BLD-Final | 8/28/2018 | 8/31/2018 | 8/30/2018 | P | PASS |
Tony Young
|
|
|
Josh Phone #: ###-####
|
Permanent Occupancy | | | 8/30/2018 | | DONE |
|
|
|
|
Telephone call | | | 8/29/2018 | | DONE |
|
|
|
Joshua emailed me a floor plan-I forwarded to Brian McGowan to see how he wanted me to proceed.
|
Plan Reviewer's activity | | | 8/29/2018 | | DONE |
Brian McGowan
|
|
|
Joshua emailed me a modified floor plan showing a door that was not on the original floor plan accessing a toilet room from the hallway next to the Bride's Room. I uploaded this to Tidemark.
|
BLD-Final | 8/22/2018 | 8/28/2018 | 8/28/2018 | A | PART |
Tony Young
|
|
|
Josh Phone #: ###-####,, ok pending drawing as built approval from plan review
|
(F) Reprint permit | | | 8/28/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/28/2018 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 8/28/2018 | | DONE |
Brian McGowan
|
|
|
Sent email to Pastor Branham concerning the non-permited changes made to the building.
Pastor Branham,
If I am reading your plans correctly you relocated an exterior door to a meeting room and added an ADA ramp. Exterior changes require Design Review. This can be done at Staff Level with the proper applications filled out and submitted with the required documents.
The relocating of the door would have required a new header be installed and the existing location be filled in following the 2015 IBC requirements. The door, ramp, railing and landing that were installed would need to meet 2015 IBC requirements as well.
In order for this to be approved you will need to submit documents and plans showing compliance
|
BLD-Final | 8/14/2018 | 8/15/2018 | 8/15/2018 | A | FAIL |
Brandon Shaw
|
|
|
Exit corridors/pathways to remain unobstructed at all times... Electrical panels to be unobstructed at all times... Hot water heater/storage mezzanine, long term storage only... Replace Exit sign at bathroom/s hallway, North side of assembly area... ADA lift egress path to remain clear at all times... Submit revise plans, for review, showing door and direction of swing, at Bridal room bathroom...
|
FIRE-Final Inspection | 8/14/2018 | 8/14/2018 | 8/14/2018 | P | PASS |
Jim Page
|
|
|
No fire sprinkler modifications, no fire alarm modifications, fire extingushers are placed throughout with current inspection tags. Final life fire safety inspection complete.
Josh-call to meet Phone #: ###-####
|
Issue PAID IN FULL permit | | | 8/14/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/9/2018 | | DONE |
|
|
|
|
Telephone call | | | 8/9/2018 | | DONE |
|
|
|
called Joshua and left vm fee due and will need to schedule inspections when pick up permit.
|
Print Occupancy Form | | | 8/9/2018 | | DONE |
|
|
|
|
Plan assigned to (BJM) | 7/31/2018 | 7/31/2018 | 8/8/2018 | | DONE |
Brian McGowan
|
|
|
08/07 Occupancy
|
Routing - PLAN CHECK | 7/31/2018 | | 8/8/2018 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 8/8/2018 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 8/8/2018 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/8/2018 | | DONE |
Brian McGowan
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/31/2018 | | DONE |
|
|
|
|
Intake Approval | | | 7/31/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/31/2018 | | DONE |
|
|
|
|
First Notice | | 9/9/2018 | | | |
|
|
|
|
Application received | | 7/31/2018 | | | |
|
|
|
|