BLD-Final | 6/25/2019 | 6/26/2019 | 6/26/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
DOC - Permit Finaled | 6/26/2019 | 6/26/2019 | 6/26/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 6/25/2019 | 6/26/2019 | 6/26/2019 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 3.6
|
BLD-Energy code compliance | 4/17/2019 | 4/23/2019 | 4/23/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 4/18/2019 | 4/19/2019 | 4/19/2019 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 4/17/2019 | 4/19/2019 | 4/18/2019 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall Inspection cancelled from web by: Clint Wall
|
BLD-Wall Bracing | 4/3/2019 | 4/4/2019 | 4/4/2019 | A | PASS |
Dave Hannah
|
|
|
Rudy Phone #: ###-####
|
BLD-Foundation | 12/10/2018 | 12/10/2018 | 12/10/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress... Frost protection is required...
|
BLD-Footing | 11/29/2018 | 11/30/2018 | 11/30/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
|
PubWorks Subgrade Approval | 11/27/2018 | 11/27/2018 | 11/27/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 10/12/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/12/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 10/10/2018 | | |
|
|
|
|
Plan assigned to (RDP) | 10/8/2018 | 10/8/2018 | 10/10/2018 | | DONE |
Rob Patrick
|
|
|
10/9 Failed; Routed back to Mechanical for new Manual J
|
Routing - PLAN CHECK | 10/10/2018 | | 10/10/2018 | | PASS |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 10/10/2018 | | |
|
|
|
per Rob Patrick-no plan mod/resubmittal fee due
|
Routing - PLAN CHECK | 10/8/2018 | | 10/9/2018 | | FAIL |
Rob Patrick
|
|
|
Routed back to Troy for new Manual J
|
Routing - MECHANICAL | 10/9/2018 | | 10/9/2018 | | PASS |
Troy James
|
|
|
|
Plan Modification Accepted | | | 10/4/2018 | | DONE |
|
|
|
plan mod was before permit was issued but in ready status-changing slab on grade to a crawl space-sheets 0.0, 1.0, 2.0, 3.0, 4.0 & 4.1
|
OVERRIDE | | | 9/27/2018 | | |
|
|
|
|
Plan assigned to (RDP) | 8/1/2018 | 8/1/2018 | 9/27/2018 | | DONE |
Rob Patrick
|
|
|
08/20 sfd L2 ePlan...Need to Fail for not addressing comments...9/6; Failed needs corrections
|
Routing - PLANNING | 9/27/2018 | | 9/27/2018 | | PASS |
Sue Cummings
|
|
|
Parking issue solve by mod of the PUD. O.K. now ...see eave redlines
|
Routing - PLAN CHECK | 9/27/2018 | | 9/27/2018 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/27/2018 | | DONE |
Rob Patrick
|
|
|
|
Override - Parcel Holds | | | 9/27/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 9/27/2018 | | DONE |
|
|
|
|
Routing - FIRE | 9/6/2018 | 9/6/2018 | 9/6/2018 | | PASS |
Tim Frost
|
|
|
|
Routing - PLAN CHECK | 9/6/2018 | | 9/6/2018 | | FAIL |
Rob Patrick
|
|
|
Corrections Required
|
Routing - FIRE | 8/9/2018 | 8/9/2018 | 8/15/2018 | | FAIL |
Tim Frost
|
|
|
New SFH
Failed per building code plan reviewers request.
|
1st review completed | | | 8/14/2018 | | FAIL |
Rob Patrick
|
|
|
|
Routing - PLAN CHECK | 8/1/2018 | | 8/14/2018 | | FAIL |
Rob Patrick
|
|
|
8/14 Failed for possible re-design due to estback issue
|
Route to Impact Fee Review | 8/1/2018 | 8/4/2018 | 8/2/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 8/1/2018 | | 8/2/2018 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - PLANNING | 8/1/2018 | | 8/1/2018 | | FAIL |
Sue Cummings
|
|
|
Rear yard setback is 20 ft. for parking
|
Routing - Addressing | 8/1/2018 | | 8/1/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/1/2018 | | 8/1/2018 | | PASS |
Morgan Webb
|
|
|
Address is not in hillside, see parcel tag
|
Plans ACCEPTED BY PLAN TECH | | | 8/1/2018 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 8/1/2018 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/1/2018 | | DONE |
|
|
|
|
Intake Approval | | | 8/1/2018 | | PASS |
|
|
|
|
Application received | | | 7/31/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 31 2018 1:48PM
|