Permit Information
Permit NumberBLD18-02804
StatusFinaled
Name LAYTON CONSTRUCTION
Site Address 6663 S EISENMAN RD Unit: 130
Project NameGowen Industrial Warehouse-C S
Customer Number 
ePlanReviewYes
Description
(VANILLA - BUILDING ā€œCā€ - STE 130) NO OCCUPANCY ALLOWED UNDER THIS PERMIT. TENANT SHALL APPLY FOR CERTIFICATE OF OCCUPANCY PRIOR TO OCCUPYING THE SPACE. The fire sprinkler system is used for building area increase and for fire area. Permit is to construct tenant improvements within an existing 10,368 sq. ft. vanilla tenant space (1,724 sq. ft. office area + 8,554 sq. ft. warehouse area). within the new 51,420 sq. ft. building (Shell under BLD17-02817). Approval is contingent upon adhering to the approved plans on file. Work to include: concrete slab, construction of interior non-bearing walls to make a closet, a conference/break room, a hall, (2) offices, open office area and (2) accessible restrooms, new door/door frames, millwork, Hi/Lo drinking fountain, suspended acoustic and gypsum ceiling, light fixtures, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. Note: Special Inspection is required, see attached 310 form. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice12/27/201812/27/20181/8/2019 DONE
DetailsJim Storey
mailed 1-11-19
BLD-Final12/26/201812/27/201812/27/2018APASS
DetailsJim Storey
Tim Phone #: ###-####
DOC - Permit Finaled12/27/201812/27/201812/27/2018PPASS
DetailsJim Storey
FIRE-Final Inspection12/26/201812/26/201812/26/2018PPASS
DetailsJim Page
No fire sprinkler modifications, no fire alarm modifications, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.

Tim Phone #: ###-####
BLD-Ceiling Grid Inspection11/1/201811/1/201811/1/2018PPASS
DetailsJim Storey
Tim Phone #: ###-####
BLD-Framing/Rough-in10/8/201810/9/201810/9/2018APASS
DetailsJim Storey
Tyler Phone #: ###-####
BLD-Framing/Rough-in9/27/20189/28/20189/28/2018PPASS
DetailsJim Storey
partial framing insp for ceiling joists// Tim Brewer Phone #: ###-####
Plan assigned to (JG)8/23/20188/23/20189/17/2018 PASS
DetailsJavier Guzman
1st rev comp, 9/04 L2 Gowen Industrial Warehouse ePlan
Routing - PLAN CHECK9/10/2018 9/17/2018 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  9/17/2018 DONE
Permit Ready to Issue  9/17/2018 DONE
met
Issue PAID IN FULL permit  9/17/2018 DONE
Inspection Record Card- Bld  9/17/2018 DONE
Route to Impact Fee Review9/8/20189/11/20189/10/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  9/8/2018 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK8/23/2018 9/8/2018 FAIL
DetailsJavier Guzman
Routing Off Site - STRUCTURAL8/23/2018 9/7/2018 PASS
DetailsJavier Guzman
signed of in ePlan by AHJ Engineers Chris Holladay
Routing - FIRE8/23/20188/23/20189/4/2018 PASS
DetailsErika Akin
Attached comments to case
Routing - MECHANICAL8/23/2018 8/24/2018 PASS
DetailsTroy James
Routing - PLUMBING8/23/2018 8/23/2018 PASS
DetailsDan Ediger
Redline note
Routing - Design Review8/23/2018 8/23/2018 PASS
DetailsKatelyn Menuge
Routing - Addressing8/23/2018 8/23/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS8/23/2018 8/23/2018 PASS
DetailsRachael Beierle
Routing - Erosion and Sediment8/23/2018 8/23/2018 PASS
DetailsMichael Zawacki
TI on new construction, no new ESC permit needed.
Intake Approval  8/22/2018 PASS
DetailsJavier Guzman
Application received  8/3/2018 DONE
Application submitted via PDS Online on Aug 3 2018 3:42PM