BLD-Final | 1/23/2020 | 1/24/2020 | 1/24/2020 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
DOC - Permit Finaled | 1/24/2020 | 1/24/2020 | 1/24/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 1/23/2020 | 1/24/2020 | 1/24/2020 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 4.3
|
BLD-Final | 1/21/2020 | 1/23/2020 | 1/23/2020 | A | NR |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Blower Door Test Results | 1/21/2020 | 1/23/2020 | 1/23/2020 | A | NR |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Energy code compliance | 11/7/2019 | 11/12/2019 | 11/12/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 11/7/2019 | 11/8/2019 | 11/8/2019 | A | PASS |
Brandon Shaw
|
|
|
OK to insulate...
|
BLD-Wall Bracing | 10/17/2019 | 10/17/2019 | 10/17/2019 | P | PASS |
Brandon Shaw
|
|
|
shear // Jorha Phone #: ###-####
|
Routing - MECHANICAL | 9/30/2019 | | 9/30/2019 | | PASS |
Troy James
|
|
|
Revised manual j report
|
BLD-Foundation | 6/13/2019 | 6/13/2019 | 6/13/2019 | P | PASS |
Brandon Shaw
|
|
|
Victor Phone #: ###-####
|
BLD-Footing | 6/11/2019 | 6/12/2019 | 6/12/2019 | A | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
PubWorks Subgrade Approval | 6/12/2019 | 6/12/2019 | 6/12/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 12/21/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/21/2018 | | DONE |
|
|
|
|
Plan assigned to (RDP) | 11/19/2018 | 11/19/2018 | 11/28/2018 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 11/28/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/19/2018 | | 11/28/2018 | | PASS |
Rob Patrick
|
|
|
Apply one hour minimum review charge.
|
Plan assigned to (M_H) | 10/26/2018 | | 11/19/2018 | | DEFR |
Michael Hanson
|
|
|
Plan Mod...10/15 ePlan Status is at "Applicant Upload"
|
Routing - FIRE | 10/19/2018 | 10/19/2018 | 10/30/2018 | | PASS |
Erika Akin
|
|
|
|
Plan assigned to (RDP) | 10/5/2018 | 10/5/2018 | 10/26/2018 | | DEFR |
Rob Patrick
|
|
|
Plan Mod...10/15 ePlan Status is at "Applicant Upload"
|
Routing - PUBLIC WORKS | 10/19/2018 | | 10/22/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Grading-Hillside | 10/22/2018 | | 10/22/2018 | | CANC |
Melissa Jannusch
|
|
|
No hillside review needed. SUBGRADE inspection requried.
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
Routing - PLANNING | 10/19/2018 | | 10/19/2018 | | PASS |
Sue Cummings
|
|
|
Roof change
|
Plan assigned to (M_H) | 10/5/2018 | | 10/5/2018 | | DEFR |
Michael Hanson
|
|
|
Plan Mod - Original completed by RDP.
|
Plan Modification Accepted | | | 10/4/2018 | | DONE |
|
|
|
plan mod was before permit was issued but in ready status-changing slab on grade to a crawl space-sheets 0.0, 1.0, 2.0, 3.0, 4.0 & 4.1
|
OVERRIDE | | | 10/1/2018 | | |
|
|
|
|
Routing - FIRE | 10/1/2018 | 10/1/2018 | 10/1/2018 | | PASS |
Erika Akin
|
|
|
New SFH 3401 fire flow area, 1000 gpm available. Hydrant proximity, access and WUI checked.
|
Plan assigned to (RDP) | 8/1/2018 | 8/1/2018 | 10/1/2018 | | DONE |
Rob Patrick
|
|
|
08/20 sfd L2 ePlan...8/14 Failed for possible re-design due to setback issue
|
Routing - PLAN CHECK | 10/1/2018 | | 10/1/2018 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/1/2018 | | DONE |
Rob Patrick
|
|
|
|
Override - Parcel Holds | | | 10/1/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 10/1/2018 | | DONE |
|
|
|
met
|
Routing - PLANNING | 9/25/2018 | | 9/25/2018 | | PASS |
Sue Cummings
|
|
|
Parking issue solved with PUD modification. O.K. now
|
Routing - FIRE | 8/10/2018 | 8/10/2018 | 8/15/2018 | | FAIL |
Tim Frost
|
|
|
New SFH
Failed per building code plan reviewers request.
|
1st review completed | | | 8/14/2018 | | FAIL |
Rob Patrick
|
|
|
|
Routing - PLAN CHECK | 8/1/2018 | | 8/14/2018 | | FAIL |
Rob Patrick
|
|
|
Failed for possible re-design due to setback issue
|
Routing - MECHANICAL | 8/1/2018 | | 8/6/2018 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 8/1/2018 | 8/4/2018 | 8/2/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 8/1/2018 | | 8/1/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/1/2018 | | 8/1/2018 | | PASS |
Morgan Webb
|
|
|
Address is not in hillside, see parcel tag
|
Plans ACCEPTED BY PLAN TECH | | | 8/1/2018 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 8/1/2018 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/1/2018 | | DONE |
|
|
|
|
Intake Approval | | | 8/1/2018 | | PASS |
|
|
|
|
Application received | | | 7/31/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 31 2018 2:58PM
|
Meeting | | | 7/31/2018 | | DONE |
|
|
|
Sent email to josh that a 404 application will be needed
|
Routing - PLANNING | 8/1/2018 | | | | FAIL |
|
|
|
Rear setback is 20 ft. for parking
|