BLD-Final | 2/12/2020 | 2/12/2020 | 2/12/2020 | P | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 2/12/2020 | 2/12/2020 | 2/12/2020 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 11/29/2018 | 11/30/2018 | 11/30/2018 | A | PASS |
Jim Page
|
|
|
Final life fire safety inspection for racking complete, site survey by TVFP shows that sprinkler protection in areea is adequate for type of storage.
Tom Phone #: ###-####
|
Plan assigned to (BJM) | 8/22/2018 | 8/22/2018 | 11/13/2018 | | DONE |
Brian McGowan
|
|
|
Racking L-2- Corrections Required
|
Routing - PLAN CHECK | 11/13/2018 | | 11/13/2018 | | PASS |
Brent Moore
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/13/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 11/13/2018 | | DONE |
|
|
|
NEED - All met - email permits to Tom - tomf@nwhs.com
GC (not on file)
applicant is GC
|
Issue PAID IN FULL permit | | | 11/13/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/13/2018 | | DONE |
|
|
|
|
Routing - FIRE | 11/8/2018 | 11/8/2018 | 11/9/2018 | | PASS |
Tim Frost
|
|
|
Racking Resubmittal
|
Routing - PLAN CHECK | 10/23/2018 | | 10/30/2018 | | FAIL |
Brian McGowan
|
|
|
Racking is in front of doors still
|
1st review completed | | | 9/27/2018 | | FAIL |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 8/22/2018 | | 9/27/2018 | | FAIL |
Brian McGowan
|
|
|
|
Routing - FIRE | 8/22/2018 | 8/22/2018 | 9/7/2018 | | FAIL |
Erika Akin
|
|
|
Attached comments to case and emailed applicant
|
Intake Approval | | | 8/20/2018 | | PASS |
|
|
|
|
Application received | | | 8/7/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 7 2018 5:52PM
|