BLD-Final | 11/4/2019 | 11/4/2019 | 11/5/2019 | P | PASS |
Brandon Shaw
|
|
|
Call when on the way to meet // Matt Phone #: ###-####
|
DOC - Permit Finaled | 11/5/2019 | 11/5/2019 | 11/5/2019 | P | PASS |
Brandon Shaw
|
|
|
|
PubWorks Occupancy Approval | 11/5/2019 | 11/5/2019 | 11/5/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s design professional indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
OVERRIDE | | | 11/4/2019 | | |
|
|
|
|
Plan assigned to (RDP) | 10/30/2019 | 10/30/2019 | 11/4/2019 | | DONE |
Rob Patrick
|
|
|
11/18 sfd L2 PAPER...11/1 delivered plans to Melissa
|
Routing PW Grading-Hillside | 11/4/2019 | | 11/4/2019 | | PASS |
Melissa Jannusch
|
|
|
PLAN MOD APPROVED.
|
Routing - PUBLIC WORKS | 11/4/2019 | | 11/4/2019 | | PASS |
Candy A. Nichols
|
|
|
|
Routing - PLAN CHECK | 11/4/2019 | | 11/4/2019 | | PASS |
Rob Patrick
|
|
|
Grading Plan change only. Melissa review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/4/2019 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 11/4/2019 | | DONE |
|
|
|
plan mod
|
CHANGE STATUS TO (ISS) | | | 11/4/2019 | | DONE |
|
|
|
PLAN MOD
|
Plan Reviewer's activity | | | 11/1/2019 | | |
|
|
|
Delivered entire plan set to Melissa for her review.
|
BLD-Conference | 10/29/2019 | 10/30/2019 | 10/30/2019 | A | DONE |
Brandon Shaw
|
|
|
please call 1/2 hr prior. Was hoping to do a courtesy final. Thanks Jim Phone #: ###-#### Inspection requested via web by James Larkin
|
Plan Modification Accepted | | | 10/30/2019 | | DONE |
|
|
|
James from Paradigm contruction submitted 3 paper copies of the original grading plan and the modified grading plan - specified on the title page. 6 copies in all
|
BLD-Energy code compliance | 6/26/2019 | 6/27/2019 | 6/27/2019 | P | PASS |
Brandon Shaw
|
|
|
Please call 1/2 hr prior. Thanks Jim Phone #: ###-#### Inspection requested via web by James Larkin
|
BLD-Framing/Rough-in | 6/25/2019 | 6/25/2019 | 6/25/2019 | P | PASS |
Brandon Shaw
|
|
|
please call 1/2 hr prior Thanks Jim Phone #: ###-#### Inspection requested via web by James Larkin
|
FIRE-Supply Line Cover | 6/19/2019 | 6/19/2019 | 6/19/2019 | A | CANC |
Jim Page
|
|
|
Tenting inspection needs to be requested by the fire sprinkler contractor, this request is cancelled and future fire sprinkler related inspection must be done under associated FIR permit.
Insulation or tent over fire sprinkler piping that is in attic area of project. Not sure if we ordered the correct inspection? Phone #: ###-#### Inspection requested via web by James Larkin
|
BLD-Wall cover | 6/13/2019 | 6/14/2019 | 6/14/2019 | A | PASS |
Mike Jordan
|
|
|
Fire protection on Soffit cans. 2 layers of type x 5\8. Phone #: ###-#### Inspection requested via web by James Larkin
|
BLD-Wall Bracing | 6/3/2019 | 6/3/2019 | 6/3/2019 | P | PASS |
Jim Storey
|
|
|
Jim Phone #: ###-####
|
BLD-Wall Bracing | 5/24/2019 | 5/28/2019 | 5/28/2019 | P | CANC |
Brandon Shaw
|
|
|
Please call 1/2 hr prior. Phone #: ###-#### >> Inspection requested via web by James Larkin Inspection cancelled from web by: James Larkin
|
BLD-Wall Bracing | 5/23/2019 | 5/24/2019 | 5/24/2019 | A | CANC |
Brandon Shaw
|
|
|
Please call 1/2 her prior. Thanks Jim Phone #: ###-#### >> Inspection requested via web by James Larkin Inspection cancelled from web by: James Larkin
|
BLD-Wall Bracing | 5/22/2019 | 5/23/2019 | 5/23/2019 | P | CANC |
Brandon Shaw
|
|
|
Please Call 1/2 prior Phone #: ###-#### >> Inspection requested via web by James Larkin Inspection cancelled from web by: James Larkin
|
BLD-Foundation | 4/26/2019 | 4/29/2019 | 4/29/2019 | A | PASS |
Dave Hannah
|
|
|
Edgar- foundation wall Phone #: ###-####
|
BLD-Footing | 4/23/2019 | 4/23/2019 | 4/23/2019 | P | PASS |
Brandon Shaw
|
|
|
edgir Phone #: ###-####
|
BLD-Footing | 4/22/2019 | 4/22/2019 | 4/22/2019 | P | FAIL |
Jim Storey
|
|
|
retaining wall // Edgar Phone #: ###-#### no vert steel// bar in dirt at steps/ no plans on site.
