BLD-Final | 7/30/2019 | 7/31/2019 | 7/31/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
DOC - Permit Finaled | 7/31/2019 | 7/31/2019 | 7/31/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 7/30/2019 | 7/31/2019 | 7/31/2019 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 4.4
|
BLD-Energy code compliance | 5/29/2019 | 5/29/2019 | 5/29/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Energy code compliance | 5/28/2019 | 5/28/2019 | 5/29/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Energy code compliance | 5/24/2019 | 5/28/2019 | 5/28/2019 | A | NR |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 5/17/2019 | 5/23/2019 | 5/23/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Wall Bracing | 5/7/2019 | 5/8/2019 | 5/8/2019 | A | PASS |
Brandon Shaw
|
|
|
shear // joreh Phone #: ###-####
|
Routing - MECHANICAL | 3/29/2019 | | 3/29/2019 | | PASS |
Troy James
|
|
|
Resubmitted manual j
|
BLD-Foundation | 12/21/2018 | 12/21/2018 | 12/21/2018 | P | PASS |
Dave Hannah
|
|
|
Victor Phone #: ###-####
|
BLD-Footing | 12/20/2018 | 12/20/2018 | 12/20/2018 | P | PASS |
Jim Storey
|
|
|
Manny Phone #: ###-####
|
PubWorks Subgrade Approval | 12/19/2018 | 12/19/2018 | 12/19/2018 | | DONE |
Melissa Jannusch
|
|
|
ALL A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
OVERRIDE | | | 10/18/2018 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/18/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/18/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/18/2018 | | DONE |
|
|
|
DO NOT RE-ISSUE - All requirements met for plan mod
|
Plan assigned to (M_H) | 10/4/2018 | | 10/17/2018 | | DONE |
Michael Hanson
|
|
|
10/17 plan mod
|
Routing - PLAN CHECK | 10/17/2018 | | 10/17/2018 | | PASS |
Michael Hanson
|
|
|
Plan modification - 2 hour plan review fee. MDH
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/17/2018 | | DONE |
Michael Hanson
|
|
|
Plan modification - 2 hour plan review fee. MDH
|
Plan Modification Accepted | | | 10/4/2018 | | DONE |
|
|
|
plan mod-changing slab on grade to a crawl space-sheets 0.0, 1.0, 2.0, 3.0, 4.0 & 4.1
|
Issue PAID IN FULL permit | | | 9/10/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/10/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 9/7/2018 | | |
|
|
|
|
Plan assigned to (M_H) | 8/6/2018 | | 9/7/2018 | | DONE |
Michael Hanson
|
|
|
08/23 sfd L2 ePlan. 1st review completed - Failed Planning and Fire review. MDH
|
Routing - PLAN CHECK | 9/7/2018 | | 9/7/2018 | | PASS |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/7/2018 | | DONE |
Michael Hanson
|
|
|
|
Override - Parcel Holds | | | 9/7/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 9/7/2018 | | DONE |
|
|
|
All requirements met
|
Routing - FIRE | 9/6/2018 | 9/6/2018 | 9/6/2018 | | PASS |
Tim Frost
|
|
|
|
Routing - PLANNING | 8/29/2018 | | 8/29/2018 | | PASS |
Sue Cummings
|
|
|
Setback issue resolved
|
Routing PW Grading-Hillside | 8/8/2018 | | 8/17/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
1st review completed | | | 8/17/2018 | | FAIL |
Michael Hanson
|
|
|
Failed Planning and Fire review. MDH
|
Routing - PLAN CHECK | 8/6/2018 | | 8/17/2018 | | FAIL |
Michael Hanson
|
|
|
Failed Planning and Fire review. MDH
|
Route to Impact Fee Review | 8/6/2018 | 8/9/2018 | 8/7/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 8/6/2018 | 8/6/2018 | 8/7/2018 | | FAIL |
Tim Frost
|
|
|
8/17 New SFH ePlan
Fire Flow information is required.
Emailed contractor failed review.
|
Routing - MECHANICAL | 8/6/2018 | | 8/7/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 8/6/2018 | | 8/6/2018 | | FAIL |
Sue Cummings
|
|
|
Parking requires 20 ft. in front setback
|
Routing - Addressing | 8/6/2018 | | 8/6/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/6/2018 | | 8/6/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 8/6/2018 | | 8/6/2018 | | PASS |
Michael Zawacki
|
|
|
General permit
|
Plans ACCEPTED BY PLAN TECH | | | 8/6/2018 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 8/6/2018 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/6/2018 | | DONE |
|
|
|
|
Intake Approval | | | 8/6/2018 | | PASS |
|
|
|
|
Application received | | | 7/31/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 31 2018 1:43PM
|