Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD18-02732
StatusFinaled
Name BLACKROCK HOMES LLC
Site Address 2522 E WARM SPRINGS AVE
Project NameRobie B
Customer Number 
ePlanReviewYes
Description
W.U.I. Zone A, Class A Roof Required. Permit for the construction of a new 2,485 sq. ft., two story (first story 1,683 sq. ft., second story 802 sq. ft.) single family dwelling with 3 bedrooms, 2 and a half bathrooms, approximately 117 sq. ft. of covered patio/porch and a 792 sq. ft. attached garage per the approved plans and any notations. Rescheck Energy Compliance. R-1C zoning and setbacks per planning. ***RDP*** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Blower Door Test Results3/23/20193/26/20193/26/2019APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Clint Wall 5.1
BLD-Final3/23/20193/26/20193/26/2019APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Clint Wall
DOC - Permit Finaled3/26/20193/26/20193/26/2019PPASS
DetailsDave Hannah
BLD-Energy code compliance1/17/20191/22/20191/22/2019APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Framing/Rough-in1/14/20191/17/20191/17/2019APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Clint Wall c/n on site
BLD-Wall Bracing1/8/20191/8/20191/8/2019PPASS
DetailsDave Hannah
Rudy Phone #: ###-####
BLD-Foundation10/15/201810/15/201810/15/2018PPASS
DetailsBrandon Shaw
Work in progress
BLD-Footing10/12/201810/12/201810/12/2018PPASS
DetailsBrandon Shaw
Work in progress
PubWorks Subgrade Approval10/12/201810/12/201810/12/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
Issue PAID IN FULL permit  10/2/2018 DONE
Inspection Record Card- Bld  10/2/2018 DONE
OVERRIDE  10/1/2018  
Routing - FIRE10/1/201810/1/201810/1/2018 PASS
DetailsErika Akin
New SFH 3394 fire flow area, 1000 gpm available. Hydrant proximity, access and WUI checked.
Plan assigned to (RDP)8/1/20188/1/201810/1/2018 DONE
DetailsRob Patrick
08/20 sfd L2 ePlan...8/14 Failed for possible re-design due to setbach issue
Routing - PLANNING10/1/2018 10/1/2018 PASS
DetailsSue Cummings
Parking issue solved with PUD mod.
Routing - PLAN CHECK10/1/2018 10/1/2018 PASS
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  10/1/2018 DONE
DetailsRob Patrick
Override - Parcel Holds  10/1/2018  
Permit Ready to Issue  10/1/2018 DONE
met
Routing - FIRE8/10/20188/10/20188/15/2018 FAIL
DetailsTim Frost
New SFH
Failed per building code plan reviewers request.
1st review completed  8/14/2018 FAIL
DetailsRob Patrick
Routing - PLAN CHECK8/1/2018 8/14/2018 FAIL
DetailsRob Patrick
Failed for possible re-design due to setback issue
Route to Impact Fee Review8/1/20188/4/20188/2/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - MECHANICAL8/1/2018 8/2/2018 PASS
DetailsChad Schwendiman
Plans ACCEPTED BY PLAN TECH  8/1/2018 DONE
Override - Parcel Holds  8/1/2018  
Recd Pcfee & Taken To Pln CK  8/1/2018 DONE
Intake Approval  8/1/2018 PASS
Routing - Addressing8/1/2018 8/1/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS8/1/2018 8/1/2018 PASS
DetailsMorgan Webb
Address is not in hillside, see parcel tag
Application received  7/31/2018 DONE
Application submitted via PDS Online on Jul 31 2018 2:29PM
Routing - PLANNING8/1/2018   FAIL
Rear setback is 20 ft. for parking.