|
BLD-Foundation | 2/1/2019 | 2/1/2019 | 2/1/2019 | P | PASS |
Brandon Shaw
|
|
|
wall- Ben Phone #: ###-####
|
BLD-Footing | 1/18/2019 | 1/18/2019 | 1/18/2019 | A | PASS |
Brandon Shaw
|
|
|
Retaining wall footings
|
BLD-Foundation | 12/10/2018 | 12/11/2018 | 12/11/2018 | P | CANC |
Brandon Shaw
|
|
|
Please call 1/2 hr prior. Thanks Jim Phone #: ###-#### Inspection requested via web by James Larkin
|
BLD-Foundation | 12/10/2018 | 12/11/2018 | 12/11/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress... Frost protection is reqired
|
BLD-Footing | 11/28/2018 | 11/28/2018 | 11/28/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
PubWorks Subgrade Approval | 11/28/2018 | 11/28/2018 | 11/28/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 11/27/2018 | 11/27/2018 | 11/27/2018 | P | NR |
Brandon Shaw
|
|
|
Need soil sub-grade submitted and approved by PW...
|
BLD-Footing | 11/26/2018 | 11/27/2018 | 11/27/2018 | A | CANC |
Brandon Shaw
|
|
|
Please call 1/2 hr prior. Thanks Jim Phone #: ###-#### >> Inspection requested via web by James Larkin Inspection cancelled from web by: James Larkin
|
Issue PAID IN FULL permit | | | 10/16/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 10/1/2018 | | |
|
|
|
|
Plan assigned to (RDP) | 8/13/2018 | 8/13/2018 | 10/1/2018 | | DONE |
Rob Patrick
|
|
|
08/30 sfd L2 Paper...8/28 Failed: Multiple Corrections Required...9-14 Delivered to Melissa for review
|
Telephone call | | | 10/1/2018 | | DONE |
|
|
|
Called James to advise permit is ready pending GC form and gave fees due
|
Permit Ready to Issue | | | 10/1/2018 | | DONE |
|
|
|
Need - met
GC Form ( RCE number doesn't match GC name)
|
Routing PW Grading-Hillside | 10/1/2018 | | 10/1/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing - PUBLIC WORKS | 10/1/2018 | | 10/1/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - PLAN CHECK | 10/1/2018 | | 10/1/2018 | | PASS |
Rob Patrick
|
|
|
|
Case Summary (BLD) | | | 10/1/2018 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/1/2018 | | DONE |
Rob Patrick
|
|
|
|
Inspection Record Card- Bld | | | 10/1/2018 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 9/28/2018 | | |
|
|
|
Took 2 plan sets and 2 new engineering document sets to Melissa.
|
Route to Impact Fee Review | 9/25/2018 | 9/28/2018 | 9/26/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 9/25/2018 | 9/25/2018 | 9/25/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing - PLAN CHECK | 9/25/2018 | | 9/25/2018 | | FAIL |
Rob Patrick
|
|
|
Foundation calcs were supplied on 2012 IBC software. Emailed for new engineering docs.
|
Plan resubmittals received | | | 9/25/2018 | | DONE |
|
|
|
received two copies of structual calc package; taken to Rob Patrick
|
Routing PW Grading-Hillside | 9/21/2018 | | 9/21/2018 | | FAIL |
Melissa Jannusch
|
|
|
Retaining wall calculation corrections requested via e-mail to applicant.
|
Plan Reviewer's activity | | | 9/14/2018 | | |
Rob Patrick
|
|
|
Delivered Plan set to Melissa for her review.
|
Plan resubmittals received | | | 9/12/2018 | | DONE |
|
|
|
Two copies on small site plan, two copies of Structural Calcs and two full new copies of plans sheets 1-7. taken to Rob
|
1st review completed | | | 8/28/2018 | | FAIL |
Rob Patrick
|
|
|
|
Routing - PLAN CHECK | 8/27/2018 | | 8/28/2018 | | FAIL |
Rob Patrick
|
|
|
Multiple corrections Required
|
Routing - FIRE | 8/23/2018 | 8/13/2018 | 8/27/2018 | | FAIL |
Erika Akin
|
|
|
Attached comments to case and plans and emailed applicant
|
Plan Reviewer's activity | | | 8/27/2018 | | |
|
|
|
8/27 Delivered paper plan set and documents to Troy for mechanical review.
|
Routing - MECHANICAL | | | 8/27/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | | | 8/27/2018 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 8/23/2018 | | 8/23/2018 | | PASS |
Andy J. Long
|
|
|
ESC site map and project narrative approved. Certified RP & PD. Site preparation inspection is required prior to earthwork.
|
Routing PW Grading-Hillside | 8/14/2018 | | 8/23/2018 | | FAIL |
Melissa Jannusch
|
|
|
Retaining walls need corrections. Have contacted Kaleb Jones at Performance engineering and requested approval from the geotech for bearing capacity or updates to calculations --MMJ
|
Routing - PUBLIC WORKS | 8/23/2018 | | 8/23/2018 | | FAIL |
Morgan Webb
|
|
|
|
Routing PW Sewer Rating | 8/14/2018 | | 8/14/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Addressing | 8/13/2018 | | 8/14/2018 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/13/2018 | | DONE |
|
|
|
|
Intake Approval | | | 8/13/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/13/2018 | | DONE |
|
|
|
|
Intake Approval | | | 8/6/2018 | | FAIL |
Christina Prado
|
|
|
Need CFH approval letter, ESC Narrative
|
Application received | | 8/6/2018 | | | |
|
|
|
|
Routing - PUBLIC WORKS | 9/21/2018 | | | | FAIL |
|
|
|
SEE HILLSIDE FOR FAIL.
|