BLD-Final | 8/20/2018 | 8/20/2018 | 8/20/2018 | P | PASS |
Brandon Shaw
|
|
|
call 30 mins ahead- Dustin Phone #: ###-####
|
DOC - Permit Finaled | 8/20/2018 | 8/20/2018 | 8/20/2018 | P | PASS |
Brandon Shaw
|
|
|
|
Issue PAID IN FULL permit | | | 8/14/2018 | | DONE |
|
|
|
|
Telephone call | | | 8/3/2018 | | DONE |
|
|
|
called and left a message on Mike's cell. GC needs to update his contact info-sent an email to him
|
Permit Ready to Issue | | | 8/3/2018 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 7/31/2018 | | 8/2/2018 | | PASS |
Josh Bogle
|
|
|
08/06 egress window, paper
|
Routing - PLAN CHECK | 8/2/2018 | | 8/2/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 8/2/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 8/2/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 8/2/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/2/2018 | | DONE |
Josh Bogle
|
|
|
|
Routing Walk-In (Zoning) | 7/31/2018 | 7/31/2018 | 7/31/2018 | P | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 7/31/2018 | 7/31/2018 | 7/31/2018 | P | PASS |
Josh Bogle
|
|
|
took in as level 2 - lobby busy
|
Application received | | 7/31/2018 | | | |
|
|
|
|