BLD-Final | 1/9/2019 | 1/10/2019 | 1/10/2019 | A | PASS |
Jim Sly
|
|
|
Call half hour before // Kurt Phone #: ###-####
|
DOC - Permit Finaled | 1/10/2019 | 1/10/2019 | 1/10/2019 | P | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 11/6/2018 | 11/7/2018 | 11/7/2018 | P | PASS |
Jim Sly
|
|
|
Curt Phone #: ###-####-changed inspection from am to pm cutomer will call inspector
|
BLD-Footing | 10/17/2018 | 10/17/2018 | 10/17/2018 | P | PASS |
Jim Sly
|
|
|
Kurt Phone #: ###-####
|
Issue PAID IN FULL permit | | | 10/4/2018 | | DONE |
|
|
|
|
(F) Reprint permit | | | 10/4/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 10/1/2018 | | |
|
|
|
|
Routing Walk-In (BLD) | 10/1/2018 | 10/1/2018 | 10/1/2018 | P | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 8/3/2018 | 8/3/2018 | 10/1/2018 | | PASS |
Josh Bogle
|
|
|
08/05 attached shop, paper - 1st done
|
Routing - PLAN CHECK | 10/1/2018 | | 10/1/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 10/1/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 10/1/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/1/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 10/1/2018 | | DONE |
|
|
|
Need RP
|
Routing Walk-In (BLD) | 8/3/2018 | 8/3/2018 | 8/3/2018 | P | FAIL |
Josh Bogle
|
|
|
took in as a level two pending more sturtural info from applicant
|
Routing - PLAN CHECK | 8/3/2018 | | 8/3/2018 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 8/3/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing Walk-In (Zoning) | 7/31/2018 | 7/31/2018 | 7/31/2018 | A | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 7/31/2018 | 7/31/2018 | 7/31/2018 | A | FAIL |
Josh Bogle
|
|
|
no contact with applicant
|
Application received | | 7/31/2018 | | | |
|
|
|
|