Letter of compliance/Occupancy | | | 5/3/2019 | | DONE |
|
|
|
|
BLD-Final | 5/1/2019 | 5/1/2019 | 5/1/2019 | P | PASS |
Brandon Shaw
|
|
|
|
DOC - Permit Finaled | 5/1/2019 | 5/1/2019 | 5/1/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 4/11/2019 | 4/12/2019 | 4/12/2019 | A | PEND |
Brandon Shaw
|
|
|
Need step and a landing at exterior door...
|
BLD-Energy code compliance | 12/5/2018 | 12/6/2018 | 12/6/2018 | A | PASS |
Dave Hannah
|
|
|
Chris Phone #: ###-####
|
BLD-Framing/Rough-in | 11/19/2018 | 11/20/2018 | 11/20/2018 | P | PASS |
Dave Hannah
|
|
|
Chris Phone #: ###-####
|
BLD-Footing | 8/23/2018 | 8/23/2018 | 8/23/2018 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Foundation | 8/22/2018 | 8/23/2018 | 8/23/2018 | A | NR |
Dave Hannah
|
|
|
rebar // Chris Phone #: ###-####
|
Plan Reviewer's activity | | | 8/16/2018 | | |
Brian McGowan
|
|
|
Builder came in to ask if he could switch the direction of proposed pony wall and floor joists and increase them to 11-7/8". No beams, bearing or structure other than the floor is altered. I told him no plan modification would be required. BJM
|
OVERRIDE | | | 8/7/2018 | | |
|
|
|
|
Routing Walk-In (BLD) | 8/7/2018 | 8/7/2018 | 8/7/2018 | P | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 8/2/2018 | 8/2/2018 | 8/7/2018 | | PASS |
Josh Bogle
|
|
|
08/08 addition, paper - 1st done
|
Routing - PLAN CHECK | 8/7/2018 | | 8/7/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 8/7/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 8/7/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/7/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 8/7/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/7/2018 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 8/3/2018 | 8/3/2018 | 8/3/2018 | A | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 8/3/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | | | 8/3/2018 | | FAIL |
Josh Bogle
|
|
|
basement plan, energy code, smokies
|
Routing - PLANNING | 8/2/2018 | | 8/3/2018 | | PASS |
Sue Cummings
|
|
|
|
Intake Approval | | | 8/2/2018 | | PASS |
|
|
|
ok to take in as level 2 per Josh B.
|
Application received | | 8/2/2018 | | | |
|
|
|
|