Third Notice | | 7/15/2019 | 8/5/2019 | | DONE |
|
|
|
mailed 8-7-19
came back 8-12
|
Third Notice | | 5/11/2019 | 7/10/2019 | | DONE |
|
|
|
mailed 7-11
|
Second Notice | | 4/18/2019 | 5/6/2019 | | DONE |
|
|
|
mailed 5-10-19
|
First Notice | | 3/30/2019 | 4/8/2019 | | DONE |
|
|
|
mailed 4-11-19
|
Permanent Occupancy | | | 3/20/2019 | | DONE |
|
|
|
|
BLD-Final | 3/11/2019 | 3/12/2019 | 3/12/2019 | A | PASS |
Jim Storey
|
|
|
Parker Phone #: ###-#### final ok
|
Telephone call | | | 3/11/2019 | | DONE |
|
|
|
called several times to let know temp c of o has expired-can't left message at ###-#### mailbox is full-office number rings once then makes a rings that sound different but goes nowhere. sent inspector to address to let themd know temp is expired-they called us back and we set the inspections up
|
BLD-Final | 3/4/2019 | 3/5/2019 | 3/5/2019 | A | NR |
Jim Storey
|
|
|
Parker Phone #: ###-#### need plm final.
|
BLD-Aging Inspection | 2/11/2019 | 2/11/2019 | 2/12/2019 | | PASS |
Jim Storey
|
|
|
OK for Perm Occ when Plumbing Signs off Perm.
|
BLD-Final | 12/7/2018 | 12/11/2018 | 12/11/2018 | A | PART |
Jim Sly
|
|
|
Parker Phone #: ###-#### OK for Temp Occ. OK for Perm Occ when Plumbing Signs off Perm.
|
FIRE-Final Inspection | 12/10/2018 | 12/11/2018 | 12/11/2018 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, escutcheons will be installed when received, final life fire safety inspection for area of work complete.
Parker. Requesting TCO Phone #: ###-####
|
Temporary Occupancy | 12/11/2018 | 3/11/2019 | 12/11/2018 | | DONE |
Candy A. Nichols
|
|
|
|
FIRE-Final Inspection | 12/7/2018 | 12/10/2018 | 12/10/2018 | A | FAIL |
Jim Page
|
|
|
Replace missing fire sprinkler escutcheons, total of three are missing. Service or replace emergency lights that are inoperable. Provide fire exitnguisher with cuurent inspection tag and install as discussed.
Parker Phone #: ###-####
|
Issue PAID IN FULL permit | | | 11/13/2018 | | DONE |
|
|
|
|
Plan assigned to (JG) | 8/10/2018 | 8/10/2018 | 10/26/2018 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 8/16 L2 Fish Market paper
|
Case Summary (BLD) | | | 10/26/2018 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/26/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/26/2018 | | DONE |
|
|
|
all met-NEED
GC-met
Rev cert of val-met
|
Print Occupancy Form | | | 10/26/2018 | | DONE |
|
|
|
|
Telephone call | | | 10/26/2018 | | DONE |
|
|
|
Spoke with Lowell informing him that the permit is ready and what is needed before issuance
|
Routing - PLAN CHECK | 10/19/2018 | | 10/26/2018 | | PASS |
Javier Guzman
|
|
|
|
Plan resubmittals received | | | 10/17/2018 | | DONE |
|
|
|
Resubmittals received 2 sets of the plan review report, 2 sets of sheets A-001, A101, A-601, P0.0, P1.1, P1.2, P2.1, M1.1, E0.0, E2.0D, E2.0E, E2.0L, E3.0, E4.0, E4.1- Took to JG
|
Routing - PLUMBING | 10/19/2018 | | 10/14/2018 | | PASS |
Dan Ediger
|
|
|
Per plans and ISPC
|
Route to Impact Fee Review | 8/18/2018 | 8/21/2018 | 8/20/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 8/10/2018 | | 8/18/2018 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 8/18/2018 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLUMBING | 8/15/2018 | | 8/16/2018 | | FAIL |
Bill VanDegrift
|
|
|
Move the floor drain out of the walk-in freezer. Install an approved receptor.
|
Routing - MECHANICAL | 8/14/2018 | | 8/15/2018 | | PASS |
Troy James
|
|
|
No mechanical work being performed at this time.
|
Routing - PUBLIC WORKS | 8/10/2018 | | 8/14/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Environmental | 8/10/2018 | | 8/13/2018 | | PASS |
Rick Christenson
|
|
|
Prep sink needs to be connected to exsiting Grease Interceptor.
|
Routing - Addressing | 8/10/2018 | | 8/10/2018 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/3/2018 | | DONE |
|
|
|
|
Intake Approval | | | 8/3/2018 | | PASS |
Javier Guzman
|
|
|
|
Pending Assignment by CDM | 8/3/2018 | | 8/3/2018 | | DONE |
Carl D Madsen
|
|
|
|
Application received | | 8/3/2018 | | | |
|
|
|
|