Permit NumberBLD18-02728
StatusFinaled
Name BLACKROCK HOMES LLC
Site Address 2514 E WARM SPRINGS AVE
Project NameWestcott A
Customer Number 
ePlanReviewYes
Description
Plan mod - changed to crawlspace and smaller 2nd level floor joist MDH ***Passes using UA tradeoff energy approach***WUI Zone A requirements*** Permit for the construction of a new 2,518 sq. ft., two story (first story 1,911 sq. ft., second story 607 sq. ft.) single family dwelling with 3 bedrooms, 3 and a half bathrooms, approximately 69 sq. ft. of covered patio/porch and a 702 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. MDH
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/30/20197/31/20197/31/2019APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Clint Wall
DOC - Permit Finaled7/31/20197/31/20197/31/2019PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results7/30/20197/31/20197/31/2019ADONE
DetailsBrandon Shaw
ACH50- 4.4
BLD-Energy code compliance5/29/20195/29/20195/29/2019APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Energy code compliance5/28/20195/28/20195/29/2019PPASS
DetailsBrandon Shaw
BLD-Energy code compliance5/24/20195/28/20195/28/2019ANR
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Framing/Rough-in5/17/20195/23/20195/23/2019APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Wall Bracing5/7/20195/8/20195/8/2019APASS
DetailsBrandon Shaw
shear // joreh Phone #: ###-####
Routing - MECHANICAL3/29/2019 3/29/2019 PASS
DetailsTroy James
Resubmitted manual j
BLD-Foundation12/21/201812/21/201812/21/2018PPASS
DetailsDave Hannah
Victor Phone #: ###-####
BLD-Footing12/20/201812/20/201812/20/2018PPASS
DetailsJim Storey
Manny Phone #: ###-####
PubWorks Subgrade Approval12/19/201812/19/201812/19/2018 DONE
DetailsMelissa Jannusch
ALL A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

OVERRIDE  10/18/2018  
CHANGE STATUS TO (ISS)  10/18/2018 DONE
Inspection Record Card- Bld  10/18/2018 DONE
Permit Ready to Issue  10/18/2018 DONE
DO NOT RE-ISSUE - All requirements met for plan mod
Plan assigned to (M_H)10/4/2018 10/17/2018 DONE
DetailsMichael Hanson
10/17 plan mod
Routing - PLAN CHECK10/17/2018 10/17/2018 PASS
DetailsMichael Hanson
Plan modification - 2 hour plan review fee. MDH
PLANS/APPL TAKEN TO FRONT DESK  10/17/2018 DONE
DetailsMichael Hanson
Plan modification - 2 hour plan review fee. MDH
Plan Modification Accepted  10/4/2018 DONE
plan mod-changing slab on grade to a crawl space-sheets 0.0, 1.0, 2.0, 3.0, 4.0 & 4.1
Issue PAID IN FULL permit  9/10/2018 DONE
Inspection Record Card- Bld  9/10/2018 DONE
OVERRIDE  9/7/2018  
Plan assigned to (M_H)8/6/2018 9/7/2018 DONE
DetailsMichael Hanson
08/23 sfd L2 ePlan. 1st review completed - Failed Planning and Fire review. MDH
Routing - PLAN CHECK9/7/2018 9/7/2018 PASS
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  9/7/2018 DONE
DetailsMichael Hanson
Override - Parcel Holds  9/7/2018  
Permit Ready to Issue  9/7/2018 DONE
All requirements met
Routing - FIRE9/6/20189/6/20189/6/2018 PASS
DetailsTim Frost
Routing - PLANNING8/29/2018 8/29/2018 PASS
DetailsSue Cummings
Setback issue resolved
Routing PW Grading-Hillside8/8/2018 8/17/2018 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
1st review completed  8/17/2018 FAIL
DetailsMichael Hanson
Failed Planning and Fire review. MDH
Routing - PLAN CHECK8/6/2018 8/17/2018 FAIL
DetailsMichael Hanson
Failed Planning and Fire review. MDH
Route to Impact Fee Review8/6/20188/9/20188/7/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - FIRE8/6/20188/6/20188/7/2018 FAIL
DetailsTim Frost
8/17 New SFH ePlan
Fire Flow information is required.
Emailed contractor failed review.
Routing - MECHANICAL8/6/2018 8/7/2018 PASS
DetailsTroy James
Routing - PLANNING8/6/2018 8/6/2018 FAIL
DetailsSue Cummings
Parking requires 20 ft. in front setback
Routing - Addressing8/6/2018 8/6/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS8/6/2018 8/6/2018 PASS
DetailsRachael Beierle
Routing - Erosion and Sediment8/6/2018 8/6/2018 PASS
DetailsMichael Zawacki
General permit
Plans ACCEPTED BY PLAN TECH  8/6/2018 DONE
Override - Parcel Holds  8/6/2018  
Recd Pcfee & Taken To Pln CK  8/6/2018 DONE
Intake Approval  8/6/2018 PASS
Application received  7/31/2018 DONE
Application submitted via PDS Online on Jul 31 2018 1:43PM