Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD18-02757
StatusFinaled
Name MJ HALL REPAIRS
Site Address 8620 W EMERALD ST Unit: STE 150
Project NameIdaho Department of Correction
Customer Number 
ePlanReviewYes
Description
**(IDAHO DEPARTMENT OF CORRECTIONS – SUITE #150)** Permit is to remodel an existing 4,666 sq. ft. tenant space by dividing it into two separate tenant spaces, this office tenant space is to be 3,306 sq. ft. and the remaining 1,363 sq. ft. is to be an unoccupied tenant space created under BLD18-02755. Approval is contingent upon adhering to the approved plans on file. Work to include: construction of select interior nonbearing wall to demise tenant spaces and interior finishes in compliance with Ch. 8 of the current IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 10/17/201811/7/2018 DONE
mailed 11-12
Second Notice 9/20/201810/12/2018 DONE
mailed 10-15-18
First Notice 9/6/20189/10/2018 DONE
mailed 9-11-18
Permanent Occupancy  8/27/2018 DONE
BLD-Final8/23/20188/24/20188/24/2018APASS
DetailsMike Jordan
Matt Phone #: ###-####. ok for temp occ.
FIRE-Final Inspection8/23/20188/23/20188/23/2018PPASS
DetailsJim Page
No fire sprinkler modifications, no fire alarm modifications, fire extinguishers are placed with current inspection tags. Final life fire safety inspection complete.

mat Phone #: ###-####
Plan assigned to (JG)8/16/20188/16/20188/22/2018 PASS
DetailsJavier Guzman
1st rev comp, 8/14 L1 Idaho Department of Correction ePlan**
Routing - PLAN CHECK8/21/2018 8/22/2018 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  8/22/2018 DONE
Permit Ready to Issue  8/22/2018 DONE
Met
Print Occupancy Form  8/22/2018 DONE
Issue PAID IN FULL permit  8/22/2018 DONE
Route to Impact Fee Review8/16/20188/19/20188/17/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Plan assigned to (JG)8/8/20188/8/20188/16/2018 PASS
DetailsJavier Guzman
8/14 L1 Idaho Department of Correction ePlan**
Routing - PLAN CHECK8/8/2018 8/16/2018 FAIL
DetailsJavier Guzman
1st review completed  8/16/2018 FAIL
DetailsJavier Guzman
Permit Ready to Issue  8/16/2018 DONE
NEED- all met
GC FORM
REVISED VALUE
CHANGE STATUS TO (REV)  8/16/2018 DONE
Put in FEE status by mistake, needs additional review
Routing - PLAN CHECK8/16/2018 8/16/2018 FAIL
DetailsJavier Guzman
Intake Approval  8/8/2018 PASS
DetailsJavier Guzman
Routing - Addressing8/8/2018 8/8/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS8/8/2018 8/8/2018 PASS
DetailsMorgan Webb
Intake Approval  8/2/2018 FAIL
DetailsMichael Hanson
This permit has failed prescreen due to the following:
1. Missing exit signs and emergency lighting devices (existing or new).
Application received  8/1/2018 DONE
Application submitted via PDS Online on Aug 1 2018 11:37AM