BLD-Final | 6/24/2019 | 6/24/2019 | 6/24/2019 | A | PASS |
Dave Hannah
|
|
|
Inspection requested via web by Clint Wall
|
DOC - Permit Finaled | 6/24/2019 | 6/24/2019 | 6/24/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Blower Door Test Results | 6/24/2019 | 6/24/2019 | 6/24/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall 4.7
|
BLD-Energy code compliance | 4/17/2019 | 4/19/2019 | 4/19/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 4/16/2019 | 4/17/2019 | 4/17/2019 | A | PASS |
Brandon Shaw
|
|
|
OK to insulate...
|
BLD-Other | 4/1/2019 | 4/1/2019 | 4/1/2019 | P | PASS |
Brandon Shaw
|
|
|
Soffit
|
BLD-Wall Bracing | 4/1/2019 | 4/1/2019 | 4/1/2019 | P | PASS |
Brandon Shaw
|
|
|
Jorge Phone #: ###-####
|
BLD-Footing | 11/1/2018 | 11/1/2018 | 11/1/2018 | P | PASS |
Jim Storey
|
|
|
Matt Phone #: ###-####
|
PubWorks Subgrade Approval | 11/1/2018 | 11/1/2018 | 11/1/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. A footing inspection may now be scheduled with the Building Department.
|
Issue PAID IN FULL permit | | | 10/18/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/18/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 10/17/2018 | | |
|
|
|
|
Plan assigned to (RDP) | 10/4/2018 | 10/4/2018 | 10/17/2018 | | DONE |
Rob Patrick
|
|
|
10/5 FAILED PLAN MOD: Need W.U.I. reqmnts shown
|
Routing - MECHANICAL | 10/17/2018 | | 10/17/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 10/17/2018 | | 10/17/2018 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/17/2018 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 10/17/2018 | | DONE |
|
|
|
met
|
Routing - PLAN CHECK | 10/5/2018 | | 10/5/2018 | | FAIL |
Rob Patrick
|
|
|
Plan Mod Fail: Need to provide W.U.I. requirements
|
Plan Modification Accepted | | | 10/4/2018 | | DONE |
|
|
|
plan mod was before permit was issued but in ready status-changing slab on grade to a crawl space-sheets 0.0, 1.0, 2.0, 3.0, 4.0 & 4.1
|
OVERRIDE | | | 9/27/2018 | | |
|
|
|
|
Plan assigned to (RDP) | 8/1/2018 | 8/1/2018 | 9/27/2018 | | DONE |
Rob Patrick
|
|
|
08/20 sfd L2 ePlan...8/30 Failed for corrections and Appeal time table...9/6: Failed for corrections
|
Routing - PLANNING | 9/27/2018 | | 9/27/2018 | | PASS |
Sue Cummings
|
|
|
Parking issue solved with PUD mod O.K. now
|
Routing - PLAN CHECK | 9/27/2018 | | 9/27/2018 | | PASS |
Rob Patrick
|
|
|
|
Override - Parcel Holds | | | 9/27/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 9/27/2018 | | DONE |
|
|
|
|
Routing - FIRE | 9/6/2018 | 9/6/2018 | 9/6/2018 | | PASS |
Tim Frost
|
|
|
|
Routing - PLAN CHECK | 9/6/2018 | | 9/6/2018 | | FAIL |
Rob Patrick
|
|
|
Corrections Required
|
Routing - FIRE | 8/10/2018 | 8/10/2018 | 8/15/2018 | | FAIL |
Tim Frost
|
|
|
New SFH
Failed per building code plan reviewers request.
|
1st review completed | | | 8/14/2018 | | FAIL |
Rob Patrick
|
|
|
|
Routing - PLAN CHECK | 8/1/2018 | | 8/14/2018 | | FAIL |
Rob Patrick
|
|
|
Failed for possible re-design due to setback issue
|
Routing - MECHANICAL | 8/1/2018 | | 8/6/2018 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 8/1/2018 | 8/4/2018 | 8/2/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Plans ACCEPTED BY PLAN TECH | | | 8/1/2018 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 8/1/2018 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/1/2018 | | DONE |
|
|
|
|
Intake Approval | | | 8/1/2018 | | PASS |
|
|
|
|
Routing - Addressing | 8/1/2018 | | 8/1/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/1/2018 | | 8/1/2018 | | PASS |
Morgan Webb
|
|
|
Address is not in hillside, see parcel tag
|
Application received | | | 7/31/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 31 2018 1:54PM
|
Routing - PLANNING | 8/1/2018 | | | | FAIL |
|
|
|
Rear setback is 20 ft. for parking
|