BLD-Blower Door Test Results | 3/23/2019 | 3/26/2019 | 3/26/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall 5.1
|
BLD-Final | 3/23/2019 | 3/26/2019 | 3/26/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
DOC - Permit Finaled | 3/26/2019 | 3/26/2019 | 3/26/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 1/17/2019 | 1/22/2019 | 1/22/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 1/14/2019 | 1/17/2019 | 1/17/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall c/n on site
|
BLD-Wall Bracing | 1/8/2019 | 1/8/2019 | 1/8/2019 | P | PASS |
Dave Hannah
|
|
|
Rudy Phone #: ###-####
|
BLD-Foundation | 10/15/2018 | 10/15/2018 | 10/15/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 10/12/2018 | 10/12/2018 | 10/12/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
PubWorks Subgrade Approval | 10/12/2018 | 10/12/2018 | 10/12/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 10/2/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/2/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 10/1/2018 | | |
|
|
|
|
Routing - FIRE | 10/1/2018 | 10/1/2018 | 10/1/2018 | | PASS |
Erika Akin
|
|
|
New SFH 3394 fire flow area, 1000 gpm available. Hydrant proximity, access and WUI checked.
|
Plan assigned to (RDP) | 8/1/2018 | 8/1/2018 | 10/1/2018 | | DONE |
Rob Patrick
|
|
|
08/20 sfd L2 ePlan...8/14 Failed for possible re-design due to setbach issue
|
Routing - PLANNING | 10/1/2018 | | 10/1/2018 | | PASS |
Sue Cummings
|
|
|
Parking issue solved with PUD mod.
|
Routing - PLAN CHECK | 10/1/2018 | | 10/1/2018 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/1/2018 | | DONE |
Rob Patrick
|
|
|
|
Override - Parcel Holds | | | 10/1/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 10/1/2018 | | DONE |
|
|
|
met
|
Routing - FIRE | 8/10/2018 | 8/10/2018 | 8/15/2018 | | FAIL |
Tim Frost
|
|
|
New SFH
Failed per building code plan reviewers request.
|
1st review completed | | | 8/14/2018 | | FAIL |
Rob Patrick
|
|
|
|
Routing - PLAN CHECK | 8/1/2018 | | 8/14/2018 | | FAIL |
Rob Patrick
|
|
|
Failed for possible re-design due to setback issue
|
Route to Impact Fee Review | 8/1/2018 | 8/4/2018 | 8/2/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 8/1/2018 | | 8/2/2018 | | PASS |
Chad Schwendiman
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/1/2018 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 8/1/2018 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/1/2018 | | DONE |
|
|
|
|
Intake Approval | | | 8/1/2018 | | PASS |
|
|
|
|
Routing - Addressing | 8/1/2018 | | 8/1/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/1/2018 | | 8/1/2018 | | PASS |
Morgan Webb
|
|
|
Address is not in hillside, see parcel tag
|
Application received | | | 7/31/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 31 2018 2:29PM
|
Routing - PLANNING | 8/1/2018 | | | | FAIL |
|
|
|
Rear setback is 20 ft. for parking.
|