Telephone call | | | 12/26/2019 | | DONE |
|
|
|
Spoke with Josh Kincaid about final values again. Another final values was submitted. Last values had the grading and foundation permit values in it. A new one has been uploaded and dated 12/26/19.
|
Telephone call | | | 12/13/2019 | | DONE |
|
|
|
per email from Josh Kincaid, a new certificate of value was submitted. The final value that was submitted on 12/4/19 included the grading permit value.
The new 306 form is without the grading value.
I adjusted the value and fees. Sent the fees due to Josh.
|
Print Statement | | | 12/4/2019 | | DONE |
|
|
|
|
First Notice | | 10/28/2019 | 11/26/2019 | | DONE |
|
|
|
mailed 12-2-19
|
BLD-Final | 10/17/2019 | 10/18/2019 | 10/18/2019 | A | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-####
|
Permanent Occupancy | | | 10/18/2019 | | DONE |
|
|
|
|
PubWorks Occupancy Approval | 10/17/2019 | 10/17/2019 | 10/17/2019 | | DONE |
Tiffany Lowery
|
|
|
|
Zoning Approval | 10/15/2019 | 10/15/2019 | 10/15/2019 | | PASS |
Katelyn Menuge
|
|
|
Per DRH18-00267
|
Override - Parcel Holds | | | 10/15/2019 | | |
|
|
|
|
FIRE-Final Inspection | 8/14/2019 | 8/15/2019 | 8/15/2019 | A | PASS |
Jim Page
|
|
|
Previously noted items have been completed, final life fire safety inspection complete.
Mike Phone #: ###-####
|
BLD-Final | 7/18/2019 | 7/19/2019 | 7/19/2019 | P | NR |
Jim Storey
|
|
|
mIKE Phone #: ###-#### ok to stock racking per fire tco
|
FIRE-Final Inspection | 7/18/2019 | 7/19/2019 | 7/19/2019 | A | PART |
Jim Page
|
|
|
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are placed with current inspection tags. Partial final inspection complete for life fire safety, last remaining items to be completed before final life fire safety sign off is provide FACP signage on door leading to fire panel, install fire lane signage as specified in review comments under notes 9 and 10 of the building permit fire code review comments. Need to verify if old fire pump room is staying in place ot being removed, if existing pump room stays then fire sprinklers will need to be provided. 30 day TCO authorized per conversation with Ron Johnson with Boise Fire contingent on the 3 noted items getting completed.
mIKE Phone #: ###-####
|
FIRE-Final Inspection | 7/15/2019 | 7/16/2019 | 7/16/2019 | P | CANC |
Jim Page
|
|
|
Cancelled per conversation with point of contact, fire alarm inspection has been cooridanted with me, Apex and any parties associated with access to the existing building for 7AM on 19JULY2019. Mike Phone #: ###-####
|
BLD-Final | 7/16/2019 | 7/16/2019 | 7/16/2019 | P | CANC |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 7/14/2019 | 7/15/2019 | 7/15/2019 | A | FAIL |
Jim Page
|
|
|
Relocate exit signs that are blocked due to racking placement. Fire hydrants need to be rotated so that the large hose connection (Steamer Connection) is pointing at the fire lane as required.
Jim Wellman Phone #: ###-#### Inspection requested via web by Jim Wellman
|
BLD-Final | 7/14/2019 | 7/15/2019 | 7/15/2019 | A | NR |
Jim Storey
|
|
|
Jim Wellman Phone #: ###-#### Inspection requested via web by Jim Wellman
|
FIRE-Conference | 7/2/2019 | 7/3/2019 | 7/3/2019 | A | DONE |
Jim Page
|
|
|
Fire conference is complete, items that are not associated with construction are not to be stored in the warehouse. As of this entry the racking permit has not been inspected, the fire alarms cannot be completed due to the fire alarm permit being under review and no life fire safety inspection has been performed. I spoke with Ron Johnson with Boise Fire Department and he agrees with my decision.
call ahead // Mike Phone #: ###-####
|
FIRE-Conference | 6/25/2019 | 6/26/2019 | 6/26/2019 | A | DONE |
Jim Page
|
|
|
Fire conference complete, per international fire code, section 1013.1 requires exit signs to be visible within 100 feet or the listed viewing distance for the sign, whichever is less, from the nearest visible exit sign.
