BLD-Final | 2/7/2020 | 2/10/2020 | 2/10/2020 | A | DONE |
Tony Young
|
|
|
James Phone #: ###-####/// prior correction ok,, c of o issued
|
DOC - Permit Finaled | 2/10/2020 | 2/10/2020 | 2/10/2020 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 2/4/2020 | 2/5/2020 | 2/6/2020 | A | FAIL |
Brandon Shaw
|
|
|
R311.7.5.1 Riser- open risers... does not permit passage of a 4" sphere... R311.7.5.2 Treads- greatest traeddepth... shall not exceed 3/8"...
|
PubWorks Occupancy Approval | 1/28/2020 | 1/28/2020 | 1/28/2020 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Aging Inspection | 11/19/2019 | 11/19/2019 | 11/19/2019 | | DEFR |
Brandon Shaw
|
|
|
Work in progress...
|
Extend Permit 90/180 days | 11/19/2019 | 11/19/2019 | 11/19/2019 | A | DONE |
Brandon Shaw
|
|
|
|
BLD-Framing/Rough-in | 7/8/2019 | 7/8/2019 | 7/8/2019 | P | PASS |
Brandon Shaw
|
|
|
Corrections SAT... OK to cover...
|
BLD-Energy code compliance | 7/3/2019 | 7/5/2019 | 7/5/2019 | A | FAIL |
Brandon Shaw
|
|
|
See FIR19-00321 - Do Not Cover...
|
BLD-Framing/Rough-in | 7/2/2019 | 7/2/2019 | 7/2/2019 | P | PART |
Brandon Shaw
|
|
|
Verify Strong Wall (North East side, Garage) anchoring... As per walk through- fire block furred basement wall and landings...
|
BLD-Framing/Rough-in | 6/28/2019 | 7/1/2019 | 7/1/2019 | P | FAIL |
Brandon Shaw
|
|
|
Need Fire corrections... No framing inspection...
|
BLD-Framing/Rough-in | 6/28/2019 | 6/28/2019 | 6/28/2019 | P | NR |
Tony Young
|
|
|
James Phone #: ###-####,, need trades
|
BLD-Framing/Rough-in | 6/25/2019 | 6/26/2019 | 6/26/2019 | A | NR |
Tony Young
|
|
|
James Phone #: ###-####,, needs trades 1st,, conf. walk through,, 1st part of soffits work in progress
|
Routing - MECHANICAL | 6/25/2019 | | 6/25/2019 | | PASS |
Troy James
|
|
|
Resubmitted manual j report
|
BLD-Wall Bracing | 6/11/2019 | 6/11/2019 | 6/11/2019 | P | CANC |
Tony Young
|
|
|
canceled per James // shear // James Phone #: ###-####
|
BLD-Wall Bracing | 5/3/2019 | 5/6/2019 | 5/6/2019 | A | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Wall Bracing | 2/4/2019 | 2/5/2019 | 2/5/2019 | A | PART |
Tony Young
|
|
|
STem wall // Dan Phone #: ###-####,, they are wanting a foundation,, work in progress,, I am requesting that they provide a 3rd party special inspector on site to review due to the complexity of the project
|
BLD-Footing | 1/2/2019 | 1/4/2019 | 1/4/2019 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Arrow Tallman
|
BLD-Footing | 1/2/2019 | 1/2/2019 | 1/2/2019 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Arrow Tallman late afternoon,, work in progress
|
BLD-Footing | 12/27/2018 | 1/2/2019 | 1/2/2019 | A | NR |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Arrow Tallman
|
BLD-Footing | 12/27/2018 | 12/28/2018 | 12/31/2018 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Arrow Tallman,, work in progress
|
BLD-Footing | 12/26/2018 | 12/27/2018 | 12/27/2018 | A | NR |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Arrow Tallman,, work in progress,, still needing public works approval
|
PubWorks Subgrade Approval | 12/27/2018 | 12/27/2018 | 12/27/2018 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 12/21/2018 | 12/26/2018 | 12/26/2018 | P | PEND |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Arrow Tallman,, work in progress,, needs final soils approval from public works,,
|
BLD-Footing | 12/20/2018 | 12/21/2018 | 12/20/2018 | A | CANC |
Tony Young
|
|
|
Phone #: ###-#### >> Inspection requested via web by Arrow Tallman Inspection cancelled from web by: Arrow Tallman
|
Issue PAID IN FULL permit | | | 11/5/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/5/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 11/1/2018 | | |
|
|
|
|
Meeting | | | 11/1/2018 | | DONE |
|
|
|
emailed GC to inform them not all fees were paid.
