Permit Information
Permit NumberBLD18-02783
StatusFinaled
Name BLUE RAVEN SOLAR LLC
Site Address 11938 W SILVERKING DR
Project NameSusan Hadley
Customer Number 
ePlanReviewYes
Description
Permit for a Roof Mounted, Grid Tied Photovoltaic System with microinverters and combiners. 16 panels in 3 arrays connecting to existing electrical service panel. No structural alteration is required per stamped and signed engineering evaluation documents. All work per plans, manufacturers specs, engineering and local codes. A separate electrical permit is required. ***RDP***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/6/201811/7/201811/7/2018ADONE
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by BRS Permitting
DOC - Permit Finaled11/7/201811/7/201811/7/2018PPASS
DetailsMike Jordan
Plan assigned to (RDP)11/1/201811/1/201811/1/2018 CANC
DetailsCandy A. Nichols
Routing - PLAN CHECK11/1/2018 11/1/2018 FAIL
DetailsRob Patrick
plan mod cancelled-changed status back to ISS
Routing - PLANNING11/1/2018 11/1/2018 CANC
DetailsCandy A. Nichols
CHANGE STATUS TO (ISS)  11/1/2018 DONE
plan mod was cancelled and so we changed status back to issued
Plan resubmittals received  11/1/2018 DONE
adding one more solar panel (17 total)
Plan assigned to (RDP)8/8/20188/8/20188/8/2018 DONE
DetailsRob Patrick
08/09 PV ePlan
Plan assigned to (JAB) Josh8/3/20188/3/20188/8/2018 DEFR
DetailsJosh Bogle
08/09 PV, ePlan
Routing - PLAN CHECK8/8/2018 8/8/2018 PASS
DetailsRob Patrick
1st review completed  8/8/2018 DONE
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  8/8/2018 DONE
DetailsRob Patrick
Permit Ready to Issue  8/8/2018 DONE
all requirements met
Issue PAID IN FULL permit  8/8/2018 DONE
Inspection Record Card- Bld  8/8/2018 DONE
Routing - PLANNING8/3/2018 8/3/2018 PASS
DetailsJeff Lowe
Plans ACCEPTED BY PLAN TECH  8/3/2018 DONE
Intake Approval  8/3/2018 PASS
Recd Pcfee & Taken To Pln CK  8/3/2018 DONE
Application received  8/2/2018 DONE
Application submitted via PDS Online on Aug 2 2018 4:31PM