Mike Phone #: ###-####
|
BLD-Conference | 6/4/2019 | 6/5/2019 | 6/5/2019 | P | DONE |
Jim Page
|
|
|
Fire conference complete.
Mike-Conference with Fire inspector- please call about an hor before Phone #: ###-####
|
BLD-Framing/Rough-in | 5/7/2019 | 5/8/2019 | 5/8/2019 | P | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-#### fire pump rm ok to cover
|
BLD-Ceiling Grid Inspection | 4/18/2019 | 4/18/2019 | 4/18/2019 | P | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 4/12/2019 | 4/15/2019 | 4/15/2019 | A | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 4/9/2019 | 4/10/2019 | 4/10/2019 | A | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 4/8/2019 | 4/9/2019 | 4/9/2019 | A | CANC |
Mike Jordan
|
|
|
Mike Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 4/4/2019 | 4/5/2019 | 4/5/2019 | A | PART |
Jim Storey
|
|
|
Mike Phone #: ###-#### east side ok
|
BLD-Ceiling Grid Inspection | 3/25/2019 | 3/25/2019 | 3/25/2019 | P | PART |
Jim Storey
|
|
|
Mike Phone #: ###-#### ok to instal tile as progressing across ceilling.
|
FIRE-Conference | 3/19/2019 | 3/19/2019 | 3/19/2019 | A | DONE |
Jim Page
|
|
|
General contractor has been notified as of this date that fire hydrants around project need to be made active during construction.
|
Issue PAID IN FULL permit | | | 11/5/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/5/2018 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 8/15/2018 | 8/15/2018 | 10/23/2018 | | PASS |
Carl D Madsen
|
|
|
09/14 Western Power Sports New
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/23/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/23/2018 | | DONE |
|
|
|
TRENT@BRSARCHITECTS.CO
NEED
GC FORM
REVISED VALUE
(ESC18-00979)
|
Routing - FIRE | 10/10/2018 | 10/10/2018 | 10/22/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing Off Site - STRUCTURAL | 10/10/2018 | | 10/19/2018 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 10/10/2018 | | 10/19/2018 | | PASS |
Carl D Madsen
|
|
|
|
Route to Impact Fee Review | 9/28/2018 | 10/1/2018 | 10/1/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 8/15/2018 | 8/15/2018 | 9/28/2018 | | FAIL |
Erika Akin
|
|
|
Attached comments to case and emailed architect
|
Routing Off Site - STRUCTURAL | 8/15/2018 | | 9/28/2018 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 8/15/2018 | | 9/28/2018 | | FAIL |
Carl D Madsen
|
|
|
|
1st review completed | | | 9/28/2018 | | DONE |
|
|
|
|
Routing PW Environmental | 8/15/2018 | | 8/21/2018 | | PASS |
Rick Christenson
|
|
|
|
Routing - MECHANICAL | 8/15/2018 | | 8/20/2018 | | PASS |
Troy James
|
|
|
|
Routing PW Street Lights | 8/15/2018 | | 8/20/2018 | | PASS |
Tom Marshall
|
|
|
|
Routing - Design Review | 8/15/2018 | | 8/16/2018 | | PASS |
Katelyn Menuge
|
|
|
DRH18-00267
|
Routing - Addressing | 8/15/2018 | | 8/16/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PLUMBING | 8/15/2018 | | 8/16/2018 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing PW Solid Waste | 8/15/2018 | | 8/16/2018 | | PASS |
Evan Carpenter
|
|
|
|
Routing - PLANNING | 8/15/2018 | | 8/15/2018 | | PASS |
David Moser
|
|
|
warehouse is an allowed use in M-1 zone, See DRH18-00267
|
Recd Pcfee & Taken To Pln CK | | | 8/15/2018 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 8/15/2018 | | 8/15/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 8/15/2018 | | 8/15/2018 | | PASS |
Michael Zawacki
|
|
|
Void. Please refer to ESC18-00979 for project.
|
Routing PW Sewer Design | 8/15/2018 | | 8/15/2018 | | PASS |
DeAnn Brown
|
|
|
No sewer connections in new building addition.
|
Routing PW Drainage | 8/15/2018 | | 8/15/2018 | | PASS |
Brian Murphy
|
|
|
|
Intake Approval | | | 8/13/2018 | | PASS |
|
|
|
|
Application received | | | 8/3/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 3 2018 12:06PM
|