|
Permit Ready to Issue | | | 11/1/2018 | | DONE |
|
|
|
NEED RP- all met
|
Routing - FIRE | 10/31/2018 | 10/31/2018 | 10/31/2018 | | PASS |
Tim Frost
|
|
|
See attached review
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/31/2018 | | DONE |
Michael Hanson
|
|
|
|
Plan assigned to (M_H) | 10/25/2018 | | 10/31/2018 | | DONE |
Michael Hanson
|
|
|
10/11 sfd L2 ePlan...10/15 Failed; Corrections Needed RDP
|
Routing - PLAN CHECK | 10/30/2018 | | 10/30/2018 | | PASS |
Michael Hanson
|
|
|
|
Routing - PLANNING | 10/30/2018 | | 10/30/2018 | | PASS |
Nicolette Womack
|
|
|
|
Routing PW Grading-Hillside | 10/26/2018 | | 10/26/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call ###-#### to schedule an inspection.
All disturbed slopes included in the construction of this project must be stabilized and approved by Public Works before a Final Occupancy Permit is granted. If weather conditions prohibit revegetation and stabilization activities, the contractor shall provide a bond/surety agreement or an irrevocable letter of credit in the amount of 110% of the cost estimated by the project engineer to enable stabilization of the site. Call ###-#### for an inspection.
|
Plan assigned to (RDP) | 9/24/2018 | 9/24/2018 | 10/25/2018 | | DEFR |
Rob Patrick
|
|
|
10/11 sfd L2 ePlan...10/15 Failed; Corrections Needed
|
Routing - MECHANICAL | 10/25/2018 | | 10/25/2018 | | PASS |
Troy James
|
|
|
Need task to complete mechanical review.
|
Routing - PLAN CHECK | 9/24/2018 | | 10/15/2018 | | FAIL |
Rob Patrick
|
|
|
Corrections Needed
|
1st review completed | | | 10/15/2018 | | FAIL |
Rob Patrick
|
|
|
Corrections Needed
|
Routing PW Grading-Hillside | 9/24/2018 | | 10/5/2018 | | FAIL |
Melissa Jannusch
|
|
|
See changemarks in ePlan
|
Routing - FIRE | 9/24/2018 | 9/24/2018 | 10/3/2018 | | FAIL |
Tim Frost
|
|
|
New SFH
|
Routing - MECHANICAL | 9/24/2018 | | 9/26/2018 | | FAIL |
Troy James
|
|
|
Emailed corrections to air comfort zone
|
Routing - PLANNING | 9/24/2018 | | 9/26/2018 | | FAIL |
Nicolette Womack
|
|
|
Retaining Walls cannot exceed 6' in exposed height in side yard setback. Railings included. Site Plan Missing.
|
Route to Impact Fee Review | 9/24/2018 | 9/27/2018 | 9/25/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 9/24/2018 | | 9/25/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - Erosion and Sediment | 9/24/2018 | | 9/25/2018 | | PASS |
Michael Zawacki
|
|
|
Foothills lot, site prep inspection required.
|
Routing - PUBLIC WORKS | 9/24/2018 | | 9/24/2018 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/24/2018 | | DONE |
|
|
|
|
Intake Approval | | | 9/24/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/24/2018 | | DONE |
|
|
|
|
Intake Approval | | | 9/21/2018 | | FAIL |
|
|
|
CAT II need to apply for CFH
|
Application received | | | 7/31/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 31 2018 2:30PM
|