONE |
Jim Sly
|
|
|
Inspections needed: Fire Life/Safety, Fire Alarm, Fire Sprinkler. Key is under the mat and inpection card inside building. Also, if problems accessing property you can call building owner, Noah at ###-#### or General, Matt, at ###-#### Phone #: ###-#### Inspection requested via web by Matthew Christensen Need plumbing permit and final. need Electrical final and all three fire finals.
|
FIRE-Final Inspection | 8/30/2018 | 8/31/2018 | 8/31/2018 | A | FAIL |
Troy Cobbley
|
|
|
Tried contact phone number but was not given option to leave messege. I went to job site but door is locked. No inspection performed.
Matt Phone #: ###-####
|
Override - Parcel Holds | | | 8/29/2018 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/29/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/29/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 8/27/2018 | | |
|
|
|
|
OVERRIDE | | | 8/27/2018 | | |
|
|
|
|
OVERRIDE | | | 8/27/2018 | | |
|
|
|
|
Route to Impact Fee Review | 8/25/2018 | 8/28/2018 | 8/27/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Plan assigned to (JG) | 8/21/2018 | 8/21/2018 | 8/27/2018 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 8/27 L1 Idaho Center for Itergrative Medicine ePlan*
|
Routing - PLAN CHECK | 8/27/2018 | | 8/27/2018 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/27/2018 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 8/27/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 8/27/2018 | | DONE |
|
|
|
NEED
GC form filled out by Silverbrook Construction
8-28-18-fees paid-still need GC form so called and left messge on phone
|
Routing - PLAN CHECK | 8/21/2018 | | 8/25/2018 | | FAIL |
Javier Guzman
|
|
|
|
1st review completed | | | 8/25/2018 | | FAIL |
Javier Guzman
|
|
|
|
Intake Approval | | | 8/21/2018 | | PASS |
Javier Guzman
|
|
|
|
Routing - Addressing | 8/21/2018 | | 8/21/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/21/2018 | | 8/21/2018 | | PASS |
Rachael Beierle
|
|
|
|
Application received | | | 7/31/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 31 2018 9:24AM
|
Intake Approval | | | 7/31/2018 | | FAIL |
Michael Hanson
|
|
|
This permit has failed prescreen due to the following:
1. Provide completed and signed 518 checklist.
2. Provide completed and signed 304 form.
3. Minimum sheets size is 18"x24".
4. Include building code analysis.
5. Provide vicinity map, key plan, and site plan
|