BLD-Final | 2/11/2019 | 2/11/2019 | 2/11/2019 | P | PASS |
Jim Storey
|
|
|
Access Code is 9378. Plans by Furnace Phone #: ###-#### Inspection requested via web by Jarrod Nelson
|
DOC - Permit Finaled | 2/11/2019 | 2/11/2019 | 2/11/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Blower Door Test Results | 2/11/2019 | 2/11/2019 | 2/11/2019 | P | DONE |
Jim Storey
|
|
|
Access Code is 9378. Plans by Furnace Phone #: ###-#### Inspection requested via web by Jarrod Nelson 3.49
|
BLD-Wall Bracing | 11/28/2018 | 11/28/2018 | 11/28/2018 | P | PASS |
Jim Storey
|
|
|
Jared-interior shear (gibson board) Phone #: ###-####
|
BLD-Energy code compliance | 11/21/2018 | 11/23/2018 | 11/23/2018 | A | PASS |
Jim Storey
|
|
|
Batt Insullation Inspection. Phone #: ###-#### Inspection requested via web by Jarrod Nelson
|
BLD-Framing/Rough-in | 11/19/2018 | 11/20/2018 | 11/20/2018 | P | PASS |
Brandon Shaw
|
|
|
MEC inspection in AM. Framing for PM. Phone #: ###-#### Inspection requested via web by Jarrod Nelson
|
BLD-Energy code compliance | 11/15/2018 | 11/16/2018 | 11/16/2018 | A | PART |
Dave Hannah
|
|
|
Energy Seal Phone #: ###-#### Inspection requested via web by Jarrod Nelson air seal ok
|
BLD-Framing/Rough-in | 11/15/2018 | 11/16/2018 | 11/16/2018 | A | PEND |
Dave Hannah
|
|
|
Framing Inspection Phone #: ###-#### Inspection requested via web by Jarrod Nelson c/n on site ok to insulate after mec r/i passes
|
BLD-Wall Bracing | 11/6/2018 | 11/7/2018 | 11/7/2018 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Jarrod Nelson
|
Inspection Record Card- Bld | | | 9/26/2018 | | DONE |
|
|
|
|
BLD-Footing | 8/24/2018 | 8/27/2018 | 8/27/2018 | P | PASS |
Jim Storey
|
|
|
Derek Phone #: ###-####
|
BLD-Footing | 8/23/2018 | 8/24/2018 | 8/24/2018 | P | CANC |
Jim Storey
|
|
|
Derek Phone #: ###-####
|
Issue PAID IN FULL permit | | | 8/23/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/23/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 8/20/2018 | | |
|
|
|
|
Plan assigned to (RDP) | 8/7/2018 | 8/7/2018 | 8/20/2018 | | DONE |
Rob Patrick
|
|
|
8/24 sfd L2 ePlan...8/14 Failed; Corrections Required
|
Routing - PLAN CHECK | 8/20/2018 | | 8/20/2018 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/20/2018 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 8/20/2018 | | DONE |
|
|
|
met
|
Routing - PLAN CHECK | 8/7/2018 | | 8/14/2018 | | FAIL |
Rob Patrick
|
|
|
Corrections Requirerd
|
1st review completed | | | 8/14/2018 | | FAIL |
Rob Patrick
|
|
|
Corrections Required
|
Route to Impact Fee Review | 8/7/2018 | 8/10/2018 | 8/8/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Plans ACCEPTED BY PLAN TECH | | | 8/7/2018 | | DONE |
|
|
|
|
Intake Approval | | | 8/7/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/7/2018 | | DONE |
|
|
|
|
Routing - MECHANICAL | 8/7/2018 | | 8/7/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 8/7/2018 | | 8/7/2018 | | PASS |
Sue Cummings
|
|
|
See redline...Maximum driveway width is 33 ft. in front setback
|
Routing - Addressing | 8/7/2018 | | 8/7/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/7/2018 | | 8/7/2018 | | PASS |
Rachael Beierle
|
|
|
|
Application received | | | 8/3/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 3 2018 2:47PM
|