BLD-Final | 4/30/2019 | 5/1/2019 | 5/1/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
DOC - Permit Finaled | 5/1/2019 | 5/1/2019 | 5/1/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 4/30/2019 | 5/1/2019 | 5/1/2019 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 5
|
BLD-Energy code compliance | 2/14/2019 | 2/19/2019 | 2/19/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 2/11/2019 | 2/14/2019 | 2/15/2019 | A | PASS |
Brandon Shaw
|
|
|
Per plans- A34 clips to be installed to double top plate, two location... Cocealed space up stairs bonus room- need to fire block ceiling... OK to insulate...
|
BLD-Other | 2/1/2019 | 2/1/2019 | 2/1/2019 | P | PASS |
Brandon Shaw
|
|
|
Soffits
|
BLD-Wall Bracing | 1/30/2019 | 1/30/2019 | 1/30/2019 | P | PASS |
Dave Hannah
|
|
|
Jorge Phone #: ###-####
|
BLD-Foundation | 11/5/2018 | 11/6/2018 | 11/6/2018 | A | PASS |
Dave Hannah
|
|
|
Ryan Phone #: ###-####
|
BLD-Footing | 11/2/2018 | 11/2/2018 | 11/2/2018 | P | PASS |
Dave Hannah
|
|
|
Ryan Phone #: ###-####
|
BLD-Footing | 11/1/2018 | 11/1/2018 | 11/1/2018 | P | NR |
Jim Storey
|
|
|
Ryan Phone #: ###-####
|
PubWorks Subgrade Approval | 11/1/2018 | 11/1/2018 | 11/1/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. A footing inspection may now be scheduled with the Building Department.
|
Issue PAID IN FULL permit | | | 10/18/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/18/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 10/17/2018 | | |
|
|
|
|
Plan assigned to (RDP) | 10/5/2018 | 10/5/2018 | 10/17/2018 | | DONE |
Rob Patrick
|
|
|
Plan Mod...Ready to Issue, waiting on Mechanical for Manual J
|
Routing - MECHANICAL | 10/11/2018 | | 10/17/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 10/17/2018 | | 10/17/2018 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/17/2018 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 10/17/2018 | | DONE |
|
|
|
met
|
Plan assigned to (M_H) | 10/4/2018 | | 10/5/2018 | | DONE |
Michael Hanson
|
|
|
Plan mod - Originally completed by RDP. MDH
|
Plan Modification Accepted | | | 10/4/2018 | | DONE |
|
|
|
plan mod was before permit was issued but in ready status-changing slab on grade to a crawl space-sheets 0.0, 1.0, 2.0, 3.0, 4.0 & 4.1
|
OVERRIDE | | | 10/1/2018 | | |
|
|
|
|
Routing - FIRE | 10/1/2018 | 10/1/2018 | 10/1/2018 | | PASS |
Erika Akin
|
|
|
New SFH 3380 fire flow area, 1000 gpm available. Hydrant proximity, access and WUI checked.
|
Plan assigned to (RDP) | 8/1/2018 | 8/1/2018 | 10/1/2018 | | DONE |
Rob Patrick
|
|
|
08/20 sfd L2 ePlan...8/14 Failed for possible re-design due to setback issue
|
Routing - PLAN CHECK | 10/1/2018 | | 10/1/2018 | | PASS |
Rob Patrick
|
|
|
|
Override - Parcel Holds | | | 10/1/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 10/1/2018 | | DONE |
|
|
|
met
|
Routing - PLANNING | 9/24/2018 | | 9/24/2018 | | PASS |
Sue Cummings
|
|
|
Rear estback issue rixed with PUD mod. O.K. now
|
Routing - FIRE | 8/10/2018 | 8/10/2018 | 8/15/2018 | | FAIL |
Tim Frost
|
|
|
New SFH
Failed per building code plan reviewers request.
|
1st review completed | | | 8/14/2018 | | FAIL |
Rob Patrick
|
|
|
|
Routing - PLAN CHECK | 8/1/2018 | | 8/14/2018 | | FAIL |
Rob Patrick
|
|
|
8/14 Failed for possible re-design due to setback issue
|
Routing - MECHANICAL | 8/1/2018 | | 8/6/2018 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 8/1/2018 | 8/4/2018 | 8/2/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 8/1/2018 | | 8/1/2018 | | FAIL |
Sue Cummings
|
|
|
Rear setback is 20 ft. for parking
|
Routing - Addressing | 8/1/2018 | | 8/1/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/1/2018 | | 8/1/2018 | | PASS |
Morgan Webb
|
|
|
Address is not in hillside, see parcel tag
|
Plans ACCEPTED BY PLAN TECH | | | 8/1/2018 | | DONE |
|
|
|
|
Intake Approval | | | 8/1/2018 | | PASS |
|
|
|
|
Application received | | | 7/31/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 31 2018 2:49PM
|